Tender Value
₹7.0 L
EMD Value
₹13,947
Closing Date
11 Sept 2026, 11:00 amClosed
Executive Engineer
HPPWD Division Chowari
P/L 80mm thick paver bloc at Rd 21/135 to 21/155 and Edge wall
2026_PWD_142670_3
NIT No. 5553-5660 dated 31.08.2026
Open Tender
Civil Works - Roads
Percentage
30 days
Chowari
Please refer Tender documents.
9 documents required · 9 mandatory
₹350
₹13,947
11 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in hilly area in all heights and depths and in all kinds of soil by manual /mechanical means including saturated soil comprising of ordinary soil ,ordinary roack,soft rock ,hard roack chieseling ,wedging out rock (where blasting is probihitted )and their intermediate classification of soil compelet including setting out true to the require lines,grades,width ,cutting and trimming of side slopes and levels as shown on the drawings and as direction of engineer-in-charge at site ,according to the technical specification section 300 and 1600 and sorting out useful material and stacking the same within all leads liftts in acquired width of road and transportation of un-usal materials for filling in roadway camber ,embankement for grade improvements abd disposal of all surplus material to dumping site is to be selected by the contractor at his own level in private land only through all modes of transportation including head load or animal transpot or mechanical means alongwith its leveling fine dressig and carriage of machineries material,tool ,equipment and safety measures and other incidental necessary to complete the work by contractor . | 162 | Per Cubic Metre | 255.3 | ₹41,358.6 |
| 2 | Providing and Laying mechanically mixed and vibrated plain cement concrete in foundation for all type of structure complete of plain concrete nominal mix 1:4:8 (one cement isto four sand isto eight graded) crushed stone aggregate 40 mm (Forty millimetre) nominal size in or under water and curingomplete including pumping or bailing out water, dewatering, removal of slush as required at site which may arrise at the time of laying under water complete for all hights / depth including the cost of form work complete in all respect as per the drawing and technical specifications clause 802, 803, 1202 and 1203 and as per direction of Engineer-in-Charge. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 36 | Per Cubic Metre | 5,200.5 | ₹1,87,218 |
| 3 | Providing and laying heavy duty precast cement concrete 80mm (eighty millimeter) thick inter locking paver blocks vibro compacted upto M-50 (M-fifty) grade including M-30 grade concrete edge block 300 mm x 300 mm x 150 mm of grey or coloured over the shade of block including curing, rubbing and polishing complete. Interlocking Concrete block pavement shall consist of surface layer of appropriate sized concrete paving blocks paved and compacted over thin bedding sand layer of specified grading, which is spread over a properly constructed and profiled base course and is bounded by properly installed edge restraints. The joints shall be filled by fine sand of specified grading. The concrete paving block shall conform to the relevant IS standard and as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate including the octroi, royalty, Malkana, toll tax, sales tax, GST or any other taxes imposed by the Government. | 360 | Per Square Metre | 1,172 | ₹4,21,920 |
| 4 | Earth work in excavation for all type of road structure such as retaining walls, breast walls, culverts, drains and parapets etcetera in all type of classification of soil, comprising of ordinary soil, ordinary rock, hard rock chiseling / wedging out rocks (where blasting is prohibited) as per drawings and MORD technical specification clause 305.1 and as per the directions of the Engineer-in-Charge including setting out, shoring and bracing, removal of stumps and other deleterious materials and disposal of materials upto any lead and upto any lift including dressing of sides and bottom and back filling in trenches with excavated suitable / approved materials to the original surface in layers not exceeding 150mm (one hundred fifty millimeters) compacted thickness including shoring and strutting and pumping and bailing out water (surface and sub soil water) upto any depth and any quantum of water including cleaning of slush which may arise out during dewatering as per directions of Engineer-in-Charge including carriage of materials within all leads, lifts and other incidentals. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 4.3 | Per Cubic Metre | 400.15 | ₹1,720.64 |
| 5 | Providing and Laying mechanically mixed and vibrated plain cement concrete in foundation for all type of structure complete of plain concrete nominal mix 1:5:10 (one cement isto five sand isto ten graded) crushed stone aggregate 40 mm (Forty millimetre) nominal size in or under water and curingomplete including pumping or bailing out water, dewatering, removal of slush as required at site which may arrise at the time of laying under water complete for all hights / depth including the cost of form work complete in all respect as per the drawing and technical specifications clause 802, 803, 1202 and 1203 and as per direction of Engineer-in-Charge. The rate including the octori, royality, Malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 9.6 | Per Cubic Metre | 4,701.6 | ₹45,135.36 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
SBD3.pdf
Tender Documents • 3.18 MB
BOQ_211968.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .