Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 CrAccepted-AOC HULURISINGHA CHHAK ANGUL | ANGUL | ANGUL | ODISHA | ₹6.9 Cr | L1 | Accepted-AOC aoc |
| 2 | L1₹6.9 CrRejected-Finance AT PADMAPUR ROAD P O PAIKAMAL DIST BARAGARH PIN 768036 | PAIKAMAL | BARAGARH | ODISHA | 768036 | ₹6.9 Cr | L1 | Rejected-Finance NOT QUALIFIED IN LOTTERY SYSTEM |
| 3 | L2₹7.2 Cr+₹27.3 L (3.95%)Rejected-Finance AT P O TANWAT PS NUAPADA DIST NUAPADA ODISHA PIN NO 766105 | NUAPADA | ODISHA | 766105 | ₹7.2 Cr+₹27.3 L (3.95%) | L2 | Rejected-Finance L2 BIDDER |
| 4 | L3₹7.2 Cr+₹30.3 L (4.38%)Rejected-Finance | ₹7.2 Cr+₹30.3 L (4.38%) | L3 | Rejected-Finance L3 BIDDER |
| 5 | L4₹7.3 Cr+₹40.7 L (5.88%)Rejected-Finance | ₹7.3 Cr+₹40.7 L (5.88%) | L4 | Rejected-Finance L4 BIDDER |
Tender Value
₹8.1 Cr
EMD Value
₹8.1 L
Closing Date
9 Dec 2025, 5:00 pmClosed
CHIEF CONSTRUCTION ENGINEER, R.W.CIRCLE, SAMBALPUR
CHIEF CONSTRUCTION ENGINEER, R.W.CIRCLE, SAMBALPUR
Construction of Bridge over River Kharla on Ranekela to Kendukhunti Road in the District of Sambalpur under SBY for the year 2024-25.
2025_CERWI_121720_4
BRIDGE TENDER ONLINE RWCSBP-18/2025-26
Open Tender
Civil Works - Bridges
Percentage
450 days
Kuchinda
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹8.1 L
Yes
9 Apr 2026
25 Nov 2025
10 Dec 2025
25 Nov 2025
9 Dec 2025
25 Nov 2025
25 Nov 2025 - 6 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting in all kind of soil within 50m initial leads &1.5m initial lifts includingrough dressing and breakingclods to max 5cm to 7cm and laying in layers not exceeding 0.3m in depth etc complete as per specification &direction of the Engineer-in-Charge . | 0.4 | Cum | 304.95 | ₹121.98 |
| 2 | Earth work excavation in foundation in Hard and compacted sheet rock within all leads and lifts including shoring, shuttering, propping bullahs, piling, dewatering from the foundation, supply & working of pumps stacking the excavated material away from the work in site. | - | Cum | 1,662.15 | - |
| 3 | Supplying & fitting fixing in position steel cutting edge as per approved design & drawing weighing not less than 80kg. per meter including steel cladding using M.S.Angles/ rods, plates bolts & nuts, rivets complete wherever necessary including bending to size & shape drilling holes riveting welding bolting etc. complete in all respects confirming to relevant IRC codes & ISI specification including cost conveyance & all taxes of all materials, labour & T&P & all machineries etc. required for the work with all leads & lifts complete in position in all respects (cutting edge to be placed at the level of the bottom of well cap indicated in Drg. or 150 mm. above L.W.L. as specified in the Drg. or as per written order of the Engineer-in-Charge. | - | MT | 10,695.74 | - |
| 6 | Labour of sinking single circular well caission/ crbwell of specified external diameter in all kinds of soil to lines levels & plumb by scooping out from inside the well & below the steining by chiselling, grabbing blasting (if required) etc, including cost of dredging chiseling, hammering, cutting with pick axes & crow bars, jack hammers or using any other modern devices for removing the rock i.e. methods of sinking inside rock strata, including cost of necessary tools & plants supply & work of pumps, dredgers & compressors, derrick, winches, cranes etc. bailings out of water & dredging removing all materials & obstacles from inside the wells by divers excluding pneumatic sinking with Air lock (however the use of exposives in removing & braking the rocks is probbited inside the well if steel, cladding has not been provided) & removing the materials & obstacles from inside the wells by divers & other mechanical devices inclusive of hire & running charges of all such machinery including materials & labour charges for providing kentledge loading if necessary & sinking to the required depth by loading with proper designed & preapproved weight & taking precautions adequately against tilting & shifting & dispiosal of the dredged materials away from the wells as per the direction of Engineer-in charge with all leads & lifts including hire & running charges of all machenaries cost of all labour with all leads lifts complete in all repects including all incidental charges like temporary sand filling, top pluging of well etc. for safety of the structure during execution as directed by the Enginer-in charge. (Payment will only be made for sinking of the well & other items required for the well sinking operation is only incidental & no payment will be made for such items) In all kinds of soil (Upto 10m. Depth)a) For 7.5m dia abutment wells | 1 | RMT | 28,422.79 | ₹28,394.37 |
| 7 | b) For 6.5m dia. pier wells | - | RMT | 23,412.36 | - |
| 8 | Sinking of R.C.C well sinking in soft rock (Non coring)/ Boulder/ Hard Soil )(wherein SPT>100) to lines levels & plum by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges. a) For 7.5m dia wells | 1 | RMT | 1,25,849.05 | ₹1,25,723.2 |
| 9 | b) For 6.5m dia. wells | 1 | RMT | 94,526.62 | ₹94,432.09 |
| 10 | Construction of R.C.C well sinking in soft rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges. a) For 7.5m dia wells | 1 | RMT | 3,40,226.33 | ₹3,39,886.1 |
| 11 | b) For 6.5m dia. wells | 1 | RMT | 2,55,547.78 | ₹2,55,292.23 |
| 12 | Construction of R.C.C well sinking in Hard rock to lines levels & plumb by scooping out from inside and below the steining including cost of hire and running charges of tools and plants and supplying & working of pumps bailing out of water and removal of all materials and obstacle from inside the well by divers etc. including precaution against shifting and lifting disposal of the soil with all leads and lift etc. complete as directed by the Engineer-in-charges. | 1 | RMT | 6,79,570.65 | ₹6,78,891.08 |
stage.html
html • 0.06 MB
technical_566684.pdf
techsummary_566684.pdf
finance_566684.pdf
BOQ Comparative Chart
xlsx
finsummary_566684.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
Tendernotice_2.pdf
PDF • 2.40 MB
Tendernotice_3.pdf
PDF • 0.40 MB
BOQ_566684.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .