Loading…
Loading…
Tender Value
₹8.0 L
EMD Value
₹39,900
Closing Date
7 Sept 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
CO road including laying of spun pipes and one culvert starting from main road near Panchayat Ghat Yarikhah towards Mir Mohalla Gogaldara Phase 1st Budgam
2026_RDPR_323063_7
NIT_62_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
KHANSAHIB
Please refer Tender documents.
3 documents required · 3 mandatory
₹300
Executive Engineer REW Budgam
₹39,900
1 Sept 2026
1 Sept 2026
7 Sept 2026
1 Sept 2026
7 Sept 2026
1 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply/Stacking,Laying Spreading and compacting at Site GSB/RBM, rolling with 3 wheeled road / vibratory roller 8-10 Tonne capacity in stages to proper grade and camber including watering and compacting to the required density. Incl carriages. | - | cum | - | - |
| 2 | Supply/Stacking,Laying Spreading and compacting at Site WBM-II Graded Crushed Stone Aggregate of size 63mm to 45 mm in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 Tonne capacity in stages to proper grade and camber including stone screening, watering and compacting to the required density. | 120.95 | cum | 3,100 | ₹3,74,945 |
| 3 | Providing and laying of dry stone soling duly hand packed including carriages by all means | - | cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm N. size). 20% plum.including carriage of materials. | - | cum | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of formwork for: Return Walls, R walls etc. | 46.14 | Sqm | 628 | ₹28,975.92 |
| 6 | 6 mm Cement plaster of mix: 1 : 3 ( 1 cement : 3 fine sand) | 23.07 | Sqm | 241.25 | ₹5,565.64 |
| 7 | Providing and laying on RCC spun pipes in proper gradient including cutting of roads, providing requisite cushion including proper jointing and carriage complete job. (36 inch dia) | 6 | No. | 15,200 | ₹91,200 |
| 8 | Carriage of stone aggregate avg lead 25 Km. | 11.38 | cum | 465.14 | ₹5,293.29 |
| 9 | Carriage of sand avg lead 30 Km. | 5.94 | cum | 520.34 | ₹3,090.82 |
| 10 | Add Provision for CIB<Photographs and painting for design of SBM Logo as directed by Engineer incharge. | - | No. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_1086218.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .