Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-Finance R O DHOMKHAR | SOLAPUR | MAHARASHTRA | 413001 | ₹2.6 L | L1 | Accepted-Finance L1 Bidder |
| 2 | L2₹2.7 LAccepted-Finance | ₹2.7 L | L2 | Accepted-Finance Admitted |
| 3 | L3₹2.8 LAccepted-Finance | ₹2.8 L | L3 | Accepted-Finance Admitted |
| 4 | L4₹2.8 LAccepted-Finance | ₹2.8 L | L4 | Accepted-Finance Admitted |
| 5 | L5₹2.9 LAccepted-Finance SKIDNYANG | ₹2.9 L | L5 | Accepted-Finance Admitted |
| Sl No | Description | Qty | Unit | M/S THINLES ANGCHOK CONTRACTOR L11 | THINLAS DORJAY L1 | M/S TSERING ANGCHOK L7 | M/S DISKIT ANGMO L3 | M/S MOHD AMIR L10 | M/S GHULAM MOHD GOVT CONTRACTOR L4 | M/S TSEPHEL DORJAY GOV CONTRACTOR L5 | M/S STANZIN WANGDAN L6 | M/S AAQIB WAHID L2 | M/S STANZIN CHOSGYAL L8 | M/S ALI MOHD GOVT. CONTRACTOR L9 | M/S DORJAY NAMGIAL GOVT CONTRACTOR L13 | Mohd Ali L12 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by manual means, digging of pits in hard soil over an area (exceeding 30cm in depth 1.5m in width as well as 10sqmt on plan) including gathering out and disposal of excavated earth lead upto 50mm and lift upto1.5m as directed by incharge, in all kinds kinds of soil, neatly dressed and levelled. | 445 | cum | 209 ₹93,005 | 100 ₹44,500 | 250 ₹1.1 L | 165.71 ₹73,740.95 | 340 ₹1.5 L | 168.58 ₹75,018.10 | 200 ₹89,000 | 300 ₹1.3 L | 90 ₹40,050 | 260 ₹1.2 L | 250 ₹1.1 L | 240 ₹1.1 L | 350 ₹1.6 L |
| 1.02 | Random rubble masonry 5width hard stone in foundation in foundation and plinth including levelling up with cement mortar 1.6 (cement 6coarse sand) | 37.19 | cum | 6,200 ₹2.3 L | 5,500 ₹2.0 L | 4,500 ₹1.7 L | 5,000 ₹1.9 L | 4,500 ₹1.7 L | 5,000 ₹1.9 L | 4,808.39 ₹1.8 L | 4,000 ₹1.5 L | 5,100 ₹1.9 L | 5,000 ₹1.9 L | 5,200 ₹1.9 L | 5,700 ₹2.1 L | 4,849.61 ₹1.8 L |
| 1.03 | Providing and laying damp proof course 50mm thick with cement concrete 1:2:4 (1cement 2coarse sand 4graded stone aggregate 20mm nominal size. Copping. | 44.6 | sqm | 480 ₹21,408 | 183.54 ₹8,185.88 | 360 ₹16,056 | 300 ₹13,380 | 400 ₹17,840 | 300 ₹13,380 | 350 ₹15,610 | 382.8 ₹17,072.88 | 350 ₹15,610 | 319.45 ₹14,247.47 | 483.81 ₹21,577.93 | 500 ₹22,300 | 500 ₹22,300 |
| 1.04 | Carriage of sand lead up to 20km source to work site by MT transport including loading and unloading etc complete job. | 12.66 | cum | 100 ₹1,266 | 100 ₹1,266 | 200 ₹2,532 | 200 ₹2,532 | 240 ₹3,038.40 | 200 ₹2,532 | 100 ₹1,266 | 120 ₹1,519.20 | 250 ₹3,165 | 110 ₹1,392.60 | 400 ₹5,064 | 500 ₹6,330 | 150 ₹1,899 |
| 1.05 | Carriage of stone from source to work site by MT transport including loading and unloading etc. | 37 | cum | 100 ₹3,700 | 100 ₹3,700 | 300 ₹11,100 | 200 ₹7,400 | 260 ₹9,620 | 200 ₹7,400 | 100 ₹3,700 | 120 ₹4,440 | 550 ₹20,350 | 110 ₹4,070 | 400 ₹14,800 | 500 ₹18,500 | 150 ₹5,550 |
Tender Value
₹4.1 L
EMD Value
₹8,240
Closing Date
9 Feb 2026, 4:00 pmClosed
Divisional Forest Officer, Leh
Divisional Forest Office, Leh Fort Road UT of Ladakh
Construction of retaining wall at Skara Moon Land area of Leh Forest Range for the year 2025-26 under CAMPA 52g
2026_FEE_18429_3
e-Tender No 25 of FDL 2025-26
Open Tender
Civil Works - Others
30 days
Leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Divisional Forest Officer, Leh
₹8,240
24 Feb 2026
2 Feb 2026
10 Feb 2026
2 Feb 2026
9 Feb 2026
2 Feb 2026
Earth work in excavation by manual means, digging of pits in hard soil over an area (exceeding 30cm in depth 1.5m in width as well as 10sqmt on plan) including gathering out and disposal of excavated earth lead upto 50mm and lift upto1.5m as directed by incharge, in all kinds kinds of soil, neatly dressed and levelled.
Random rubble masonry 5width hard stone in foundation in foundation and plinth including levelling up with cement mortar 1.6 (cement 6coarse sand)
Providing and laying damp proof course 50mm thick with cement concrete 1:2:4 (1cement 2coarse sand 4graded stone aggregate 20mm nominal size. Copping.
Carriage of sand lead up to 20km source to work site by MT transport including loading and unloading etc complete job.
Carriage of stone from source to work site by MT transport including loading and unloading etc.
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_44324.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid