Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC H NO 272 SHIVOLKAR WADA MULGAO BICHOLIM GOA | BICHOLIM | NORTH GOA | GOA | ₹9.7 L | L1 | Accepted-AOC AOC Awarded |
| 2 | L1₹9.7 LRejected-Finance H NO 349 B 1 TUM WADO KORGAO PERNEM GOA | PERNEM | NORTH GOA | GOA | ₹9.7 L | L1 | Rejected-Finance Rejected |
Tender Value
₹12.1 L
EMD Value
₹24,134
Closing Date
13 May 2026, 3:00 pmClosed
Executive Engineer
2nd Floor, Gomantak Maratha Samaj, Dayanand Smruti, Panaji-Goa
Construction of Retaining wall near Prakash Mahadev Tirodkar house at New Wada, Tulaskarwadi, W.No. VI, V.P. Warkhand-Nagzar in Torxem ZP Constituency.(Under XVth Finance Fund)
2026_ZP_29093_1
NGZP/01/2026-27/21/97/L7
Open Tender
Civil Works
120 days
North Goa Zilla Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹24,134
25 May 2026
6 May 2026
15 May 2026
6 May 2026
13 May 2026
7 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 1.01 | All kinds of soil | 73.8 | m3 | 291 | ₹21,475.8 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 12.3 | m3 | 2,211 | ₹27,195.3 |
| 3Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : | |||||
| 3.01 | All works upto plinth level | 145.96 | m3 | 6,635 | ₹9,68,444.6 |
| 4Centering and shuttering including struttings, propping etc. and removal of formwork for : | |||||
| 4.01 | Foundations, footings, bases for columns and mass concrete. | 332.77 | m2 | 407 | ₹1,35,437.39 |
| 5Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge | |||||
| 5.01 | B) 75 mm dia | 75.6 | RM | 185 | ₹13,986 |
| 6Supplying and filling in plinth under floors, trenches including watering ramming consolidating, dressing, complete. | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_29523.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid