Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 CrAdmitted-Finance 7 145 MALLIKUNDAM PO MECHARI VIA MALLIKUNDAM VIA METTUR TK SALEM DT | ₹2.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.5 Cr+₹68.0 L (23.8%)Admitted-Finance | ₹3.5 Cr+₹68.0 L (23.8%) | L2 | Admitted-Finance |
| 3 | L3₹3.9 Cr+₹1.0 Cr (35.8%)Admitted-Finance 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | ₹3.9 Cr+₹1.0 Cr (35.8%) | L3 | Admitted-Finance |
| 4 | L4₹4.0 Cr+₹1.1 Cr (38.2%)Admitted-Finance | ₹4.0 Cr+₹1.1 Cr (38.2%) | L4 | Admitted-Finance |
| 5 | L5₹4.0 Cr+₹1.1 Cr (40.1%)Admitted-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | ₹4.0 Cr+₹1.1 Cr (40.1%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S S AND CO L3 | M s Kumaresan and co L1 | JD ENTERPRISES L6 | MSS CONTRACTORS L2 | GUHANSANJEEVI ENTERPRISES L4 | MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED L5 | H.Venkateswaran L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Check surveying and pit marking of tower locations with accuracy including hire charges for T & P charges, labour etc., complete. as directed by the engineer incharge at site | 10 | Loc. | 2,000 ₹20,000 | 2,000 ₹20,000 | 2,000 ₹20,000 | 1,800 ₹18,000 Lowest | 2,500 ₹25,000 | 2,000 ₹20,000 | 4,000 ₹40,000 |
| 2.00 | Earthwork excavation for depositing on bank for tower foundation with initial lead, in all classes of soil etc., complete. For hard gravelly soil | 1,505 | m3 | 100 ₹1,50,500 Lowest | 150 ₹2,25,750 | 150 ₹2,25,750 | 120 ₹1,80,600 | 110 ₹1,65,550 | 300 ₹4,51,500 | 200 ₹3,01,000 |
| 3.00 | Earthwork excavation for depositing on bank for tower foundation with initial lead, in all classes of soil etc., complete. For soft disintegrated rock or kankar not requiring blasting. | 94 | m3 | 150 ₹14,100 Lowest | 200 ₹18,800 | 150 ₹14,100 Lowest | 150 ₹14,100 Lowest | 170 ₹15,980 | 300 ₹28,200 | 200 ₹18,800 |
| 4.00 | Earthwork excavation for depositing on bank for tower foundation with initial lead, in all classes of soil etc., complete. For MR and DMR Not requiring blasting. | 94 | m3 | 200 ₹18,800 | 200 ₹18,800 | 150 ₹14,100 Lowest | 150 ₹14,100 Lowest | 290 ₹27,260 | 300 ₹28,200 | 200 ₹18,800 |
| 5.00 | Earthwork excavation for depositing on bank for tower foundation with initial lead, in all classes of soil etc., complete. For hard rock measured in solid including blasting | 94 | m3 | 500 ₹47,000 | 200 ₹18,800 | 150 ₹14,100 Lowest | 200 ₹18,800 | 800 ₹75,200 | 300 ₹28,200 | 1,000 ₹94,000 |
| 6.00 | Earthwork excavation for depositing on bank for tower foundation with initial lead, in all classes of soil etc., complete. For Hard rock wedging and chiselling | 94 | m3 | 1,000 ₹94,000 | 200 ₹18,800 Lowest | 1,500 ₹1,41,000 | 300 ₹28,200 | 1,300 ₹1,22,200 | 300 ₹28,200 | 200 ₹18,800 Lowest |
| 7.00 | Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour, fuel, oil, transport and operator charges etc complete as directed by the engineer incharge at site. | 183 | Hrs | 100 ₹18,300 | 5 ₹915 | 1 ₹183 Lowest | 150 ₹27,450 | 100 ₹18,300 | 10 ₹1,830 | 300 ₹54,900 |
| 8.00 | Supply and gravel filling with proper consoildation for filling works for formation of temporary road and bund formation around tower locations as per standard specification and dismanting and removal of bund will lake area etc complete as directed by the Engineer at site. | 3,107 | m3 | 450 ₹13,98,150 | 5 ₹15,535 Lowest | 10 ₹31,070 | 100 ₹3,10,700 | 300 ₹9,32,100 | 10 ₹31,070 | 200 ₹6,21,400 |
| 9.00 | Filling with uniformly graded filling sand to the satisfaction of TANTRANSCO Officials. In layers well consolidated as per standard specification including cost of filling lead, lift, labour for filling, well ramming consolidation etc., complete.as directed by TANTRANSCO engineer at site | 3.8 | m3 | 2,000 ₹7,600 | 5 ₹19 Lowest | 2,000 ₹7,600 | 1,500 ₹5,700 | 1,300 ₹4,940 | 1,800 ₹6,840 | 600 ₹2,280 |
| 10.00 | Providing Shoring and Shuttering using necessary Country Wooden Planks 40mm thick and 8cm to 10cm dia. Casurina,vertical posts at every 300mm C/C of 1.80m height duly anchored 300mm into the ground for firm support including placing and making the two rows of planks of top and bottom and one middle row of casurina with strutt arrangements at top so as to afford easy laying as cables. The rate shall also include necessary storage charges for the casurina and Country Wooden Planks at suitable place so as not to affect the traffic and movement of public transporting them to work spot lead lift besides the cost of materials etc., complete. ( Any other improved method of shoring and strutting is also accelptable to TANTRANSCO. But at no extra cost to TANTRANSCO ) as directed by TANTRANSCO engineer at site | 336 | Sqm. | 200 ₹67,200 | 10 ₹3,360 | 1 ₹336 Lowest | 200 ₹67,200 | 50 ₹16,800 | 10 ₹3,360 | 100 ₹33,600 |
Tender Value
Refer Docs
EMD Value
₹3.6 L
Closing Date
24 Jul 2024, 2:30 pmClosed
CE/TP-I/CNI
O/o the Chief Engineer/Transmission Projects -I / Chennai, 3rd Floor , 230 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32
Earth work Excavation, stub setting, concreting, Supply, Transporting and Erection of DC towers with stringing of 6 Nos. of Zebra conductor and 1 No. OPGW cable by making LILO of the existing 230 kV Thiruvalam 400/230 kV SS - Singarapet 230/110 kV SC
2024_EB_461952_1
TP1-13/2024-25 OF CE/TP-I/CNI
Open Tender
Civil Works
Works
180 days
SATHUMADURAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3.6 L
Yes
22 Aug 2024
10 Jul 2024
25 Jul 2024
10 Jul 2024
24 Jul 2024
10 Jul 2024
Amount
Check surveying and pit marking of tower locations with accuracy including hire charges for T & P charges, labour etc., complete. as directed by the engineer incharge at site
Earthwork excavation for depositing on bank for tower foundation with initial lead, in all classes of soil etc., complete. For hard gravelly soil
Earthwork excavation for depositing on bank for tower foundation with initial lead, in all classes of soil etc., complete. For soft disintegrated rock or kankar not requiring blasting.
Earthwork excavation for depositing on bank for tower foundation with initial lead, in all classes of soil etc., complete. For MR and DMR Not requiring blasting.
Earthwork excavation for depositing on bank for tower foundation with initial lead, in all classes of soil etc., complete. For hard rock measured in solid including blasting
Earthwork excavation for depositing on bank for tower foundation with initial lead, in all classes of soil etc., complete. For Hard rock wedging and chiselling
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour, fuel, oil, transport and operator charges etc complete as directed by the engineer incharge at site.
Supply and gravel filling with proper consoildation for filling works for formation of temporary road and bund formation around tower locations as per standard specification and dismanting and removal of bund will lake area etc complete as directed by the Engineer at site.
Filling with uniformly graded filling sand to the satisfaction of TANTRANSCO Officials. In layers well consolidated as per standard specification including cost of filling lead, lift, labour for filling, well ramming consolidation etc., complete.as directed by TANTRANSCO engineer at site
Providing Shoring and Shuttering using necessary Country Wooden Planks 40mm thick and 8cm to 10cm dia. Casurina,vertical posts at every 300mm C/C of 1.80m height duly anchored 300mm into the ground for firm support including placing and making the two rows of planks of top and bottom and one middle row of casurina with strutt arrangements at top so as to afford easy laying as cables. The rate shall also include necessary storage charges for the casurina and Country Wooden Planks at suitable place so as not to affect the traffic and movement of public transporting them to work spot lead lift besides the cost of materials etc., complete. ( Any other improved method of shoring and strutting is also accelptable to TANTRANSCO. But at no extra cost to TANTRANSCO ) as directed by TANTRANSCO engineer at site
Assembling of templates and setting of stubs & cleats to required alignment and level as directed by the Engineers incharge at site including cost of all materilas, hire charges for template, labour, lead, lift, hire charges for T&P etc., complete. as directed by TANTRANSCO engineer at site. For KSR tower
Assembling of templates and setting of stubs & cleats to required alignment and level as directed by the Engineers incharge at site including cost of all materilas, hire charges for template, labour, lead, lift, hire charges for T&P etc., complete. as directed by TANTRANSCO engineer at site. For LSR tower
Assembling of templates and setting of stubs & cleats to required alignment and level as directed by the Engineers incharge at site including cost of all materilas, hire charges for template, labour, lead, lift, hire charges for T&P etc., complete. as directed by TANTRANSCO engineer at site. For Cable Termination tower
PCC 1:3:6 using 20 mm metal without form work for tower foundation padding concrete including cost of cement of approved cement and all materials , labour, lead and also below ground level curing , steel formwork charges, consolidation, hire charges for T&P,labour of independent gang to be deployed in propotianate to the progress to be acheived within the specified time frame stipulated by the TANTRANSCO officials, lead lift t&p including cost of all materials, adhering to the BOCW act 1996 and rules 2006 without any compromise etc complete. as directed by TANTRANSCO engineer at site
PCC 1:2:4 using 20 mm HB Stone for foundation with steel form work for frustum shaped foundation including cost of cement of approved brand including all materials labour etc., complete,labour, lead, curing , steel formwork charges, consolidation, hire charges for T&P, labour of independent gang to be deployed in propotianate to the progress to be acheived within the specified time frame stipulated by the TANTRANSCO officials, lead lift t&p including cost of all materials, adhering to the BOCW act 1996 and rules 2006 without any compromise etc complete. as directed by TANTRANSCO engineer at site
RCC 1:1.5:3 using 20 mm metal with steel form work for frustum portion tower foundation concrete including cost of cement of approved brand and all materials , labour, vibrator , lead, consolidation, lift, curing , steel formwork charges, hire charges for T&P etc but excluding the cost of steel reinforcement..adhering to the BOCW act 1996 and rules 2006 without any compromise as directed by TANTRANSCO engineer at site
Back filling of tower pits after laying of stub setting concrete with excavated earth in layers not exceeding 150 mm and compacting to the optimum moisture content to acchieve maximum ddry density including cost of all labour, lead, lift, watering and well consolidation as per specifications,hire charges for T&P etc complete. as directed by TANTRANSCO engineer at site
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift,labour, cost of binding wire, etc., complete.
Removal of excess excavated earth from tower location and depositing away from the site about 5 km lead if land owner objection raised with all lead and lift , all head load etc. complete as directed by Engineer at site.
Providing muffing and coping with PCC 1:2:4 using 20 mm HBG metal with steel form work including cost of all materials , labour lead lift curing etc complete. as directed by TANTRANSCO engineer at site
Providing pipe type earthing of towers using GI pipe including flatening of edges, connection of earth strips , providing alternate holes in the earth pipe in accordance to TANTRANSSCO Drawings including cost of earth pipe, earth strip all materials, labour, lead, lift etc as directed by engineer at site.
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials, labour, lead, lift etc complete as directed by Site incharge.
Transport and erection of towers including sorting out of tower members, tightening punching the bolts and nuts whereever necessary, patch painting, cutting of angles wherever necessary, minor fabrication workss, final checking, cost of T & P, labour of independent gang to be deployed in propotianate to the progress to be acheived within the specified time frame stipulated by the TANTRANSCO officials, lead lift t&p including cost of all materials,adhering to the BOCW act 1996 and rules 2006 without any compromise all leads and lifts etc., complete. as directed by TANTRANSCO engineer at site
Transporting and hoisting of 13 units of 90 KN Disc insulators with single suspension fittings including cost of all labour, lead lilft etc., complete as directed by engineer at site.
Transporting and hoisting of 14 units of 120 KN Disc insulators with single tension fittings including cost of all labour, lead lilft etc., completeas directed by engineer at site.
Providing trusstles for minor road crossing and P&T crossing including all labour lead lift etc complete as directed by TANTRANSCO engineer at site.
Providing independent temporary guys for sets of cross arm of each 3 Nos including digging of trench for a size of 6' x 2' x 6', supplying and placing in the digged pit of RSJ/Concrete Block/Wooden log of 50kgs weight,tying the cross arm with the wooden log/RSJ/Concrete with the help of GI earthwire, distance of 1 1/2 x Height of tower, refilling the trench and relaesing after completion of work etc complete. as directed by TANTRANSCO engineer at site
Labour charges for Stringing of 6 Nos. of Zebra conductor between angle point towers including sorting out of conductor at site, transport charges, labour for paving out using rollers fixed on ground without conductor shall not touch the ground during entire operation, rough sagging and single tensioning , final checking as directed by the Engineers incharge concerned with necessary trusstles etc including cost of all materials, labour lead lift t&p labour of independent gang to be deployed in propotianate to the progress to be acheived within the specified time frame stipulated by the TANTRANSCO officials, lead lift t&p including cost of all materials, clipping providing jumpers, fixing of SB dambers, PA rods arcing horns etc with all labour lead lift etc complete. as directed by TANTRANSCO engineer at site
Labour charges for stringing of OPGW cable with all accessories including paying out, jointing, rough sagging, tensioning, clipping, providing vibration dambers at tension locations including jumber connections, providing trussals at various intervals for avoiding damages of conductor including transport charges, loading, unloading, lead, lift, labour, clipping the cable joints, splicing at required location and cost of T&P etc complete.
Labour charges for clearing light jungle including hire charges for T&P s all labour lead lift etc, complete as directed by Engineer at site
Lowering of LT / HT line before stringing of LT/HT line and restringing the same after completition of EHT line work etc., complete.
Labour charges for Releasing & Re-stringing of 6 Nos of Panther conductor and vibration dambers at tension locations including jumber connections, including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For Spans ( Under LC Condion )
Providing anti corrosive paint to the tower legs above ground level upto a height of 1 m from the GL including cost of Anti corrosive black paint, all albour lead , lift etc complete.
Tack welding of bolts and nuts with three tacks equally spaced in towers using diesel generator sets and applying zinc chromate paint including cost of all materials, lead and hire charges etc., complete.
Labour charges for cutting, uprooting and removing of small trees from the line including the hire charges for T & P etc. complete
Labour charges for cutting, uprooting and removing of large trees from the line including the hire charges for T & P etc. complete
Labour charges for Stringing of 6 Nos Zebra ACSR conductor in between angle point towers in lake portion including sorting out of conductor at site, transport charges, labour for paving out, rough sagging and single tensioning , final checking as directed by the Engineers incharge concerned with necessary trusstles etc including cost of all materials, labour lead lift t&p, deploying boats if necessary etc complete. as directed by TANTRANSCO engineer at site
Labour charges for Releasing & Re-stringing of 3 Nos of Kundha conductor and vibration dambers at tension locations including jumber connections, including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For Spans ( Under LC Condion )
Labour charges for releasing & re-stringing of 1 Nos of GI earthwire including jumber connections, including transport charges, loading, unloading, lead, lift, labour and cost of T&P etc complete. For Spans ( Under LC Condion )
Providing temporary bund / Stacking platform around tower location by supply and filling up the empty polythene bags with sand stitching them conveying the same to site and stacking, laying in position around tower location and disposing off from site after successfull completion of work including polythene bags, jute, thread, and all materials and labour charges for filling sand, alying and filling and bailing out of water etc., complete and as directed by the Engineer at site
Supply, Transport and fixing of Name board of size 750x450mm with 18 guage MS sheet and frame of 25x6mm flat including cost of paiting, labour for lettering as directed by the Engineers incharge at site etc. complete.
Supply, Transport and fixing of Number plate in the tower leg with all lead & lift ,etc., complete
Supply, Transport and fixing of Danger board in the tower leg with all lead & lift ,etc., complete
Supply, Transport and fixing of Phase plate in the tower leg with all lead & lift ,etc., complete
Supply, Transport and fixingof Anti climbing device in road side, railway crossing, lake etc. including cost of labour, lead, all lift , head load, etc complete.
Providing Loop jumpers for Zebra conductor at identified locations in proposed 230 KV line including cost of all materials, labour lead llift T&P etc complete
Supply, transport and fixing of Single Tension fittings for Zebra conductor as per design drawing and specifications.
Supply, transport and fixing of Single suspension fittings for Zebra conductor as per design drawing and specifications.
Supply, transport and fixing of SB damber for Zebra conductor as per design drawing and specifications.
Supply, transport and fixing of Mid span joint for Zebra conductor as per design drawing and specifications
Supply, transport and fixing of Repair sleeve for for Zebra conductoras per design drawing and specifications
Supply, transport and fixing of I- bolt as per design drawing and specifications
Supply, transport and fixing of Single Tension fittings for Kundha conductor as per design drawing and specifications.
Supply, transport and fixing of Single Tension fittings for earthwire as per design drawing and specifications.
Supply, transport and fixing of PG Clamp for Loop Jumpers as per design drawing and specifications.
Providing earth pit of 115 mm dia to a depth of 3.60 m using power rigs or any other method including fixing of 40 mm dia GI pipe in 3m length with alternatie holes in the pipe connectiong to the leg by earth strips and refilling the pit with red soil mixed with bentonite powder and other materials labour lead lift etc complete. as directed by TANTRANSCO engineer at site
Supplying, Transportation, fabrication, galvanising of standard towers, stub cleat & extension tower parts as per department approved drawing including of tower parts to site, all taxes and duties, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer. MS Tower parts
Supplying, Transportation, fabrication, galvanising of standard towers parts as per department approved drawing including of tower parts to site, all taxes and duties, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer. HTS Tower parts
Supplying, Transportation, fabrication, galvanising of standard Bolts and nuts as per department approved drawing including of tower parts to site, all taxes and duties, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
MSS CONTRACTORS (BID ID -1089910)
S S AND CO (BID ID -1080021)
GUHANSANJEEVI ENTERPRISES (BID ID -1090787)
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED (BID ID -1091261)
JD ENTERPRISES (BID ID -1089807)
H.Venkateswaran (BID ID -1091367)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .