Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 LAccepted-AOC | ₹11.5 L | L1 | Accepted-AOC a |
| 2 | L2₹11.5 LRejected-Finance | ₹11.5 L | L2 | Rejected-Finance R |
Tender Value
₹11.5 L
EMD Value
₹23,000
Closing Date
2 Apr 2026, 12:00 pmClosed
EE REDBASTI
O/O EE REDBASTI
Gram Sabha Kanropur Pitch se Divhar Baba ke Sthan Hote Huye Ramayan Singh ke ghar tak Cc road nirman karya
2026_REDUP_1129958_4
2687/RED/PVN-Harriya/2025-26 Dt. 17.02.26
Open Tender
Civil Works
90 days
works
as per sbd
2 documents required · 2 mandatory
₹944
₹23,000
Yes
28 Apr 2026
25 Mar 2026
2 Apr 2026
25 Mar 2026
2 Apr 2026
25 Mar 2026
25 Mar 2026 - 2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Excavation in Foundation in ordinary soil (Loamclay or sand) including lift up to 1.5m and lead up to 30m. and including filling, sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the E/I up to a distance of 30m. from the foundation trenches including all T&P etc. complete Rate as per S.I.No. 251 | - | Cum | - | - | |
C.C. with 40 mm gauge brick balasst,C/Sand & Cement in the proportion of including 1:5:10 supply of all materials labour T&P etc. complete required for proper completion of the work as per S.I. No. 274 | - | cum | - | - | |
M-150 Class B/W in 1:4 cement & Coarse Sand finencess modulous mortar in foundation and plinth including supply of all material, labour tools and plants. etc. required for proper completion of work. Rate as per S.I.No. 305 | - | Cum | - | - | |
Providing, laying, spreading and compacting stone aggregates G-III of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate watering and compacting to the required density grading 3 as per technical specification clause 405 | - | cum | - | - | |
Providing and laying of 125 micron thick polythine sheet over subbase to act as separtion layer between subbase and concrete incleuding supply of all materials labour T&P etc. Required for proper completion of work. | - | sqm | - | - | |
Laying C.C road slab consisting of 1:1.5:3 cement, coarse sand & approved 2 cm gauge stone grit, over prepared sub grade after its rectifications & bringing it to proper camber and including supply of all materials, labour T&P etc. required for proper completion of work, finished to required templete as directed by E/I. but excluding cost of metal required for reflection of the sub-grade. S.l.No 773B | - | cum | - | - | |
construction of expension joint | - | sqm | - | - | |
12 mm. thick plaster in 1:3cement and coarse sand. Over plain surface including supply of all materials, labours and T&P etc. required for proper completion of work. As per S.I. No. 583. | - | sqm | - | - | |
Sign Board | - | No. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
Tendernotice_2.pdf
PDF • 0.34 MB
BOQ_2107886.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid