| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.1 LAccepted-Finance DEVANE NANDED NANDED | NANDED | MAHARASHTRA | 431601 | ₹39.1 L | L1 | Accepted-Finance Lowest One |
| 2 | L2₹46.7 LRejected-Finance | ₹46.7 L | L2 | Rejected-Finance Not Lowest one |
| 3 | Rejected-Technical A 8 YAHODUTTA SOCIETY KASBA PETH PUNE 411011 | PUNE | PUNE | MAHARASHTRA | 411011 | - | - | Rejected-Technical Technically Disqualified. |
| 4 | Rejected-Technical 1104 QUANTUM TOWER RAM BAUG LANE MALAD WEST MUMBAI MAHARASHTRA 400064 UDYAM MH 18 0008080 | MUMBAI SUBURBAN | MAHARASHTRA | 400064 | - | - | Rejected-Technical Technically Disqualified |
| Sl No | Description | Qty | Unit | PRAVIN CONSTRUCTION L1 | S D BUTALA L2 |
|---|---|---|---|---|---|
| 1.00Description | |||||
| 2.00 | Item no.01 Providing and fixing double
scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per
requirement of site, made with
40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal &vertical tubes joint with cup & locksystem with M.S. Tubes, M.S. tube
challis, M.S. clamps and staircase
system in the scaffolding for working
platform etc. and maintaining it in a
serviceable condition for execution
of work of cleaning and/ or
pointing and/ or applying chemical
and removing it thereafter. The
scaffolding system shall be stiffened
with bracings, runners, connecting
with the building etc, wherever
required, if feasible, for inspection
of work at required locations with
essential safety features for the
workmen etc., complete as per
directions and approval of
Engineer-in-charge. Note:- (1) The
elevational area of the scaffolding
shall be measured for payment
purpose. (2) The payment will be
made once only for e | 180 | Sqm | 290 ₹52,200 | 300 ₹54,000 |
| 3.00 | Item no.02 Chipping of all loose and Spalling of
concrete to bottom of slab, beams etc.(wherever required), cleaning ofreinforcement, carrying out thorough sand blasting, application of
anti-corrosive zinc rich epoxy primer
to exposed reinforcement including
cost of material, labour, equipment,
tools, scaffolding etc. complete. | 180 | Sqm | 510 ₹91,800 | 522 ₹93,960 |
| 4.00 | Item no.03 Providing and applying one pack
bonding coat between concrete members like RCC slabs, columns,beams, chajjas, pardis etc and cement mortar plaster using Hack Aid
Plast of approved make & approved
by Engineer in charge. Clean the
concrete surface thoroughly to
remove dust, dirt, grime,
deshuttering oils and rub down to a
clean surface. Apply Hack Aid Plast
of approved make & approved by
Engineer in charge by spray on the
entire concrete surface. Provide a
lean cement - sand dash coat over
the same. Allow the dash coat to set
for around 24 hours. Further
plastering as per specifications can
continue. | 180 | Sqm | 56.7 ₹10,206 | 59 ₹10,620 |
| 5.00 | Item no.04 Making up lost section of concrete/
mortar with thixotropic repair mortar is one component thixotropic dual shrinkage compensated fibre r/f formulation for structural members build up section by hand packing as
per manufactures specification
applied by mean of hand gloves / by
expert applicator. The rehabilitees
surface should be free from air gaps,
avoids sld be in line with existing
required line. Line with existing
surface includes curing, cleaning
complete area etc complete. Work sld
be carried out with all safety
measures like helmets, safety belts
and adequate labour insurance under
qualified supervisor etc complete.
(Rates excluding GST) (Material
should have CE marking and
declaraton of performance to EN
1504 - 4 - concrete repair product for
structural repair) | 9,450 | Kilogram | 70.49 ₹6.7 L | 135 ₹12.8 L |
| 6.00 | Item no.05 Providing and applying tactile quality
acrylic /synthetic, semi viscous paste/ plaster containing quartz aggregate acrylic polymer mineral specially formulated to withstand varying
climate conditions and provide a long
lasting elegant look to surface having
very high aesthetic as well as
protection value. Highly durable and
maintenance free nontoxic,
non-flammable 2mm thick coating
having pH value 8-9 , specific gravity
1.70 kg/lit | 3,410 | Sqm | 631 ₹21.5 L | 659 ₹22.5 L |
| 7.00 | Item no.06 Providing and applying two coats
of exterior acraylic emulsion paint confirming to corresponding I.S. of approved manufacture and of approved colour to the plastered
surfaces including cleaning ,preparing the plaster
surface, applying primer
coat ,scaffolding if necessary , and
watering the surface for two days etc
complete. | 3,410 | Sqm | 274.05 ₹9.3 L | 291 ₹9.9 L |
Tender Value
₹39.1 L
EMD Value
₹39,100
Closing Date
13 May 2026, 5:00 pmClosed
Superintending Engineer Mumbai
MIDC HQ Andheri-93
MBP...Retro fitting and water proofing of Building No.4 Sector - II MBP with high strength fiber glass repair mortor (Thermoset) with tectile quality acrylic synthetic semiviscous paste
2026_MIDC_1299308_1
MIDC/Mahape/38349/11/2025-26
Open Tender
Civil Works
180 days
MBP TTC Indl Area Mahape
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,030
₹39,100
25 May 2026
30 Apr 2026
15 May 2026
30 Apr 2026
13 May 2026
7 May 2026
30 Apr 2026 - 4 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Description | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 2 | Item no.01 Providing and fixing double
scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per
requirement of site, made with
40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal &vertical tubes joint with cup & locksystem with M.S. Tubes, M.S. tube
challis, M.S. clamps and staircase
system in the scaffolding for working
platform etc. and maintaining it in a
serviceable condition for execution
of work of cleaning and/ or
pointing and/ or applying chemical
and removing it thereafter. The
scaffolding system shall be stiffened
with bracings, runners, connecting
with the building etc, wherever
required, if feasible, for inspection
of work at required locations with
essential safety features for the
workmen etc., complete as per
directions and approval of
Engineer-in-charge. Note:- (1) The
elevational area of the scaffolding
shall be measured for payment
purpose. (2) The payment will be
made once only for e | - | Sqm | - | - | - |
| 3 | Item no.02 Chipping of all loose and Spalling of
concrete to bottom of slab, beams etc.(wherever required), cleaning ofreinforcement, carrying out thorough sand blasting, application of
anti-corrosive zinc rich epoxy primer
to exposed reinforcement including
cost of material, labour, equipment,
tools, scaffolding etc. complete. | - | Sqm | - | - | - |
| 4 | Item no.03 Providing and applying one pack
bonding coat between concrete members like RCC slabs, columns,beams, chajjas, pardis etc and cement mortar plaster using Hack Aid
Plast of approved make & approved
by Engineer in charge. Clean the
concrete surface thoroughly to
remove dust, dirt, grime,
deshuttering oils and rub down to a
clean surface. Apply Hack Aid Plast
of approved make & approved by
Engineer in charge by spray on the
entire concrete surface. Provide a
lean cement - sand dash coat over
the same. Allow the dash coat to set
for around 24 hours. Further
plastering as per specifications can
continue. | - | Sqm | - | - | - |
| 5 | Item no.04 Making up lost section of concrete/
mortar with thixotropic repair mortar is one component thixotropic dual shrinkage compensated fibre r/f formulation for structural members build up section by hand packing as
per manufactures specification
applied by mean of hand gloves / by
expert applicator. The rehabilitees
surface should be free from air gaps,
avoids sld be in line with existing
required line. Line with existing
surface includes curing, cleaning
complete area etc complete. Work sld
be carried out with all safety
measures like helmets, safety belts
and adequate labour insurance under
qualified supervisor etc complete.
(Rates excluding GST) (Material
should have CE marking and
declaraton of performance to EN
1504 - 4 - concrete repair product for
structural repair) | - | Kilogram | - | - | - |
| 6 | Item no.05 Providing and applying tactile quality
acrylic /synthetic, semi viscous paste/ plaster containing quartz aggregate acrylic polymer mineral specially formulated to withstand varying
climate conditions and provide a long
lasting elegant look to surface having
very high aesthetic as well as
protection value. Highly durable and
maintenance free nontoxic,
non-flammable 2mm thick coating
having pH value 8-9 , specific gravity
1.70 kg/lit | - | Sqm | - | - | - |
| 7 | Item no.06 Providing and applying two coats
of exterior acraylic emulsion paint confirming to corresponding I.S. of approved manufacture and of approved colour to the plastered
surfaces including cleaning ,preparing the plaster
surface, applying primer
coat ,scaffolding if necessary , and
watering the surface for two days etc
complete. | - | Sqm | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.85 MB
ItemSpecification.pdf
Other Document • 0.02 MB
BOQ_2231301.xls
BOQ • 0.28 MB
Tenderdocument.pdf
Tender Documents • 0.28 MB
Download all tender documents and submit your bid