GEMC-511687740582353
Awarded to I P A ENGINEERING & MARKETING
₹8.1 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Making of trenches of size 600mm x 800mm starting from transformer to LT Panel in Power supply room by digging the soil by removing the debris or Malba from the trenches at AIR Kupwara | - | 9954 | 48 Mtr | 920 | 44,160 |
| Making of trenches of size 600mm x 800mm starting from transformer to LT Panel in Power Supply room of building by digging CC flooring by removing the debris or Malba from the trenches at AIR Kupwara | - | 9954 | 15 Mtr | 2,030 | 30,450 |
| Providing and grouting 4inch dia GI Pipes on the Cement concrete Flooring area at AIR Kupwara | - | 9954 | 14 Mtr | 1,155 | 16,170 |
| Providing, Grouting and fixing 4inch dia GI Pipes along the transformer foundation wall at AIR Kupwara | - | 9954 | 4 Mtr | 1,735 | 6,940 |
| Unwinding roll of 185 sq mm 3 and half core cable from the cable drum and laying 2 length of this power cable of 70mtr through the trenches and through the GI Pipes as laid down at AIR Kupwara | - | 9954 | 140 Mtr | 870 | 121,800 |
| Reconstructing the CC Flooring and repairing the area with Cement concrete and stone aggregate mixer and finishing the surface Complete in all respect at AIR Kupwara | - | 9954 | 1 Job | 17,345 | 17,345 |
| Providing and fixing cable route marker of cast iron 5inch dia in 5mtr interval in whole length of cable at AIR Kupwara | - | 9954 | 12 Nos | 870 | 10,440 |
| Making 01mtr dia loop of cable at both end of the spare cable and covering by soil with proper marking for future use at AIR Kupwara | - | 9954 | 1 Job | 5,780 | 5,780 |
| Making of trenches size 600mm x 600mm starting from DG Sets to LT Panel and Laying one layer of 4inch thick sand for each cable in the trenches at AIR Kupwara | - | 9954 | 35 Mtr | 920 | 32,200 |
| Providing and grouting of 3inch dia GI pipes along the DG foundation the Cement concrete flooring area at AIR Kupwara | - | 9954 | 20 Mtr | 1,735 | 34,700 |
| Unwinding roll of 95 sq mm 3 and half core cable from the cable drum and laying these 4 power cable each of 40mtr through the trenches and through the GI Pipes at AIR Kupwara | - | 9954 | 160 Mtr | 630 | 100,800 |
| Making 01mtr dia loop of both spare cables at both end cable and covering by soil with proper marking for future use at AIR Kupwara | - | 9954 | 1 Job | 5,780 | 5,780 |
| Providing and fixing cable route marker of cast iron 5inch dia in 5mtr interval in whole length of cable at AIR Kupwara | - | 9954 | 7 Nos | 870 | 6,090 |
| Installation and testing 2 Nos of 125 KVA Canopy type Diesel Generator set FM Transmitter at HPT TV site Kupwara J and K the scope and schedule of the material mentioned attached as Annexure A | - | 9954 | 2 Jobs | 187,170 | 374,340 |