Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC | L1 | Accepted-AOC Found lowest one bidder | |
| 2 | L2₹5.7 L+₹23,727 (4.36%)Rejected-AOC | L2 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹7 L
Closing Date
6 Oct 2022, 2:00 pmClosed
Executive Engineer
REW Leh
Construction of community hall at Shangrong Alchi
2022_RDD_7839_3
NIT 33 - UTL REWL OF 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Payable To Executive Engineer
Exempted
9 Dec 2022
28 Sept 2022
8 Oct 2022
28 Sept 2022
6 Oct 2022
28 Sept 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed: All kinds of soil .
Providing and laying of stone solling including cost of stone.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal
Random Rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1 :6:12 ( 1 Cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with 7.1A cement mortar 1:6 (1 Cement: 6 coarse sand)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars.
Centring and shuttermg including strutting, propping etc. and removal of form for• Foundations: footings, bases of columns etc. for mass concrete.
Centring and shuttermg including strutting, propping etc. and removal of form for• column.
Centring and shuttermg including strutting, propping etc. and removal of form for• beam.
Centring and shuttermg including strutting, propping etc. and removal of form for• suspended floors,roofs, landings, balconies and access platform.
Providing and fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centring, shuttering and complete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size)
viding wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Secound class kail wood
providing and fixing of local ornimental shingchaks.
Carriage of cement and steel average lead of 65 Km by mechanical transport.
Carriage of sand and aggregate average lead upto 30 km by mechanical transport.
carriage of stone avg. lead 30 km by mt.
M/S SONAM PUNCHOK
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .