Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 CrAccepted-AOC | L1 | Accepted-AOC L1 bidder. | |
| 2 | L2₹9.2 Cr+₹57.6 L (6.68%)Rejected-Finance 4 FLOOR JEEVAN DEEP BUILDING 4 MILE SALUGARA BANJARA HILLS SILIGURI 734008 DISTRICT JALPAIGURI WEST BENGAL | L2 | Rejected-Finance L2 bidder. | |
| 3 | L3₹9.6 Cr+₹95.3 L (11.0%)Rejected-Finance | L3 | Rejected-Finance L3 bidder. | |
| 4 | L4₹9.6 Cr+₹1.0 Cr (11.7%)Rejected-Finance C 3 LAKHAN SONA NEAR RPS MORE BAILEY ROAD PATNA BIHAR PIN 801503 | PATNA | BIHAR | 801503 | L4 | Rejected-Finance L4 bidder. | |
| 5 | L5₹10.7 Cr+₹2.1 Cr (24.3%)Rejected-Finance | L5 | Rejected-Finance L5 bidder. |
| Sl No | Description | Qty | Unit | S G CONSTRUCTIONS L3 | PAVE INFRASTRUCTURE PRIVATE LIMITED L2 | SHIV VIJAY ENGICON PVT LTD L4 | BIKASH ADHIKARY L5 | SSD CONSTRUCTION L1 | BOMS Private Limited L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
All kinds of soil. | 14,958 | Cum | 126 ₹18,84,708 | 85 ₹12,71,430 Lowest | 115 ₹17,20,170 | 152 ₹22,73,616 | 90 ₹13,46,220 | 207 ₹30,96,306 |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 14,958 | Cum | 63 ₹9,42,354 | 159 ₹23,78,322 | 116 ₹17,35,128 | 80 ₹11,96,640 | 50 ₹7,47,900 Lowest | 296 ₹44,27,568 |
| 3.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1,550 | Cum | 1,170 ₹18,13,500 | 884 ₹13,70,200 | 1,440 ₹22,32,000 | 450 ₹6,97,500 Lowest | 1,015 ₹15,73,250 | 2,024 ₹31,37,200 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 982 | Cum | 4,860 ₹47,72,520 | 5,352 ₹52,55,664 | 4,250 ₹41,73,500 | 4,100 ₹40,26,200 | 3,900 ₹38,29,800 Lowest | 4,981 ₹48,91,342 |
| 5.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources). | 41.25 | Cum | 4,680 ₹1,93,050 | 5,119 ₹2,11,158.75 | 3,950 ₹1,62,937.5 | 3,970 ₹1,63,762.5 | 3,800 ₹1,56,750 Lowest | 4,680 ₹1,93,050 |
| 6.00 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete. | 5,044 | Sqm | 252 ₹12,71,088 | 240 ₹12,10,560 | 280 ₹14,12,320 | 297.7 ₹15,01,598.8 | 110 ₹5,54,840 Lowest | 522 ₹26,32,968 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 2,773.33 | Sqm | 360 ₹9,98,398.8 | 388 ₹10,76,052.04 | 390 ₹10,81,598.7 | 310.8 ₹8,61,950.96 | 115 ₹3,18,932.95 Lowest | 748 ₹20,74,450.84 |
| 8.00 | Centering and shuttering including strutting, propping etc. and removal of form for
Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 3,800 | Sqm | 306 ₹11,62,800 | 393 ₹14,93,400 | 370 ₹14,06,000 | 352.1 ₹13,37,980 | 120 ₹4,56,000 Lowest | 763 ₹28,99,400 |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for
Columns, Pillars, Piers, Abutments, Posts and Struts. | 5,962.67 | Sqm | 306 ₹18,24,577.02 | 243 ₹14,48,928.81 | 360 ₹21,46,561.2 | 370 ₹22,06,187.9 | 125 ₹7,45,333.75 Lowest | 658 ₹39,23,436.86 |
| 10.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,83,720 | Kg | 81 ₹3,10,81,320 | 72 ₹2,76,27,840 Lowest | 77 ₹2,95,46,440 | 102.6 ₹3,93,69,672 | 75 ₹2,87,79,000 | 95.6 ₹3,66,83,632 |
Tender Value
₹11.9 Cr
EMD Value
₹23.8 L
Closing Date
8 Sept 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AGM (E-C)
AAI, Bagdogra Airport, Bagdogra
Construction of property boundary wall of newly acquired land for New Terminal Building at Bagdogra Airport
2022_AAI_126037_1
AAI/BD/Engg.(C)/NIT-04/2022-23
Open Tender
Civil Works
Item Rate
330 days
Bagdogra Airport
As per NIT
5 documents required · 5 mandatory
₹3,540
₹23.8 L
Yes
18 Oct 2022
18 Aug 2022
9 Sept 2022
18 Aug 2022
8 Sept 2022
18 Aug 2022
18 Aug 2022 - 2 Sept 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
All kinds of soil. | 14,958 | Cum | - | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 14,958 | Cum | - | - |
| 3 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1,550 | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 982 | Cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources). | 41.25 | Cum | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete. | 5,044 | Sqm | - | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 2,773.33 | Sqm | - | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for
Lintels, beams, plinth beams, girders, bressumers and cantilevers. | 3,800 | Sqm | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for
Columns, Pillars, Piers, Abutments, Posts and Struts. | 5,962.67 | Sqm | - | - |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 3,83,720 | Kg | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_137760.xls
BOQ Document • 0.29 MB
103619804.pdf
Tender Document • 0.31 MB
TenderDocument.pdf
Tender Document • 12.13 MB
103619806.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .