GE (AF) MC CHANDIGARH
Garrison Engineer (AF) MC Chandigarh 160 003
SPECIAL REPAIR TO BOILER OF 850 KG/HR CAPACITY OF ENGINE DIVISION AT 3 BRD UNDER GE (AF) MC CHANDIGARH
2026_MES_791156_1
GE (AF) MC/CHD/T-58/2026-27
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
CHANDIGARH
Please refer NIT and Tender Documents
9 documents required · 9 mandatory
₹500
GE (AF) MC CHANDIGARH
₹48,500
Yes
25 Sept 2026
25 Sept 2026
19 Oct 2026
25 Sept 2026
17 Oct 2026
9 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply, installation, testing and commissioning of package type LDO Fired designed low pressure steam generator 850 kg per hr capacity, Steam temperature 180 degree C with a maximum working pressure rating of 15 kg/Cm2 including one No. pressure part assembly consisting of closely wound helical vertical coil fabricated out of seamless pipes with spacers of special design, one in No. down firing pressure jet burner assembly, one No. double jacket air casing to enclose the pressure parts and serve as an integral combustion air Preheater along with specially designed aluminium radiator to minimise radiation losses and maximize efficiency, one in No. specially designed shell and tube type atmospheric economizer at the flue gas outlet of boiler to preserve heat and optimize the efficiency of Boiler. The steam generator should have comprised with the following standard fittings /Technical specifications:-
(a) Capacity of the Steam Generator - 850 Kg/Hr
(b) Maximum Working Pressure - 15 Kg/Cm2
(c) Fuel used - LDO
(d) Electric Supply - AC, 3 Phase, 415 V, 50 Hz, 4 wire System
(e) Four-Pass design with economizer
(f) Reverse flue design
(g) High Combustion efficiency
(h) Easy access for inspection and cleaning
(j) Fully automatic unit
(k) Low system lag and rapid warm up response
(l) Insulated body to minimise radiation losses
(m) Instant steaming | 1 | EACH | - | - |
| 1.01 | Steam Generator to be tested at factory and FAT shall be validated by GE complete and undertake the testing of individual of system as prescribed in tender along with composite testing of overall system and issue the testing and quality confirmation certificate for the safe and quality installation and submission of FAT certificate to be made to department for acceptance along with steam generator and site testing will be undertaken with following tests:-
(a) Ensure all components of the system are clean and free from foreign matter.
(b) Mechanical check shall be carried out on the system to ensure all the components are correctly installed and ready for use.
(c) General connection, inspection on supply piping, ignition system, safety shutdown device function test etc.
(d) Fuel supply line condition check
(e) Pump control function test
(f) Control test for safety devices
(g) Water chemical test, water level control test, feed system control test, loop test (on open circuit) for each of the circuit to be carried out at site. | - | - | - | - |
| 1.03 | Instruments controls and safeties:-
(a) Steam Pressure indicator - 01 No.
(b) Digital electronic steam temperature indicator-cum-controller - 01 No
(c) Steam pressure switch for ON-OFF combustion control - 01 No.
(d) Fuel Oil pressure indicator - 01 No.
(e) Feed water temperature indicator - 01 No.
(f) Feed water pressure indicator - 01 No.
(g) Low level Control - 01 No.
(h) Flame failure device (Part of sequence controller) - 01 No.
(j) Audio visual alarm for abnormal conditions - 01 No.
(k) Limit switch on blow down line - 01 No.
(l) Explosion door - 01 No. | - | - | - | - |
| 2 | Supply, installation, testing and commissioning of water softening plant (FRP) for make-up water for Steam generators comprising of multiport valve with brine ejector and plastic piping complete with brine tank with fittings and brine filtering media and complete charge of cation exchange resin as per specification for the capacity as given below:-
Water Flow : 3000 LPH
Incoming Hardness: 300 mg/Ltr (Approx).
Working Pressure : 4 Kg/Sqm
Outgoing Hardness: Comm. Zero
Water Softening Plant as described above
NOTE: Quoted rate shall also include supply, installation, testing and commissioning of Online Monitoring System with local display. Online monitoring of supply output of softening plant will help to evaluate and monitor all the critical parameters for water softening plant. Approval of Softening plant and monitoring system shall be through TAC appointed by AO. | 1 | EACH | - | - |
| 3 | Supply, installation, testing and commissioning of pressure reducing station (PRS) (Non IBR approved) as per details and of following capacity with insulation and aluminium cladding (complete with by-pass arrangement) complete all as specified and as directed.
Location : Plant Room
Fowl Rate : 850 Kg/hr
Inlet Pressure : 10.54 Kg/cm2
Outlet Pressure : 3 Kg/cm2
Pressure reducing station shall be equipped with the following accessories:-
(a) Moisture Separator - 01 No.
(b) Inlet Pressure Gauge - 01 No
(c) Outlet Pressure Gauge - 01 No
(d) Inlet Isolation Valve - 01 No
(e) Outlet Isolation Valve - 01 No
(f) Bypass Valve - 01 No.
(g) Stop Valve for Drain / Instruments (Inlet) - 01 No.
(h) Stop Valve for Drain / Instruments (Outlet) - 01 No.
(j) 'Y' Type Strainer - 01 No.
(k) Pressure Reducing Valve - 01 No.
(l) Safety Valve - 01 No
(m) Piping of suitable size as recommended by OEM
Note :- All accessories of PRS shall be capable to withstand with a pressure rating of max.14 bar and made of stainless steel or project-specified alloy steel. The contractor shall submit the drawing with technical data of PRS of necessary approval. | 1 | EACH JOB | - | - |
| 4 | Providing, jointing, testing and commissioning 80 mm dia Seamless, Carbon steel pipes conforming to ASTM A-106 Gr.B (Sch 80 rating) with all fittings including tees, elbows, reducers, union, flanges, rubber gaskets, washer including galvanized supporting/ fixing the pipe on floor/ wall/ ceiling with clamps, hangers (using anchor fasteners) as per specification. Insulation to Steam pipes & fittings in accordance with specifications Rockwool 50mm thick, 150 Kg/M3 density with aluminium cladding of 24G. complete all as specified and as directed. | 15 | RUNNING METRE | - | - |
| 5 | Providing, jointing, testing and commissioning 65 mm dia Seamless, Carbon steel pipes conforming to ASTM A-106 Gr.B (Sch 80 rating) with all fittings including tees, elbows, reducers, union, flanges, rubber gaskets, washer including galvanized supporting/ fixing the pipe on floor/ wall/ ceiling with clamps, hangers (using anchor fasteners) as per specification. Insulation to Steam pipes & fittings in accordance with specifications Rockwool 50mm thick, 150 Kg/M3 density with aluminum cladding of 24G. complete all as specified and as directed. | 20 | RUNNING METRE | - | - |
| 6 | Providing, jointing, testing and commissioning 50 mm dia Seamless, Carbon steel pipes conforming to ASTM A-106 Gr.B (Sch 80 rating) with all fittings including tees, elbows, reducers, union, flanges, rubber gaskets, washer including galvanized supporting/ fixing the pipe on floor/ wall/ ceiling with clamps, hangers (using anchor fasteners) as per specification. Insulation to Steam pipes & fittings in accordance with specifications Rockwool 50mm thick, 150 Kg/M3 density with aluminium cladding of 24G. complete all as specified and as directed. | 25 | RUNNING METRE | - | - |
| 7 | Providing, jointing, testing and commissioning 40 mm dia Seamless, Carbon steel pipes conforming to ASTM A-106 Gr.B (Sch 80 rating) with all fittings including tees, elbows, reducers, union, flanges, rubber gaskets, washer including galvanized supporting/ fixing the pipe on floor/ wall/ ceiling with clamps, hangers (using anchor fasteners) as per specification. Insulation to Steam pipes & fittings in accordance with specifications Rockwool 50mm thick, 150 Kg/M3 density with aluminium cladding of 24G. complete all as specified and as directed. | 25 | RUNNING METRE | - | - |
| 8 | Providing, jointing, testing and commissioning 25 mm dia Seamless, Carbon steel pipes conforming to ASTM A-106 Gr.B (Sch 80 rating) with all fittings including tees, elbows, reducers, union, flanges, rubber gaskets, washer including galvanized supporting/ fixing the pipe on floor/ wall/ ceiling with clamps, hangers (using anchor fasteners) as per specification. Insulation to Steam pipes & fittings in accordance with specifications Rockwool 50mm thick, 150 Kg/M3 density with aluminium cladding of 24G. complete all as specified and as directed. | 30 | RUNNING METRE | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
TenderDocument58.pdf
Tender Documents • 1.19 MB
BOQ_886967.xls
BOQ • 6.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .