Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-Finance 0 LONPO PA CHUCHOT YOKMA KUZAY LEH LADAKH LEH LADAKH UT 194101 | LEH LADAKH | LADAKH | 194101 | ₹8.9 L | L1 | Accepted-Finance Admitted |
| 2 | L2₹9.7 L+₹72,876.20 (8.15%)Accepted-Finance DOMKHAR | ₹9.7 L+₹72,876.20 (8.15%) | L2 | Accepted-Finance Admitted |
| 3 | L3₹10.8 L+₹1.8 L (20.4%)Accepted-Finance R O BOGDANG | ₹10.8 L+₹1.8 L (20.4%) | L3 | Accepted-Finance Admitted |
| 4 | L4₹10.9 L+₹2.0 L (21.9%)Accepted-Finance | ₹10.9 L+₹2.0 L (21.9%) | L4 | Accepted-Finance Admitted |
| 5 | L5₹11.7 L+₹2.8 L (31.3%)Accepted-Finance | ₹11.7 L+₹2.8 L (31.3%) | L5 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | M/S LOBZANG STANBA L2 | M/S TASHI WANGAIL L5 | GHULAM ALI L1 | M/S MOHD ALI L3 | M/S LOBAZANG STANZIN L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Construction of 20 nos of crate bunds at Lakjung Bagh of Nubra Forest Range | ||||||||
| 1.01 | a)Cost of readymade crate mesh made from 2.5mm, point wire as per IS280 machine woven, both ends bent. b) Cost of crate binding wire. | 900 | kgs | 110 ₹99,000 Lowest | 180 ₹1,62,000 | 120 ₹1,08,000 | 125 ₹1,12,500 | 200 ₹1,80,000 |
| 1.02 | Earth work in excavation over area exceeding 30cm in depth as well as 10sqm on plane including disposal of excavated earth and lift up to 1.5 m disposal of earth to be leveled and neatly dressed | 17.53 | cum | 200 ₹3,506 | 350 ₹6,135.5 | 200 ₹3,506 | 100 ₹1,753 Lowest | 620 ₹10,868.6 |
| 1.03 | Constructing vertical bund of sloping faces by boulder filling /dry hand packed tightly including the cost but excluding cost of crate bund. | 140.25 | cum | 1,350 ₹1,89,337.5 | 400 ₹56,100 Lowest | 400 ₹56,100 Lowest | 1,200 ₹1,68,300 | 580 ₹81,345 |
| 1.04 | Making knitted crate of approved mesh size includes weaving, binding sides and binding top after filling, excluding cost of filling stone and binding material. | 43.62 | sqm | 50 ₹2,181 Lowest | 400 ₹17,448 | 450 ₹19,629 | 110 ₹4,798.2 | 1,500 ₹65,430 |
| 1.05 | Carriage of crate material by M.T as under:-
Carriage of 20 crate mesh from sources to site on average distance 150 km including loading and unloading etc. | 0.9 | MT | 500 ₹450 Lowest | 15,000 ₹13,500 | 5,000 ₹4,500 | 1,200 ₹1,080 | 5,000 ₹4,500 |
| 1.06 | Carriage charges by Mechanical transport of 140.25 cum stone from a distance of 10 kms including loading and unloading etc. | 140.25 | cum | 200 ₹28,050 Lowest | 700 ₹98,175 | 600 ₹84,150 | 500 ₹70,125 | 650 ₹91,162.5 |
| 2.00Construction of 40 nos of crate bunds at Diskit Tsogstot of Nubra Forest Range | ||||||||
| 2.01 | a)Cost of readymade crate mesh made from 2.5mm, point wire as per IS280 machine woven, both ends bent. b) Cost of crate binding wire. | 1,800 | kgs | 110 ₹1,98,000 Lowest | 200 ₹3,60,000 | 119.41 ₹2,14,938 | 126 ₹2,26,800 | 150 ₹2,70,000 |
| 2.02 | Earth work in excavation over area exceeding 30cm in depth as well as 10sqm on plane including disposal of excavated earth and lift up to 1.5 m disposal of earth to be leveled and neatly dressed | 35.06 | cum | 200 ₹7,012 | 500 ₹17,530 | 250 ₹8,765 | 100 ₹3,506 Lowest | 558.87 ₹19,593.98 |
Tender Value
₹14.0 L
EMD Value
₹27,960
Closing Date
17 Oct 2025, 10:00 amClosed
Divisional Forest Officer, Leh
Divisional Forest Office Fort Road Leh
Construction of crate bunds at Lakjung Bagh and Diskit Tsogstod Nubra Forest Range for the year 2025-26 under the scheme CAMPA 5(2)(g).
2025_FEE_17566_11
e-Tender No 20 of FDL 2025-26
Open Tender
Civil Works - Others
Item Rate
30 days
Nubra
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Yes
Divisional Forest Officer, Leh
₹27,960
Yes
Divisional Forest Office Fort Road Leh
29 Oct 2025
9 Oct 2025
17 Oct 2025
9 Oct 2025
17 Oct 2025
9 Oct 2025
9 Oct 2025 - 17 Oct 2025
16 Oct 2025
Amount
Construction of 20 nos of crate bunds at Lakjung Bagh of Nubra Forest Range
a)Cost of readymade crate mesh made from 2.5mm, point wire as per IS280 machine woven, both ends bent. b) Cost of crate binding wire.
Earth work in excavation over area exceeding 30cm in depth as well as 10sqm on plane including disposal of excavated earth and lift up to 1.5 m disposal of earth to be leveled and neatly dressed
Constructing vertical bund of sloping faces by boulder filling /dry hand packed tightly including the cost but excluding cost of crate bund.
Making knitted crate of approved mesh size includes weaving, binding sides and binding top after filling, excluding cost of filling stone and binding material.
Carriage of crate material by M.T as under:- Carriage of 20 crate mesh from sources to site on average distance 150 km including loading and unloading etc.
Carriage charges by Mechanical transport of 140.25 cum stone from a distance of 10 kms including loading and unloading etc.
Construction of 40 nos of crate bunds at Diskit Tsogstot of Nubra Forest Range
a)Cost of readymade crate mesh made from 2.5mm, point wire as per IS280 machine woven, both ends bent. b) Cost of crate binding wire.
Earth work in excavation over area exceeding 30cm in depth as well as 10sqm on plane including disposal of excavated earth and lift up to 1.5 m disposal of earth to be leveled and neatly dressed
Constructing vertical bund of sloping faces by boulder filling /dry hand packed tightly including the cost but excluding cost of crate bund.
Making knitted crate of approved mesh size includes weaving, binding sides and binding top after filling, excluding cost of filling stone and binding material.
Carriage of crate material by M.T as under:- Carriage of 40 crate mesh from sources to site on average distance 125 km including loading and unloading etc.
Carriage charges by Mechanical transport of 280.51cum stone from a distance of 20 kms including loading and unloading etc.
M/S LOBZANG STANBA (BID ID -172443)
M/S MOHD ALI (BID ID -172439)
M/S LOBAZANG STANZIN (BID ID -172302)
M/S TASHI WANGAIL (BID ID -172432)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .