Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.5 LAccepted-Finance TEHSIL TRINTHA DISTRICT REASI 182311 JAMMU AND KASHMIR | REASI | JAMMU AND KASHMIR | 182311 | L1 | Accepted-Finance L1 | |
| 2 | L2₹39.8 L+₹4.2 L (11.9%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹40.4 L+₹4.9 L (13.7%)Accepted-Finance | L3 | Accepted-Finance L3 | |
| 4 | L4₹40.7 L+₹5.2 L (14.7%)Accepted-Finance | L4 | Accepted-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹82,000
Closing Date
1 Dec 2023, 4:00 pmClosed
Executive Engineer
Electric Division JPDCL Udhampur
Augmentations of 11.0.4 KVA Distribution Sub Station 250 to 400 KVA 3 Nos, 100 to 250 KVA 10 Nos, 63 to 100 KVA 10 Nos. ED Udhampur under UT Capex 2023-24
2023_PDD_237190_1
ED/Udh/106 of 2023-24 dt. 16-11-2023
Open Tender
Electrical Works
Turn-key
90 days
Udhampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Executive Engineer Electric Division JPDCL
₹82,000
20 Dec 2023
16 Nov 2023
4 Dec 2023
16 Nov 2023
1 Dec 2023
16 Nov 2023
16 Nov 2023 - 22 Nov 2023
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for augmentation of Sub Stations under the Jurisdiction of Sub Division-I JPDCL Udhampur. (I) Augmentations from 63 KVA to 100 KVA Sub Station at Laddan, (ii) 63 KVA to 100 KVA Sub Station at Lower Mansar and (iii) 63 to 100 KVA Sub Station at Banda Sui under UT Capex Budget 2023-24
11/0.433kV, 3-phase 100 KVA Distribution Transformer with bemetallic terminal connectors Energy Level-2, Aluminium wound and with LV Cable Box having detachable aluminium gland plate
185 mm² 1.1 kv Grade, PVC insulated stranded conductor FRLS type.
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 50 mm x 6 mm & 32mm x 3mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber with RCC slab cover.
LT Fuse Switch made of angle Iron 50X50X6, with aluminium Bus Bar strip 50X6mm fixed on Bus Bar Insualtor including clamps for fixing of switch
Painting of sub station with two coat of aluminium paint
Dismentalling of 63 KVA transformer/cable etc, & write back to Divisional Store of Electric Division JPDCL Udhampur
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Augmentation of Sub Stations under the Jurisdiction of Sub Division-II JPDCL Udhampur. (i) Augmentation from 63 KVA to 100 KVA Sub Station at Vishal, (ii) 63 KVA to 100 KVA Sub Station at Balpur, (iii) 63 KVA to 100 KVA Sub Station at Shatrari and (iv) 100 KVA to 250 KVA Sub Station at Dhamma under UT Capex Budget 2023-24.
11/0.433kV, 3-phase 100 KVA Distribution Transformer with bemetallic terminal connectors Energy Level-2, Aluminium wound and with LV Cable Box having detachable aluminium gland plate
11/0.433kV, 3-phase 250 KVA Distribution Transformer with bemetallic terminal connectors Energy Level-2, Copper wound and with LV Cable Box having detachable aluminium gland plate
185 mm² 1.1 kv Grade, PVC insulated stranded conductor FRLS type.
300 mm² 1.1 kv Grade, PVC insulated stranded conductor FRLS type.
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 50 mm x 6 mm & 32mm x 3mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber with RCC slab cover.
LT Fuse Switch made of angle Iron 50X50X6, with aluminium Bus Bar strip 50X6mm fixed on Bus Bar Insualtor including clamps for fixing of switch
Painting of sub station with two coat of aluminium paint
Dismentalling of 63 KVA transformer/cable etc, & write back to Divisional Store of Electric Division JPDCL Udhampur
Dismentalling of 100 KVA transformer/cable etc, & write back to Divisional Store of Electric Division JPDCL Udhampur
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Augmentation of Sub Stations under the Jurisdiction of Electric Sub Division JPDCL Chenani (i) Augmentation from 63 KVA to 100 KVA Sub Station at Kirchi, (ii) 63 KVA to 100 KVA Sub Station at Dudu and (iii) 100 KVA to 250 KVA Sub Station at Champeri under UT Capex Budget 2023-24
11/0.433kV, 3-phase 100 KVA Distribution Transformer with bemetallic terminal connectors Energy Level-2, Aluminium wound and with LV Cable Box having detachable aluminium gland plate
11/0.433kV, 3-phase 250 KVA Distribution Transformer with bemetallic terminal connectors Energy Level-2, Copper wound and with LV Cable Box having detachable aluminium gland plate
185 mm² 1.1 kv Grade, PVC insulated stranded conductor FRLS type.
300 mm² 1.1 kv Grade, PVC insulated stranded conductor FRLS type.
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 50 mm x 6 mm & 32mm x 3mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber with RCC slab cover.
LT Fuse Switch made of angle Iron 50X50X6, with aluminium Bus Bar strip 50X6mm fixed on Bus Bar Insualtor including clamps for fixing of switch
Painting of sub station with two coat of aluminium paint
Dismentalling of 63 KVA transformer/cable etc, & write back to Divisional Store of Electric Division JPDCL Udhampur
Dismentalling of 100 KVA transformer/cable etc, & write back to Divisional Store of Electric Division JPDCL Udhampur
Survey, Supply, Transportation, Carriage, Erection, Testing and Commissioning for Augmentation of Sub Stations under the Jurisdiction of Electric Sub Division JPDCL Ramnagar. (I) Augmentation from 63 KVA to 100 KVA Sub Station at Rehani Incha and (ii) 63 KVA to 100 KVA Sub Station at Garh under UT Capex Budget 2023-24
11/0.433kV, 3-phase 100 KVA Distribution Transformer with bemetallic terminal connectors Energy Level-2, Aluminium wound and with LV Cable Box having detachable aluminium gland plate
185 mm² 1.1 kv Grade, PVC insulated stranded conductor FRLS type.
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239. GI Strip for neutral earthing of size 50 mm x 6 mm & 32mm x 3mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts,refilled with earth enhancement materials and earth Chamber with RCC slab cover.
LT Fuse Switch made of angle Iron 50X50X6, with aluminium Bus Bar strip 50X6mm fixed on Bus Bar Insualtor including clamps for fixing of switch
Painting of sub station with two coat of aluminium paint
Dismentalling of 63 KVA transformer/cable etc, & write back to Divisional Store of Electric Division JPDCL Udhampur
JAI CHANDI MAA ENTERPRISES
M/S D.K TRADERS
RASRAJ ELECTRICALS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .