Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC | L1 | Accepted-AOC Work was Awarded. | |
| 2 | L2₹1.7 L+₹28,818.63 (21.0%)Rejected-AOC 1 19 12 KATHAR MEERAN NAGAR THERMAL NAGAR TUTICORIN 628 006 | TUTICORIN | TAMIL NADU | 628006 | L2 | Rejected-AOC L2 Bidder. Work was not Awarded. |
Tender Value
Refer Docs
EMD Value
₹1,500
Closing Date
13 Jun 2024, 10:00 amClosed
CE/TTPS
Chief Engineer Tuticorin Thermal Power Station-Tuticorin
TTPS ES EM I Capital Maintenance of Stator Water System painting of Hydrogen Gas system seal oil system and stator water system equipments and pipe lines during the Major overhauling of the Unit II for the year 2024 2025
2024_EB_452945_1
CE/SE/ES /TTPS /No.116/2024-25
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
TTPS
As per BQR conditions in NIT
6 documents required · 6 mandatory
₹0
₹1,500
Yes
20 Jun 2024
8 Jun 2024
14 Jun 2024
8 Jun 2024
13 Jun 2024
8 Jun 2024
Stator water Secondary Cooler overhaul: Stator water Secondary cooler removing end covers from the secondary cooler at both ends. Cleaning the cooler tubes using cleaning brush and water. Testing the cooler for 4 Kg pressure and checking the leakage. Plugging the leaking tube. Refixing the end covers.
Stator water Secondary Cooler external painting: Painting one coat of enamel paint at outside of the tank, including cost of paint & consumables.
Stator water Secondary storage tank Cleaning & internal painting: Opening the manhole and cleaning inside of the storage tank. Painting two coats of epoxy paint at inside of the storage tank Painting two coats of epoxy paint at inside of the tank, including cost of paint & consumables.
Stator water Secondary storage tank external painting: Painting one coat of enamel paint at outside of the tank, including cost of paint & consumables.
Stator water secondary system 150mm valve overhauling: Dismantling the valve internals, cleaning checking and rectifying any damage polishing the seating portion, blue matching replacement of gasket, rope etc. Assembling painting and refixing properly.
Stator water ejector: Cleaning of the ejector, Disconnection of the pipe lines from the ejector, Removal of the ejector. Dismantling, cleaning and reassembling of what connected to the system.
Earth Pit: Opening of all earth pit in Unit II Transformer Yard, cleaning the earth electrodes, pit, checking the joints and earthing rod if necessary, Closing the cover after completion of work display the measured results.
Labour charges for painting of two coat of black enamel paint to painting the earth pit cover in transformer yard of 3 phase GT, UATs, UST & SST in unit-II transformer yard.
Scraping, cleaning and painting with two coats of enamel paint in Hydrogen Gas system, seal oil system & stator water system equipments and pipe lines including cost of paint & consumables.
Stator water Surge tank complete cleaning and float valve operation checking
Stator water Surge tank external painting: Painting one coat of enamel paint at outside of the tank including cost of paint & consumables.
KANDASAMY ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .