Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.8 L+₹16,134.05 (4.45%)Rejected-Finance | L2 | Rejected-Finance RATE HIGHER THAN L1 | |
| 3 | L3₹4.0 L+₹40,821.93 (11.3%)Rejected-Finance | L3 | Rejected-Finance RATE HIGHER THAN L1 | |
| 4 | L4₹4.2 L+₹61,267.67 (16.9%)Rejected-Finance | L4 | Rejected-Finance RATE HIGHER THAN L1 | |
| 5 | L5₹4.6 L+₹1.0 L (27.9%)Rejected-Finance VILL P O KURCHI POST KURCHI P S KATWA DISTRICT PURBA BARDHAMAN PIN 713514 | KURCHI | PURBA BARDHAMAN | WEST BENGAL | 713514 | L5 | Rejected-Finance RATE HIGHER THAN L1 |
Tender Value
₹7.0 L
EMD Value
₹13,909
Closing Date
17 Aug 2021, 11:30 amClosed
Executive Engineer Burdwan North Highway Division
Executive Engineer Burdwan North Highway Division Aftab Club Court Compound 1st Floor PO and Dist_Purba Burdwan Pin713101
Urgent Pothole Repairing Works from 3.00 km to 13.00 km including improvement of road side flanks with dressing and chilchalling at Monteswar-Dainhat Road (SH-15) under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purb
2021_WBPWD_338138_1
WBPWDRoadsEEBNHDNIT3/21_2022
Open Tender
CIVIL WORKS
Percentage
21 days
BURDWAN
Please refer Tender documents.
5 documents required · 5 mandatory
₹13,909
Executive Engineer Burdwan North Highway Division
24 Nov 2021
29 Jul 2021
20 Aug 2021
6 Aug 2021
17 Aug 2021
9 Aug 2021
9 Aug 2021
eProcurement System of Government of West Bengal Created By: DIP NARAYAN SIL Created Date/Time: 13-Sep-2021 01:20 PM Tender Title: WBPWDRoadsEEBNHDNIT3/21_2022-1 Tender ID: 2021_WBPWD_338138_1
Tender Inviting Authority: Executive Engineer, Burdwan North Highway Division, P.W, (Roads) Directorate
Name of Work: Urgent Pothole Repairing Works from 3.00 km to 13.00 km including improvement of road side flanks with dressing and chilchalling at Monteswar-Dainhat Road (SH-15) under Katwa Highway Sub-Division of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2021-22
Contract No: WBPWDRoadsEEBNHDNIT03/21-22 (Sl-1)
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Sk. Najimuddin(GSTN-19AXOPS4654F1ZV) 695433.17 -47.86 362598.85 Three Lakh Sixty Two Thousand Five Hundred and Ninty Eight
2.00 KHEPI MA CONSTRUCTION AND BUILDERS(GSTN-NA) 695433.17 -39.05 423866.52 Four Lakh Twenty Three Thousand Eight Hundred and Sixty Six
3.00 SARA CONSTRUCTION(GSTN-NA) 695433.17 -27.62 503354.53 Five Lakh Three Thousand Three Hundred and Fifty Four
4.00 SANDIP CHOWDHURY(GSTN-NA) 695433.17 -45.54 378732.90 Three Lakh Seventy Eight Thousand Seven Hundred and Thirty Two
5.00 SAMRAT PAUL(GSTN-NA) 695433.17 -41.99 403420.78 Four Lakh Three Thousand Four Hundred and Twenty
6.00 AJIT SAMANTA(GSTN-NA) 695433.17 -33.33 463645.29 Four Lakh Sixty Three Thousand Six Hundred and Fourty Five
Lowest Amount Quoted BY: Sk. Najimuddin(362598.85)
BOQ Summary Details Tender Title: WBPWDRoadsEEBNHDNIT3/21_2022-1 Tender ID: 2021_WBPWD_338138_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Sk. Najimuddin 362598.85 L1
2 SANDIP CHOWDHURY 378732.90 L2
3 SAMRAT PAUL 403420.78 L3
4 KHEPI MA CONSTRUCTION AND BUILDERS 423866.52 L4
5 AJIT SAMANTA 463645.29 L5
6 SARA CONSTRUCTION 503354.53 L6
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .