Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹99,512.09Admitted-Finance | +7.00% | ₹99,512.09 | L1 | Admitted-Finance |
| 2 | L2₹1.0 LAdmitted-Finance | +9.00% | ₹1.0 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
7 Apr 2026, 6:00 pmClosed
Executive Engineer PWD DIvision Gandoh
Executive Engineer PWD DIvision Gandoh
Stage Contract for maintenance and snow clearance of TKN Road from km 28th to 36th for the year 2026-27
2026_PWDJK_307008_18
e-NIT 77 of 2025-26
Open Tender
Civil Works
Gandoh
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD DIvision Gandoh
₹20,000
10 Apr 2026
31 Mar 2026
8 Apr 2026
31 Mar 2026
7 Apr 2026
31 Mar 2026
31 Mar 2026 - 3 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Slip Clerance In ordinary soil disposal lead upto 50 m and lift upto 1.5 m. | |||||
| 2Slip Clearance In soils; mixed with moorum /Kankar /shingle/b oulders; disposal lead upto 50 m and lift upto 1.5 m. | |||||
| 3Slip Clarance In soils; mixed with Decomposed Rocks; by blasting or any other means | |||||
| 4Slip Clearance In medium hard rocks by blasting | |||||
| 5Slip Clearance In hard rocks by blasting | |||||
| 6Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-ChargeAll kind of soil | |||||
| 7Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-ChargeOrdinary Rock | |||||
| 8Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge Hard Rock | |||||
| 9Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge Hard Rock( Blasting Prohabited) | |||||
| 10Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge All kinds of soil | |||||
stage.html
html • 0.03 MB
techsummary_996371.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.93 MB
BOQ_996371.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid