| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAdmitted-Finance 0 DHULJI KI DHANI DESURIYAN VISHNOIYAN SURPURA JODHPUR JODHPUR RAJASTHAN 342304 | JODHPUR | RAJASTHAN | 342304 | ₹9.4 L | L1 | Admitted-Finance |
| 2 | L2₹9.7 L+₹27,120 (2.88%)Admitted-Finance 86 7 CONVENT ROAD MITTAPUDUR SALEM DISTRICT TAMIL NADU 636016 | MITTAPUDUR | SALEM | TAMIL NADU | 636016 | ₹9.7 L+₹27,120 (2.88%) | L2 | Admitted-Finance |
| 3 | L3₹10.7 L+₹1.3 L (13.3%)Admitted-Finance TS NO 1396 NORTH MAIN STREET PUDUKOTTAI 622 001 | PUDUKOTTAI | PUDUKOTTAI | TAMIL NADU | 622001 | ₹10.7 L+₹1.3 L (13.3%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically not qualified as per criteria |
| Sl No | Description | Qty | Unit | SUN CONSTRUCTIONS L3 | D K SOLUTIONS L1 | V K L CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|
| 1.01 | Racking out the stone joints properly and re-pointing the stone joints using lime mortar 1:1.5 (1 Part of Lime: 1.5 Part of Dry River Sand) with erection & dismantling of scaffolding including cost of all labour, material and other scaffolding charges. | 843 | SQM | 680 ₹5,73,240 | 580 ₹4,88,940 | 500 ₹4,21,500 Lowest |
| 2.01 | Provision for repairs to the Abhishega drain by removing the existing stone flooring, removal of silt /earth deposit, grouting the rat hole, dadoing the sides with new granite stone to avoid stagnation of water and prevent rat hole, plastering the sides with lime mortar 1:1.5, resetting the stone flooring with 10% new stone slabs and disposal the debris to far-off place etc., including cost of all materials, labours and other charges etc | 21 | SQM | 8,250 ₹1,73,250 | 7,300 ₹1,53,300 | 5,000 ₹1,05,000 Lowest |
| 3.01 | Carefully dismantling the balibeedam after proper documentation and resetting the with necessary consolidation of the base including cost of all materials and labour charges | 5.68 | CUM | 23,550 ₹1,33,764 | 23,000 ₹1,30,640 | 15,000 ₹85,200 Lowest |
| 4.01 | Dismantling and resetting the stone flooring at sub shrines (bairavarar shrine) of the temple including cost of all materials, labours and other charges | 18 | SQM | 2,630 ₹47,340 | 2,400 ₹43,200 Lowest | 6,000 ₹1,08,000 |
| 5.01 | Making, supplying and fabrication of steps with MS 'L' angle and MS Flat including cost of all materials, labours and other charges(As per attached drawings) | 3.5 | SQM | 11,600 ₹40,600 | 11,000 ₹38,500 Lowest | 30,000 ₹1,05,000 |
| 6.01 | Making, Supplying and fabrication of Ramp using MS L angle and MS Flat with chequered sheet with proper gradient to easy access for old aged devotees and PWD persons for circulation of monument premises including cost of all materials, labours and other charges etc (As per attached drawings) | 5.7 | SQM | 17,000 ₹96,900 | 15,000 ₹85,500 Lowest | 25,000 ₹1,42,500 |
Tender Value
₹9.7 L
EMD Value
₹25,000
Closing Date
26 Aug 2026, 3:00 pmClosed
SA,ASI, Trichy circle, Trichy
O/o SA,ASI, Trichy circle, Trichy-620002
FIRST RECALL TENDER FOR EXECUTION OF WORK OF MC and EW(CAM) TO MAINTENANCE OF RAJENDRACHOLISWARAM TEMPLE AT PONNAMARAVATHI FOR THE YEAR 2026-27
2026_ASI_921905_1
T-15/107/2026-TRICHY CIRCLE
Limited
Civil Works - Buildings
Works
Rajendracholiswaram Temple at Ponnamaravathi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
Yes
11 Sept 2026
12 Aug 2026
27 Aug 2026
12 Aug 2026
26 Aug 2026
12 Aug 2026
12 Aug 2026 - 25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Racking out the stone joints properly and re-pointing the stone joints using lime mortar 1:1.5 (1 Part of Lime: 1.5 Part of Dry River Sand) with erection & dismantling of scaffolding including cost of all labour, material and other scaffolding charges. | 843 | SQM | 602.43 | ₹5,07,848.49 |
| 2.01 | Provision for repairs to the Abhishega drain by removing the existing stone flooring, removal of silt /earth deposit, grouting the rat hole, dadoing the sides with new granite stone to avoid stagnation of water and prevent rat hole, plastering the sides with lime mortar 1:1.5, resetting the stone flooring with 10% new stone slabs and disposal the debris to far-off place etc., including cost of all materials, labours and other charges etc | 21 | SQM | 7,492.42 | ₹1,57,340.82 |
| 3.01 | Carefully dismantling the balibeedam after proper documentation and resetting the with necessary consolidation of the base including cost of all materials and labour charges | 5.68 | CUM | 23,255.51 | ₹1,32,091.3 |
| 4.01 | Dismantling and resetting the stone flooring at sub shrines (bairavarar shrine) of the temple including cost of all materials, labours and other charges | 18 | SQM | 2,283.81 | ₹41,108.58 |
| 5.01 | Making, supplying and fabrication of steps with MS 'L' angle and MS Flat including cost of all materials, labours and other charges(As per attached drawings) | 3.5 | SQM | 10,880 | ₹38,080 |
| 6.01 | Making, Supplying and fabrication of Ramp using MS L angle and MS Flat with chequered sheet with proper gradient to easy access for old aged devotees and PWD persons for circulation of monument premises including cost of all materials, labours and other charges etc (As per attached drawings) | 5.7 | SQM | 16,200 | ₹92,340 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
RFP.pdf
Tender Documents • 17.25 MB
BOQ_968788.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .