Loading…
Loading…
Tender Value
₹3.3 L
EMD Value
₹6,640
Closing Date
3 Aug 2026, 4:00 pm
XEN REW Kathua
XEN REW Kathua
Shingle meteling on road from nown morh to house of munshi ram,kamal and others ward no4(1.20) Shingle meteling from sialna road to house of kuldeep, chankaar, and others ward no5 (1.21) const. of lane from Baagh to house of Pawan,Ramesh,Kaka and oth
2026_RDPR_316920_20
e-NIT No.128/REW/K of 2026-27 Dated 20/07/2026
Open Tender
Civil Works
Percentage
90 days
Nagrota Gujroo
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹6,640
20 Jul 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
3 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. | 97.2 | CUM | 24.12 | ₹2,344.46 |
| 2 | Supplying and stacking at site Graded crushed stone aggregate of size of 63mm to 45mm. | 40.5 | CUM | 1,204.15 | ₹48,768.08 |
| 3 | Supplying and stacking at site good earth. | 3.24 | CUM | - | - |
| 4 | Providing and Laying Water Bound Macadam with specified stone aggregate screening and Binding material including screening, sorting to template and consolidation with road roller 80-100 KN capacity. Base course (63mm - 45mm size) including screening with good earth in one layer of 75mm thick (consolidated) | 3.24 | CUM | 768.15 | ₹2,488.81 |
| 5 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 6.6 | CUM | - | - |
| 6 | Providing and laying in position dry stone aggregarte. All work upto plinth level with(stone aggregate of 40mm nominal size ) including spreading, compacting, and consolidation in all respect | 7.22 | CUM | 1,700 | ₹12,274 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 7.2 | CUM | 4,294 | ₹30,916.8 |
| 8 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 9.89 | CUM | 5,733.6 | ₹56,705.3 |
| 9 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of Engineer-in-charge | 125 | SQM | 816.15 | ₹1,02,018.75 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 47.2 | SQM | 286.35 | ₹13,515.72 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.67 MB
BOQ_1036526.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].