| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance MADURAI MADURAI TAMIL NADU | MADURAI | TAMIL NADU | 625001 | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.0 Cr+₹7,709.13 (0.08%)Admitted-Finance | ₹1.0 Cr+₹7,709.13 (0.08%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K SUGAN CONTRACTOR L2 | SRI KUMARAN CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Part 1 : Providing CC Pavement at Sevaikaranpatty Eswari house to Muthuvel house H/O Velvarkottai Rs.2.81 lakhs | |||||
| 2.00 | Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B | 10.85 | cum | 100 ₹1,085 | 83 ₹900.55 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete. | 22.7 | cum | 3,918.17 ₹88,942.46 Lowest | 3,918.17 ₹88,942.46 Lowest |
| 4.00 | Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete. | 83.15 | Sqm | 380 ₹31,597 Lowest | 380 ₹31,597 Lowest |
| 5.00 | CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. | 8.31 | cum | 4,588.43 ₹38,129.85 Lowest | 4,588.43 ₹38,129.85 Lowest |
| 6.00 | CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete. | 16.27 | cum | 5,219.75 ₹84,925.33 Lowest | 5,219.75 ₹84,925.33 Lowest |
| 7.00 | Provision for Bitumen pad | 1 | No | 2,500 ₹2,500 Lowest | 2,500 ₹2,500 Lowest |
| 8.00 | Provision for Name Board | 1 | No | 1,000 ₹1,000 Lowest | 1,000 ₹1,000 Lowest |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 29,782 ₹29,782 | 29,759 ₹29,759 Lowest |
| 10.00Part 2 : Providing Paver block pavement at Pudukalarampatty Near Mariyamman kovil Street H/O Velvarkottai Rs.1.92 lakhs | |||||
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
9 Feb 2021, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA, DINDIGUL
THE PROJECT DIRECTOR DRDA, DINDIGUL
Dindigul Dist - SCPAR 2020-2021 - Vadamadurai block CC pavement and Paver block works TN-05-03
2021_RDTN_192128_1
DIPR/333/Tender/2021 TN-05-03 Vadamadurai
Open Tender
Civil Works
Item Rate
180 days
DINDIGUL
Dindigul Dist - SCPAR 2020-2021 - Vadamadurai block CC pavement and Paver block works TN-05-03
5 documents required · 5 mandatory
₹0
₹1.0 L
THE PROJECT DIRECTOR DRDA, DINDIGUL
17 Feb 2021
22 Jan 2021
9 Feb 2021
22 Jan 2021
9 Feb 2021
29 Jan 2021
29 Jan 2021
Amount
Part 1 : Providing CC Pavement at Sevaikaranpatty Eswari house to Muthuvel house H/O Velvarkottai Rs.2.81 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 2 : Providing Paver block pavement at Pudukalarampatty Near Mariyamman kovil Street H/O Velvarkottai Rs.1.92 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Construction of Granular Sub base by providing with graded materials of size 9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including spreading in uniform layers with motor grader on propared surface, mixing by mix in place method with rotavator at OMC and compacting with three wheeler 80 - 100 KN static roller coa pcity to acheive the desired dinsity etc., complete as Technical specification clause 402 Grading C.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
Supplying & Laying interlocking Paver Blocks of 60cm thick of require shaoe in CC 1:1:2 using 10 - 12 mm HBG Metal including cost of shuttering laying vibrating (with mechanical Vibrating) finishing curing and cost includers for hydraulic pressed machine and the cost including transporting charges etc., complete complying standard specification
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 3 :Providing Paver block pavement at Servaikaranpatty Kalidass house to Naicker kovil H/O Velvarkottai Rs.4.90 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Construction of Granular Sub base by providing with graded materials of size 9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including spreading in uniform layers with motor grader on propared surface, mixing by mix in place method with rotavator at OMC and compacting with three wheeler 80 - 100 KN static roller coa pcity to acheive the desired dinsity etc., complete as Technical specification clause 402 Grading C.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
Supplying & Laying interlocking Paver Blocks of 60cm thick of require shaoe in CC 1:1:2 using 10 - 12 mm HBG Metal including cost of shuttering laying vibrating (with mechanical Vibrating) finishing curing and cost includers for hydraulic pressed machine and the cost including transporting charges etc., complete complying standard specification
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 4 :Providing CC Pavement at Kurunthampatty Bus stop to Vinayagar kovil H/O Puthur Rs.11.92 laks
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 5 : Providing CC Pavement at Pitchampatty H/O Puthur Rs.3.08 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 6 :Providing CC Pavement at Puthur Raju house to Sadaiyappan house H/O Puthur Rs.3.29 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 7 :Providing Paver block pavement at Poosaripatty Thiruman house to Elavarasi house H/O Puthur Rs.3.09 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Construction of Granular Sub base by providing with graded materials of size 9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including spreading in uniform layers with motor grader on propared surface, mixing by mix in place method with rotavator at OMC and compacting with three wheeler 80 - 100 KN static roller coa pcity to acheive the desired dinsity etc., complete as Technical specification clause 402 Grading C.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
Supplying & Laying interlocking Paver Blocks of 60cm thick of require shaoe in CC 1:1:2 using 10 - 12 mm HBG Metal including cost of shuttering laying vibrating (with mechanical Vibrating) finishing curing and cost includers for hydraulic pressed machine and the cost including transporting charges etc., complete complying standard specification
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 8 :Providing Paver block pavement at Aranmanaipatty Murugeshwari house to Vinayagar kovil H/O Puthur Rs.3.03 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Construction of Granular Sub base by providing with graded materials of size 9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including spreading in uniform layers with motor grader on propared surface, mixing by mix in place method with rotavator at OMC and compacting with three wheeler 80 - 100 KN static roller coa pcity to acheive the desired dinsity etc., complete as Technical specification clause 402 Grading C.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
Supplying & Laying interlocking Paver Blocks of 60cm thick of require shaoe in CC 1:1:2 using 10 - 12 mm HBG Metal including cost of shuttering laying vibrating (with mechanical Vibrating) finishing curing and cost includers for hydraulic pressed machine and the cost including transporting charges etc., complete complying standard specification
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 9 :Providing CC Pavement at Kunjagoundanur Balan house to Palanisamy house kovil H/O Velayuthampalayam Rs.4.29 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 10 : Providing CC Pavement at T.Pudur Mariyappan house to Vellaisamy house H/O Velayuthampalayam Rs.2.06 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 11 :Providing CC Pavement at Pudupatty-Padiyur road to Ponraj house H/O Padiyur Rs.2.79 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 12 :Providing CC Pavement at Padiyur Pattalamman kovil to Ponni house H/O Padiyur Rs.2.00 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 13 :Providing CC Pavement at E.Pudur Periyakkal house to Velusamy house H/O Padiyur Rs.3.87 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 14 :Providing CC Pavement at Molapadiyur AD Colony Santhanam house to Vadamadurai BT road H/O Padiyur Rs.2.80 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 15 :Providing CC Pavement at Molapadiyur Mandai to Palanisamy house H/O Padiyur Rs.2.00 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 16 :Providing CC Pavement at Pudupatty Ponnan house to Manikandan house H/O Padiyur Rs.5.18 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 17 :Providing CC Pavement at Koottathupatty Anganwadi to Burial ground H/O Padiyur Rs.4.78 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 18 : Providing CC Pavement at Nadupatty BT road to Alagumalai house H/O Padiyur Rs.3.43 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 19 :Providing CC Pavement at Pudupatty Alagumalai house to Vijayakumar H/O Padiyur Rs.3.12 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 20 : Providing Paver block pavement at E.Pudur Near Kovil street H/O Padiyur Rs.4.95 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Construction of Granular Sub base by providing with graded materials of size 9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including spreading in uniform layers with motor grader on propared surface, mixing by mix in place method with rotavator at OMC and compacting with three wheeler 80 - 100 KN static roller coa pcity to acheive the desired dinsity etc., complete as Technical specification clause 402 Grading C.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
Supplying & Laying interlocking Paver Blocks of 60cm thick of require shaoe in CC 1:1:2 using 10 - 12 mm HBG Metal including cost of shuttering laying vibrating (with mechanical Vibrating) finishing curing and cost includers for hydraulic pressed machine and the cost including transporting charges etc., complete complying standard specification
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 21 : Providing Paver block pavement at Pudukalarampatty Vellaiyammal house to Sivalingam house H/O Velvarkottai Rs3.09 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Construction of Granular Sub base by providing with graded materials of size 9.5mm to 4.75mm metal in 66% & 2.36mm in 34% including spreading in uniform layers with motor grader on propared surface, mixing by mix in place method with rotavator at OMC and compacting with three wheeler 80 - 100 KN static roller coa pcity to acheive the desired dinsity etc., complete as Technical specification clause 402 Grading C.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
Supplying & Laying interlocking Paver Blocks of 60cm thick of require shaoe in CC 1:1:2 using 10 - 12 mm HBG Metal including cost of shuttering laying vibrating (with mechanical Vibrating) finishing curing and cost includers for hydraulic pressed machine and the cost including transporting charges etc., complete complying standard specification
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 22 :Providing CC Pavement at Pudukalarampatty Kirshnan house to Muniyappan kovil H/O Velvarkottai Rs.16.04 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part - 23 : Providing CC Pavement at Puthur BT road to Puthur AD Colony H/O Puthur Rs.8.18 lakhs
Earthwork excavation in all clauses of soils and depositing on bank with initial lead and lift for foundation as per ss20B
Cement concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of all matials to site and all labour charges etc., complete.
Supply and errection of steel centering for sides and soffits of cc works including cost and conveyance of all matials to site and all labour charges etc., complete.
CC 1:3:6 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
CC 1:2:4 mix using 20 mm ISS HBG metal including cost & conveyance of all materials to site and all labour charges etc., complete.
Provision for Bitumen pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K SUGAN CONTRACTOR
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .