Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance NEW MARKET SINGRAULI DISTT SINGRAULI MP 486889 | SINGRAULI | SINGRAULI | MP | 486889 | ₹2.2 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 LAdmitted-Finance 12 NANDGAON PO NIGAHI DISTT SINGRAULI MP 486884 | SINGRAULI | MADHYA PRADESH | 486884 | ₹2.9 L | L2 | Admitted-Finance |
| 3 | L3₹3.6 LAdmitted-Finance AURI BEHIND SAHARA INDIA PO ANPARA DISTT SONEBHADRA UP 231225 | ANPARA | SONEBHADRA | UP | 231225 | ₹3.6 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s HARIHAR SINGH ELECTRICALS L3 | KUNWAR & SINHA ENGINEERING WORKS L1 | DUCK CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|---|
| 1.00PART-A (Supply): | ||||||
| 1.01 | Supply of 7/14 SGW GI wire for Guarding and earthing | 542 | Kg. | 85 ₹46,070 | 70 ₹37,940 | 80 ₹43,360 |
| 1.02 | MS flat (50x6) for clamp | 84.96 | Kg. | 85 ₹7,221.60 | 45 ₹3,823.20 | 60 ₹5,097.60 |
| 2.00PART-B (Erection): | ||||||
| 2.01 | Excavation of pole pit of required size and erection of 11 to 16mtrs Tubular Pole with fixing of required brackets, support angles, clamps and nut bolt, stay wire with stay insulator (with concrete mixture 1 bag cement/miner gravel) sand, suitable nut-bolt supply by contractor at his own cost) | 60 | No. | 2,000 ₹1.2 L | 666.4 ₹39,984 | 700 ₹42,000 |
| 2.02 | Laying, sagging, stringing of Dog/Wolf conductor including lumbering. | 5,400 | Mtr. | 3 ₹16,200 | 1.5 ₹8,100 | 2.5 ₹13,500 |
| 2.03 | Excavation of stay pit and grouting of stay assembly set in soft/hard rock/soil (with concrete mixture with 0.5bag cement/miner gravel / sand on supply by contractor) | 44 | No. | 400 ₹17,600 | 350 ₹15,400 | 400 ₹17,600 |
| 2.04 | Laying, sagging, stringing of guard / earth wire 7/14 SWG | 3,200 | Mtr. | 8 ₹25,600 | 1 ₹3,200 | 1 ₹3,200 |
| 2.05 | Fixing of 11/22KV disc insulator with hardware | 318 | No. | 55 ₹17,490 | 45 ₹14,310 | 20 ₹6,360 |
| 2.06 | Fixing of 11/22KV pin/post insulator | 12 | No. | 35 ₹420 | 45 ₹540 | 20 ₹240 |
Updated dates
Tender Value
₹3.8 L
EMD Value
₹4,900
Closing Date
22 Dec 2025, 5:00 pmClosed
GM(ENM), DCH
PO-KHADIA, DISTRICT-SONEBHADRA, UP- 231222
Shifting, Erection and Dismantling of HT Overhead line feeder F7 at Coal Section CHP Haul road to provide area for outsourcing dumping.
2025_NCL_348853_1
DCH/EnM/Tender/FLD/25-26/040
Open Tender
Miscellaneous Works
120 days
DUDHICHUA, NCL
Please refer tender documents.
4 documents required · 4 mandatory
₹4,900
23 Feb 2026
6 Dec 2025
23 Dec 2025
6 Dec 2025
22 Dec 2025
7 Dec 2025
6 Dec 2025 - 10 Dec 2025
PART-A (Supply):
Supply of 7/14 SGW GI wire for Guarding and earthing
MS flat (50x6) for clamp
PART-B (Erection):
Excavation of pole pit of required size and erection of 11 to 16mtrs Tubular Pole with fixing of required brackets, support angles, clamps and nut bolt, stay wire with stay insulator (with concrete mixture 1 bag cement/miner gravel) sand, suitable nut-bolt supply by contractor at his own cost)
Laying, sagging, stringing of Dog/Wolf conductor including lumbering.
Excavation of stay pit and grouting of stay assembly set in soft/hard rock/soil (with concrete mixture with 0.5bag cement/miner gravel / sand on supply by contractor)
Laying, sagging, stringing of guard / earth wire 7/14 SWG
Fixing of 11/22KV disc insulator with hardware
Fixing of 11/22KV pin/post insulator
Erection of double pole 3 wire cross arm for 11kv overhead line etc. as required
Erection of pole top/straight two wire/V shape two wire angle iron/channel iron cross iron arm on wood/RCC/PCC/steel tublar/rall pole etc. as required
Earthing with copper earth plate 600mm x 600mm x 3mm thick including accessories and providing masonry enclosure with cover plate having locking arrangements and watering pipe of 27mtrs long etc with charcoal/coke and salt as per requirement.
PART-C (Dismantling):
Dismantling of rail/tubular pole standard / strut embedded in cement concrete foundation etc transporting at site store/ regional store
Dismantling of overhead line material disc insulator, post/pin insulator, stay insulator hardware , conductor, GI wires and MS steel including, stacking at site store
Dismantling of stay rod assembly embedded in cement concrete foundation etc. transporting at regional store/ site store
Total impact of GST for the purpose of CTC
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.40 MB
BOQ_361589.xls
BOQ • 0.29 MB
LOB040.pdf
Tender Documents • 0.11 MB
Download all tender documents and submit your bid