Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.58Accepted-Finance | ₹7.58 | L1 | Accepted-Finance L1 |
| 2 | L2₹7.59Rejected-Finance | ₹7.59 | L2 | Rejected-Finance L2 |
| 3 | L3₹9.35Rejected-Finance | ₹9.35 | L3 | Rejected-Finance L3 |
| 4 | L4₹8.63Rejected-Finance | ₹8.63 | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
18 May 2026, 2:00 pmClosed
EXECUTIVE ENGINEER PMGSY DIVISION BILLAWAR
WARD NO. 7 TILLA BILLAWAR
Birdhat_PR
2026_JKRRD_147599_15
07/EE/PMGSY/B OF 2026-27 DATED 12/05/2026
Open Tender
Civil Works - Roads
120 days
2026_2026
Please refer Tender documents.
6 documents required · 6 mandatory
₹600
₹24,000
EXECUTIVE ENGINEER PMGSY DIVISION BILLAWAR
1 Jun 2026
12 May 2026
18 May 2026
12 May 2026
18 May 2026
12 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres, as directed by
Engineer-in-Charge. All kind of Soil 70% Ordinary Rock 20% Hard Rock 10% | 315 | Cum | 359.57 | ₹1,13,264.55 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with
1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 23.76 | Cum | 4,826.5 | ₹1,14,677.64 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 6.88 | Cum | 5,733.6 | ₹39,447.17 |
| 0.0 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1
cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete (Coping) | 21.6 | Sqm | 416.5 | ₹8,996.4 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete. | 33.4 | Sqm | 286.35 | ₹9,564.09 |
| 0.0 | Hand-packing stones filling in wire-crates; including cost of crates and stones. | 362.88 | Cum | 1,765.59 | ₹6,40,697.3 |
| 0.0 | Dumping stone including cost of stones in Horizontal on level | 80 | Cum | 937.9 | ₹75,032 |
| 0.0 | Providing and laying watering and compacting in layers not exceeding 200mm thick with 80-100KN roller,river bed material free from organic material mixed with coarse aggregate round nallah shingle max. aggregate size 75mm thick including carriage from source to site of work including of all leads and lift complete. | 189 | Cum | 500 | ₹94,500 |
| 0.0 | Carriage of Material by mechanical transport from source to site of work includidng loading/un-loading complete
Sand / Stone aggregate below 40 mm for average distance 4.0 km | 21.16 | Cum | 183.58 | ₹3,884.55 |
| 0.0 | Stone aggregate Above 40 mm for average distance 4.0 km | 21.38 | Cum | 199.55 | ₹4,266.38 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_230384.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid