Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC H NO 272 SHIVOLKAR WADA MULGAO BICHOLIM GOA | BICHOLIM | NORTH GOA | GOA | ₹9.7 L | L1 | Accepted-AOC AOC Awarded |
| 2 | L1₹9.7 LRejected-Finance H NO 349 B 1 TUM WADO KORGAO PERNEM GOA | PERNEM | NORTH GOA | GOA | ₹9.7 L | L1 | Rejected-Finance Rejected |
Tender Value
₹12.1 L
EMD Value
₹24,134
Closing Date
13 May 2026, 3:00 pmClosed
Executive Engineer
2nd Floor, Gomantak Maratha Samaj, Dayanand Smruti, Panaji-Goa
Construction of Retaining wall near Prakash Mahadev Tirodkar house at New Wada, Tulaskarwadi, W.No. VI, V.P. Warkhand-Nagzar in Torxem ZP Constituency.(Under XVth Finance Fund)
2026_ZP_29093_1
NGZP/01/2026-27/21/97/L7
Open Tender
Civil Works
Percentage
120 days
North Goa Zilla Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹24,134
25 May 2026
6 May 2026
15 May 2026
6 May 2026
13 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 1.01 | All kinds of soil | 73.8 | m3 | 291 | ₹21,475.8 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 12.3 | m3 | 2,211 | ₹27,195.3 |
| 3Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : | |||||
| 3.01 | All works upto plinth level | 145.96 | m3 | 6,635 | ₹9,68,444.6 |
| 4Centering and shuttering including struttings, propping etc. and removal of formwork for : | |||||
| 4.01 | Foundations, footings, bases for columns and mass concrete. | 332.77 | m2 | 407 | ₹1,35,437.39 |
| 5Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge | |||||
| 5.01 | B) 75 mm dia | 75.6 | RM | 185 | ₹13,986 |
| 6Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing, complete. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_29523.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .