Tender Value
Refer Docs
EMD Value
₹3,400
Closing Date
8 Nov 2023, 2:00 pmClosed
Chief Engineer / MTPS I
Office of the CE / MTPS I / Mettur Dam
MTPS I Civil Circle - Providing two coats of oil bound distemper to the inner wall surface and painting two coats with enamel paint of steel structures and other allied civil works in compressor room Unit I of power house building at MTPS I
2023_EB_381885_1
CE / MTPS I / SE / CIVIL / SPN NO 29 / 2023-2024
Open Tender
Civil Works
Works
90 days
Mettur Thermal Power Station I / Mettur Dam
As per Tender Specification
2 documents required · 2 mandatory
₹0
₹3,400
Yes
21 Dec 2023
25 Oct 2023
9 Nov 2023
25 Oct 2023
8 Nov 2023
25 Oct 2023
Amount
Colour washing two coats of Oil bound distemper over one priming coat using white cement in inner surface walls including cost of materials, labour charges, cleaning the surfaces, scaffolding charges, lead, lift, etc, complete.,
White washing two coats of Oil bound distemper over one priming coat using white cement in ceiling roof including cost of materials, labour charges, cleaning the surfaces, scaffolding charges, lead, lift, etc, complete.,
Painting the old Iron work with two coats of enamel paint of approved quality and colour for windows and doors as directed by the Engineer at site including cost of all materials, labour charges, safety appliances, lead, lift, etc., complete.
Removing the loose particles from the damaged roof slab (Rcc) by chipping with tool and scrapping with wire brush, cleaning and washing thoroughly with water and plastering the surface neatly with CM 1:3/20mm thick after observing the following i.e. applying construction chemicals. 1. Applying Nitozinc primer to the exposed rods. 2. Applying bonding agent i.e. Nit bond EP to the exposed old concrete. 3. Renderoc RG as micro concrete. 4. Slurry primer using Nitobond SBR. The above work is including labour charges, working with all safety equipment , cost of all chemicals /materials ,charges for safety appliances, all lead, lift , conveyances of materials etc., in complete.
Providing two legged scaffolding using 15cm diameter of casuarina posts of 4m overall length from (3m height + 0.5m projection + 0.5m in the ground). The distance between the two rows being 1.25m and the facing of posts being 2m in both the rows with two horizontal posts with 0.5m overlap on either side and distance at 2m C/C middle braces to setup and providing a platform with country wood plants of 40mm thick in a complete form using coir or nails, cost of all materials, all lead & lift,all labour charges safety appliances etc., complete.
BALAJI BUILDER
R.P.K ENTERPRISES
ARP Engineering Contractor
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .