Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹49.6 LAdmitted-Finance 171 B 4 MADHUR VIHAR DELHI | EAST DELHI | DELHI | 110092 | -22.69% | ₹49.6 L | L1 | Admitted-Finance |
| 2 | L2₹51.3 LAdmitted-Finance | -19.99% | ₹51.3 L | L2 | Admitted-Finance |
| 3 | L3₹54.0 LAdmitted-Finance LEHIYA NAGAR GODDA | -15.81% | ₹54.0 L | L3 | Admitted-Finance |
| 4 | L4₹62.1 LAdmitted-Finance | -3.20% | ₹62.1 L | L4 | Admitted-Finance |
| 5 | L5₹63.5 LAdmitted-Finance AMBADIHA PO BHADARIYA PS RAJABHITHA DIST GODDA | -1.11% | ₹63.5 L | L5 | Admitted-Finance |
Tender Value
₹64.2 L
EMD Value
₹1.3 L
Closing Date
25 Apr 2026, 5:00 pmClosed
EXECUTIVE ENGINEER
R.D SPL DIVISION, GODDA.
Construction of P.C.C. Road from Rest part of P.C.C. to Upper tola in Belpahari at village-Belpahari in panchayat - Susni, under block-Sunderpahari, Dist-Godda
2026_RDSPL_112806_1
RWD/SD/GODDA/01/2026-27 (Group No 04)
Open Tender
Civil Works
90 days
SUNDERPAHARI
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.3 L
6 Jun 2026
13 Apr 2026
27 Apr 2026
13 Apr 2026
25 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness.
RCD 2.03 (i) (A) | - | Hec | - | - | - |
| 2 | Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2 RCD 3.18 (ii) | - | M3 | - | - | - |
| 3 | Construction of granularsub-base by providing close graded material,spreading inuniform layers with motor grader on prepared surface, mixing by mix in place method with frontend loader at OMC, and compacting with vibratory roller to achievethe desired density, complete as per clause 401. Grading -1 Material
RCD 4.01 B(i) | - | M3 | - | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) BCD 5.3.1.1 | - | M3 | - | - | - |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete BCD 5.3.17.1 | - | M2 | - | - | - |
| 6 | Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight RCD 14.17 (IV) | - | M | - | - | - |
| 7 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I.+Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) BCD 5.1.1 | - | M3 | - | - | - |
| 8 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) BCD 5.1.10 | - | M3 | - | - | - |
| 9 | Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. BCD 5.6.3 | - | M3 | - | - | - |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) BCD 5.3.1.1 | - | M3 | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_152353.xls
BOQ • 0.25 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid