| Sl No | Description | Qty | Unit | SRI BLUE METALS | SRI SELLIAMMAN AND CO |
|---|---|---|---|---|---|
| 1.00 | Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. | 1,794 | cum | 2,16,715.2 ₹2.6 L | 2,24,250 ₹2.6 L |
| 2.00 | Supplying and filling in foundation and basement with Stone Dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 89.7 | Cum | 27,627.6 ₹32,600.57 | 28,255.5 ₹33,341.49 |
| 3.00 | Plain Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 89.7 | cum | 5,03,620.65 ₹5.9 L | 5,06,805 ₹6.0 L |
| 4.00Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | |||||
| 4.01 | For Drain Side Wall | 1,833 | Sqm | 12,40,941 ₹14.6 L | 12,83,100 ₹15.1 L |
| 4.02 | For Drain Slab | 663 | Sqm | 6,70,690.8 ₹7.9 L | 6,76,260 ₹8.0 L |
| 5.00 | Supplying, fabricating, and placing in position of mild steel for all reinforced cement concrete works including cost and conveyance of steel and binding wire and all other labour charges for cutting bending tying grills charges for cutting, bending tying grills, straightening welding charges etc, complete complying with standard specification. | 19,510 | Kg | 18,72,960 ₹22.1 L | 19,51,000 ₹23.0 L |
| 6.00 | Providing and Laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm downgraded hard Brocken granite stone jelly for all RCC items of works with minimum cement content of 325 Kg/m3 and maximum water cement ratio of 0.555, including admixture (plasticiser/super Plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without improving strength and durability with about (5 cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3cu,m) 5156 kg of 10-12 machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of sand, but excluding cost of reinforced grill and fabrication charges, cantering and shuttering and also including laying, vibrating with mechanical vibrators, finishing curing etc., and providing fixture like fan clamps in the RCC floor/roof slabs wherever necessary without claiming extra etc,. Complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregate to be used should comply with requirements of IS Standards (No separate payment will be the department for the excess usage of materials) | 390.2 | cum | 33,49,086.6 ₹39.5 L | 33,55,720 ₹39.6 L |
| 7.00 | Supply ,Delivery and Fixing Of 110mm PVC Pipe of work Pressure 6kg/cm2 SOR VOL-1 (M-0865) PAGE-146 | 26 | Rm | 5,278 ₹6,228.04 | 5,460 ₹6,442.80 |
| 8.00 | Supply and delivery of Heavy duty 900 x 900 mm SFRC manhole Cover with Suitable Frame SOR VOL-1 (M-0716) PAGE-117 | 130 | Nos | 4,21,707 ₹5.0 L | 4,22,500 ₹5.0 L |
Tender Value
₹1 Cr
EMD Value
₹1 L
Closing Date
3 Feb 2026, 3:00 pmClosed
The Commissioner
New Colony 3rd Main Road,Chrompet
TCMC - Construction of RCC Storm water Drain at RKV Avenue to 200ft Radial Road in Ward No.21 Tambaram City Municipal Corporation Zone No.II
2026_DMA_646269_2
171/2025/E1 Z2
Open Tender
Civil Works - Others
90 days
Tambaram City Municipal Corporation Zone II
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1 L
13 Feb 2026
23 Jan 2026
3 Feb 2026
23 Jan 2026
3 Feb 2026
23 Jan 2026
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation and basement with Stone Dust in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Plain Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
For Drain Side Wall
For Drain Slab
Supplying, fabricating, and placing in position of mild steel for all reinforced cement concrete works including cost and conveyance of steel and binding wire and all other labour charges for cutting bending tying grills charges for cutting, bending tying grills, straightening welding charges etc, complete complying with standard specification.
Providing and Laying in position, Standardised Concrete Mix M-20 Grade in accordance with IS:456-2000, using 20mm downgraded hard Brocken granite stone jelly for all RCC items of works with minimum cement content of 325 Kg/m3 and maximum water cement ratio of 0.555, including admixture (plasticiser/super Plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without improving strength and durability with about (5 cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3cu,m) 5156 kg of 10-12 machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of sand, but excluding cost of reinforced grill and fabrication charges, cantering and shuttering and also including laying, vibrating with mechanical vibrators, finishing curing etc., and providing fixture like fan clamps in the RCC floor/roof slabs wherever necessary without claiming extra etc,. Complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregate to be used should comply with requirements of IS Standards (No separate payment will be the department for the excess usage of materials)
Supply ,Delivery and Fixing Of 110mm PVC Pipe of work Pressure 6kg/cm2 SOR VOL-1 (M-0865) PAGE-146
Supply and delivery of Heavy duty 900 x 900 mm SFRC manhole Cover with Suitable Frame SOR VOL-1 (M-0716) PAGE-117
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_774687.xls
BOQ • 0.36 MB
2.pdf
Tender Documents • 1.53 MB
Download all tender documents and submit your bid