Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹30.5 LAWARDED | ₹30.5 L | AWARDED |
Tender Value
₹29.2 L
EMD Value
₹58,360
Closing Date
22 Jul 2025, 10:30 pmClosed
Directorate of Municipal Administration
Flushing and cleaning of silt filled bore wells, replacement of damaged casing pipe and construction of cc pedestal around the bore well under tumakuru city corporation limits.
DMA/2025-26/OW/WORK_INDENT41684/CALL-2
DMA/2025-26/OW/WORK_INDENT41684/CALL-2
Open
Other Works
Electronic Documents, First(One Cover)
DMA City Corporation Tumakuru
₹730
₹58,360
15 Jul 2025
15 Jul 2025
19 Jul 2025
Flushing and cleaning of silt filled bore wells, replacement of damaged casing pipe and construction of cc pedestal around the bore well under tumakuru city corporation limits.
Logging / scanning of borewell at any depth continuously with the help of Logger unit including the cost of transportation charges, crew charges, stationery charges and cost of consumables etc
Cleaning of borewells including yield testing of borewell either using slow or fast rigs for not more than 2 hours at the final depth with a minimum working of 2 hours continuously with air compressor...
Labour charges for Lifting of non functioning submersible pump set alongwith cable and GI pipes Each length 6m for 50 mm
Lifting of struck up submersible pump set. above 300 ft
Supply of ISI mark 175mm nominal bore,plain and steel casing pipe grade of steel Fe 410 of wall thickness conforming to IS 4270-2001 and latest ammendments, electrical resistance welded steel tubes, m...
PVC pipes of 6 Kg/cm2 for 160mm 3.923
Aligment of hydraulic borewll lifting vehicle . Repair of dents or,folds present in existing casing pipe with the help of casing cutter hydraulic machine inorder to place pvc casing (cost of pvc pip...
Positioning of the rig for retrival vechical of failed borewells for Removing of old damaged ms casing pipe and erection of new casing pipe (cost of new casing not included)of dia 150mm to175mm includ...
Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per dr...
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Formwork As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate. Consider 35% of item concrete rate for drain wal...
Formwork :As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate. Consider 5% of item concrete rate for drain bed
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .