Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAdmitted-Finance | ₹8.9 L | L1 | Admitted-Finance |
| 2 | L2₹10.0 L+₹1.1 L (12.1%)Admitted-Finance | ₹10.0 L+₹1.1 L (12.1%) | L2 | Admitted-Finance |
| 3 | L3₹10.1 L+₹1.2 L (13.2%)Admitted-Finance | ₹10.1 L+₹1.2 L (13.2%) | L3 | Admitted-Finance |
| 4 | L4₹10.3 L+₹1.4 L (15.9%)Admitted-Finance | ₹10.3 L+₹1.4 L (15.9%) | L4 | Admitted-Finance |
| 5 | L5₹11.5 L+₹2.6 L (29.3%)Admitted-Finance | ₹11.5 L+₹2.6 L (29.3%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Parkash Construction Co. L7 | Hortitech India L8 | M/s Anand Prakash Gupta L8 | R. K Chauhan L1 | RAKESH KUMAR SHARMA L8 | SUNIL KUMAR MITTAL L3 | Mahesh Chand Gupta L5 | VEER CONSTRUCTION COMPANY L10 | Shokeenconstruction L6 | M/s Maha Veer Construction Co. L8 | Vashista and Co L4 | arjun construction company L9 | RAJARAM L8 | RAJ CONSTRUCTION L8 | manish kumar tanwar L8 | R.P.SINGH L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply and stacking of good earth at site including royalty and carriage, loading/unloading wit all lead & lifts complete (Earth measured in stacks will be reduced by 20% for payment). | 816 | Cum | 636 ₹5,18,976 | 800 ₹6,52,800 | 800 ₹6,52,800 | 150 ₹1,22,400 Lowest | 800 ₹6,52,800 | 200 ₹1,63,200 | 200 ₹1,63,200 | 850 ₹6,93,600 | 800 ₹6,52,800 | 790 ₹6,44,640 | 200 ₹1,63,200 | 800 ₹6,52,800 | 800 ₹6,52,800 | 800 ₹6,52,800 | 800 ₹6,52,800 | 251 ₹2,04,816 |
| 2.00 | Supply and stacking of Jamuna Sand at site including royalty and carriage by mechanical transport and loading unloading for all lead and lift. | 158 | Cum | 1,920 ₹3,03,360 | 2,250 ₹3,55,500 | 2,250 ₹3,55,500 | 220 ₹34,760 | 2,250 ₹3,55,500 | 450 ₹71,100 | 300 ₹47,400 | 2,300 ₹3,63,400 | 1,500 ₹2,37,000 | 2,310 ₹3,64,980 | 200 ₹31,600 Lowest | 2,250 ₹3,55,500 | 2,250 ₹3,55,500 | 2,250 ₹3,55,500 | 2,250 ₹3,55,500 | 551 ₹87,058 |
| 3.00 | Hiring of J.C.B/Hydraulic excavator (3-D) with driver, fuel and helper etc. for cleaning of wild growth, removal of building rubbish, debris industrial waste and refuse etc. as per direction of Engineer-in-charge. | 25 | Days | 7,500 ₹1,87,500 | 7,950 ₹1,98,750 | 7,950 ₹1,98,750 | 6,500 ₹1,62,500 | 7,950 ₹1,98,750 | 5,500 ₹1,37,500 | 5,100 ₹1,27,500 | 8,000 ₹2,00,000 | 7,850 ₹1,96,250 | 7,800 ₹1,95,000 | 7,000 ₹1,75,000 | 7,950 ₹1,98,750 | 7,950 ₹1,98,750 | 7,950 ₹1,98,750 | 7,950 ₹1,98,750 | 5,000 ₹1,25,000 Lowest |
| 4.00 | Supply of Chlorpyriphos 20% E.C./Lindane 20% E.C. (Insecticide/pesticide) | 8 | Litre | 165 ₹1,320 | 200 ₹1,600 | 200 ₹1,600 | 120 ₹960 | 200 ₹1,600 | 200 ₹1,600 | 100 ₹800 Lowest | 250 ₹2,000 | 165 ₹1,320 | 200 ₹1,600 | 100 ₹800 Lowest | 200 ₹1,600 | 200 ₹1,600 | 200 ₹1,600 | 200 ₹1,600 | 121 ₹968 |
| 5.00 | Supply of galvanised steel barbed wire. | 8 | Qtl. | 6,000 ₹48,000 | 9,000 ₹72,000 | 9,000 ₹72,000 | 3,500 ₹28,000 | 9,000 ₹72,000 | 5,500 ₹44,000 | 5,000 ₹40,000 | 10,000 ₹80,000 | 8,000 ₹64,000 | 9,500 ₹76,000 | 3,200 ₹25,600 Lowest | 9,000 ₹72,000 | 9,000 ₹72,000 | 9,000 ₹72,000 | 9,000 ₹72,000 | 5,500 ₹44,000 |
| 6.00 | Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludges or manure in the ratio of 8:1( 8 parts of stacked volume of earth after reduction by 20%: one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary , watering and finally fine dressing, levelling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50 m , lift up to 1.5 m complete ( cost of sludge, manure or extra earth to be paid for separately). | 2,500 | Cum | 235 ₹5,87,500 | 295 ₹7,37,500 | 295 ₹7,37,500 | 80 ₹2,00,000 | 295 ₹7,37,500 | 70 ₹1,75,000 | 150 ₹3,75,000 | 300 ₹7,50,000 | 60 ₹1,50,000 | 295 ₹7,37,500 | 100 ₹2,50,000 | 295 ₹7,37,500 | 295 ₹7,37,500 | 295 ₹7,37,500 | 295 ₹7,37,500 | 59 ₹1,47,500 Lowest |
| 7.00 | Providing and fixing of Tuflex Garden fencing Hexagonal net/or equivalent of green colour having contents ( Weight grams/sqm. 510 (+/- 8%)) in width of 60 cm. with bamboo of 90 cm. length. The bamboo should be painted with green colour paint of approved brand and manufacture (two or more coats) and fixed 30 cm. below ground level and 60 cm. above ground level at a distance of 1.50 mtrs. The net and bamboo should be binded with 2 mm. G.I. Wire at three places properly as per direction of Engineer-in-charge. | 1,000 | Per Sqm | 204 ₹2,04,000 | 250 ₹2,50,000 | 250 ₹2,50,000 | 65 ₹65,000 Lowest | 250 ₹2,50,000 | 70 ₹70,000 | 80 ₹80,000 | 300 ₹3,00,000 | 276 ₹2,76,000 | 250 ₹2,50,000 | 127 ₹1,27,000 | 250 ₹2,50,000 | 250 ₹2,50,000 | 250 ₹2,50,000 | 250 ₹2,50,000 | 91 ₹91,000 |
| 8.00 | Supply of best quality Agro shade net green colour (50X3m) 75:25 ratio. | 1,000 | Sqm | 25 ₹25,000 | 26 ₹26,000 | 26 ₹26,000 | 14 ₹14,000 Lowest | 26 ₹26,000 | 15 ₹15,000 | 20 ₹20,000 | 30 ₹30,000 | 30 ₹30,000 | 26 ₹26,000 | 18 ₹18,000 | 26 ₹26,000 | 26 ₹26,000 | 26 ₹26,000 | 26 ₹26,000 | 15 ₹15,000 |
| 9.00 | Provision of cocopit | 50 | Bricks | 165 ₹8,250 | 200 ₹10,000 | 200 ₹10,000 | 60 ₹3,000 Lowest | 200 ₹10,000 | 150 ₹7,500 | 100 ₹5,000 | 300 ₹15,000 | 350 ₹17,500 | 200 ₹10,000 | 80 ₹4,000 | 200 ₹10,000 | 200 ₹10,000 | 200 ₹10,000 | 200 ₹10,000 | 120 ₹6,000 |
| 10.00 | Supply of Moss Grass at site. | 100 | Per Kg | 100 ₹10,000 | 90 ₹9,000 | 90 ₹9,000 | 50 ₹5,000 | 90 ₹9,000 | 90 ₹9,000 | 50 ₹5,000 | 100 ₹10,000 | 200 ₹20,000 | 90 ₹9,000 | 10 ₹1,000 Lowest | 90 ₹9,000 | 90 ₹9,000 | 90 ₹9,000 | 90 ₹9,000 | 55 ₹5,500 |
Tender Value
₹21.9 L
EMD Value
₹43,857
Closing Date
17 Nov 2025, 3:00 pmClosed
sh. RAJENDRA PRASAD MEENA
OFFICE OF THE DY. DIRECTOR (HORT.DIVISION)-III,. DDA., JANAKPURI, NEW DELHI
Supply and stacking of various horticulture items like good earth, jamuna sand,shrubbery beds, earthen pots, polythene bag, tuflex etc. at site.
2025_DDA_884635_1
11/Dy. Director/Hort.-III/DDA/2025-26
Open Tender
Civil Works
Works
90 days
Horticulture Zone (SWZ)
Please refer Tender documents.
10 documents required · 10 mandatory
₹0
₹43,857
29 Nov 2025
7 Nov 2025
18 Nov 2025
7 Nov 2025
17 Nov 2025
7 Nov 2025
Amount
Supply and stacking of good earth at site including royalty and carriage, loading/unloading wit all lead & lifts complete (Earth measured in stacks will be reduced by 20% for payment).
Supply and stacking of Jamuna Sand at site including royalty and carriage by mechanical transport and loading unloading for all lead and lift.
Hiring of J.C.B/Hydraulic excavator (3-D) with driver, fuel and helper etc. for cleaning of wild growth, removal of building rubbish, debris industrial waste and refuse etc. as per direction of Engineer-in-charge.
Supply of Chlorpyriphos 20% E.C./Lindane 20% E.C. (Insecticide/pesticide)
Supply of galvanised steel barbed wire.
Preparation of beds for hedging and shrubbery by excavating 60 cm deep and trenching the excavated base to a further depth of 30 cm, refilling the excavated earth after breaking clods and mixing with sludges or manure in the ratio of 8:1( 8 parts of stacked volume of earth after reduction by 20%: one part of stacked volume of sludge or manure after reduction by 8%), flooding with water, filling with earth if necessary , watering and finally fine dressing, levelling etc. including stacking and disposal of materials declared unserviceable and surplus earth by spreading and levelling as directed, within a lead of 50 m , lift up to 1.5 m complete ( cost of sludge, manure or extra earth to be paid for separately).
Providing and fixing of Tuflex Garden fencing Hexagonal net/or equivalent of green colour having contents ( Weight grams/sqm. 510 (+/- 8%)) in width of 60 cm. with bamboo of 90 cm. length. The bamboo should be painted with green colour paint of approved brand and manufacture (two or more coats) and fixed 30 cm. below ground level and 60 cm. above ground level at a distance of 1.50 mtrs. The net and bamboo should be binded with 2 mm. G.I. Wire at three places properly as per direction of Engineer-in-charge.
Supply of best quality Agro shade net green colour (50X3m) 75:25 ratio.
Provision of cocopit
Supply of Moss Grass at site.
Supply of polythene bags size 5"x7"(gauge 220) both layer at site
Supply of polythene bags size 6"x8"(gauge 175) both layer at site
Provision of earthen pots (empty) only for seed bed/nursery: Supply of empty earthen pots at site. Top inside dia 30 cm, outer bottom dia 20 cm, 30 cm perpendicular height size 12”(S.P) at site.
Supply of empty earthen pots at site. Top inside dia 25 cm. outer bottom dia 15 cm. 25 cm perpendicular height size 10" (S.P) at site.
Supply of empty earthen pots at site. Top inside dia 20 cm. outer bottom dia 10 cm. 20 cm perpendicular height size 8" (S.P) at site.
Provision of supply of Bonsai Tray at site size 08'' empty Tray
size 10'' empty Tray
size 12'' empty Tray
R.P.SINGH (BID ID -3317640)
SUNIL KUMAR MITTAL (BID ID -3318126)
Vashista and Co (BID ID -3318364)
Mahesh Chand Gupta (BID ID -3318179)
Shokeenconstruction (BID ID -3318306)
Parkash Construction Co. (BID ID -3317727)
RAKESH KUMAR SHARMA (BID ID -3318106)
M/s Anand Prakash Gupta (BID ID -3317947)
RAJ CONSTRUCTION (BID ID -3317903)
M/s Maha Veer Construction Co. (BID ID -3318311)
Hortitech India (BID ID -3317934)
manish kumar tanwar (BID ID -3318204)
RAJARAM (BID ID -3318286)
arjun construction company (BID ID -3317914)
VEER CONSTRUCTION COMPANY (BID ID -3318201)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
1.57 MB
Additional Documents
Additional Documents • 1.89 MB
BOQ
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .