Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹88,814.34Admitted-Finance | -1.51% | ₹88,814.34 | L1 | Admitted-Finance |
Updated dates
Tender Value
₹90,000
EMD Value
₹1,800
Closing Date
15 May 2026, 5:00 pmClosed
EE PWD Elec Dn Ajmer
EE PWD Elec Dn Ajmer
Electrical Emergency Repair and Maintenance Work of Ceiling Fan and Damaged Hook, Jumbo/Desert Cooler at Govt. Satellite Hospital Ajmer
2026_CEPWD_556012_4
NIT 02 2026-27 EE PWD Elec Dn Ajmer
Open Tender
Electrical Works
60 days
Ajmer
Refer NIT
4 documents required · 4 mandatory
₹500
EGRAS Challan EE PWD Elec Dn Ajmer 7820
₹1,800
Yes
EE PWD Elec Dn Ajmer
26 May 2026
4 May 2026
15 May 2026
4 May 2026
15 May 2026
4 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2Rewinding of ceiling fan motor (starting and running winding) including all necessary material. The motor is to be wound taking no. of coils, turns and pitch as it was originally wound with required size super enamelled wire with 'E' class insulation material and making connections etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. (New model ceiling fan) | |||||
| 2.1 | 900/1200 mm sweep (New model ceiling fan) | 40 | Each | 505 | ₹20,200 |
| 3Charges for oiling, overhauling of ceiling fan, table fan, pedestal fan irrespect to the size of fan including removing,refixing of fan from site and testing etc. as required. | |||||
| 3.1 | Fans w/o Removing & Refixing | 20 | Each | 50 | ₹1,000 |
| 4 | Providing and Replacement of ball bearing of ceiling/ exhaust fan and refixing the same at suitable location as requiredand as per OEM recommendations. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material shall be retained by the contractor. | 40 | Each | 250 | ₹10,000 |
| 5 | Provinding & Replacement of M.S. Shaft of ceiling fan. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. | 40 | Each | 161 | ₹6,440 |
| 6 | P & Replacement of cover/ bearing seat of ceiling/ exhaust fan. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. | 40 | Each | 139 | ₹5,560 |
| 7 | P & F of rubber gromet (fan insulator) | 40 | Each | 30 | ₹1,200 |
| 8 | Providing and Replacement of Gun metal bush of ceiling/exhaust/cooler fan/ as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. | 20 | Each | 139 | ₹2,780 |
| 9S & F of capacitor of 230V/ 275V, 50Hz rating of plastic casing and terminals -Lugs or copper wire. | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.82 MB
Tendernotice_2.pdf
PDF • 23.83 MB
Tendernotice_3.pdf
PDF • 4.91 MB
Tendernotice_4.pdf
PDF • 1.76 MB
BOQ_990247.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid