| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 CrAccepted-AOC | ₹5.2 Cr | L1 | Accepted-AOC AS UPLOADED |
| 2 | L2₹5.5 Cr+₹21.9 L (4.17%)Rejected-AOC | ₹5.5 Cr+₹21.9 L (4.17%) | L2 | Rejected-AOC AS UPLOADED |
Tender Value
Refer Docs
EMD Value
₹11 L
Closing Date
8 Apr 2022, 2:00 pmClosed
SUPERINTENDING ENGINEER
GANDAK IRRIGATION WORKS CIRCLE-2, GORAKHPUR(U.P)
BOULDER PITCHING IN SLOPE OF RIVER SIDE AT BOKTA BARWAR BUND FROM KM 3.100 TO KM 5.000 ON RIGHT BANK OF RIVER RAPTI IN DIST -GORAKHPUR
2022_UPIDC_683838_5
05/S.E./2021-22
Open Tender
Civil Works
Item Rate
90 days
Gorakhpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,614
₹11 L
27 May 2022
2 Apr 2022
8 Apr 2022
2 Apr 2022
8 Apr 2022
2 Apr 2022
Amount
Earth work in cutting for construction of Toe wall with all lead, lift, labour, T&P etc. complete including proper disposal of earth with all cost as per direction of Engineer-in-charge.
Earth work in filling river side of bund for slope pitching with cartage soil by Excavated Hudraulic Excavator equivalent capacity of 60 cum/hour and Transported by Tactor Trolly including cost of all material, labour, T&P etc complete as per direction of Engineer in-charge.
Supplying and laying of Mzp stone boulder (25 to 60)kg in mechanically woven double twisted Hexagonal shaped wire mesh gabion box/Crate of size (1.0x1.0x1.0) M., Mesh size (10x12)cm of 10 SWG G.I. wire in construction of Toe wall including cost of all Material, Carriage & Labour T&P etc.as per direction of engineer incharge.
Supplying and laying of 200 gsm Geo Textile sheet below Mzp. Stone boulder pitching with pegs including preparation of sub-grade with all cost of material, labour, carriage, T&P etc complete as per direction of engineer incharge.
Supplying and pitching of Mzp. Stone boulder (25 to 60)kg on slope of bund in River side as per Drawing including cost of all material, labour, carriage, T&P etc complete as per direction of engineer incharge .
Supplying and laying of O.B.B. filter material below channel shuits includingincluding cost of all Material, Carriage & Labour T&P etc.as per direction of engineer incharge.
Supplying and laying P.C.C. 1:4:8 over O.B.B. filter material in channel shuit and brick work on top of bund includingincluding cost of all Material, Carriage & Labour T&P etc.as per direction of engineer incharge.
1st class brick work in 1:4 cement mortar including all cost of materials, labour, T&P etc complete as per direction of Engineer in-charge.
Cement plaster in 1:3 C.M. including all cost of materials, labour, T&P etc complete as per direction of Engineer in-charge.
ANITA SINGH
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .