| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L1 | Accepted-AOC L1 | |
| 2 | L2₹20.1 L+₹6,050.73 (0.30%)Rejected-Finance 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | L2 | Rejected-Finance L2 | |
| 3 | L3₹20.1 L+₹8,759.34 (0.44%)Rejected-Finance 82 1 BECHU CHATTERJEE STREET KOLKATA 700009 | KOLKATA | KOLKATA | WEST BENGAL | 700009 | L3 | Rejected-Finance L3 | |
| 4 | L4₹20.2 L+₹12,294.30 (0.61%)Rejected-Finance 1 6 FAKIR CHAKRABORTY LANE | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹42,000
Closing Date
24 Nov 2020, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla, Kolkata- 700027
Water supply arrangement at LOT No.8 and lighting arrangement for Kashinagar, Kalinagar, Taxi stand, Kakdwip Roads, B.P. Road and other areas including emergency lighting at riverside, Jetty and surrounding area in connection with GS Mela 2021
2020_PHED_302532_4
WBPHE/EE/SMD/NIeT- 05 of 2020-2021
Open Tender
Electrical Work/ Equipment
Item Rate
45 days
LOT No 8
Please refer Tender documents.
6 documents required · 6 mandatory
₹42,000
Yes
3 Sept 2021
20 Oct 2020
26 Nov 2020
20 Oct 2020
24 Nov 2020
20 Oct 2020
Amount
Dismantling the hand pump with lifting of the 1.5” dia including drop pipe and other materials as per direction.
Washing the tube well by bucket wash system with the help of 1.5” dia. G.I. Pipe, check valve and other materials on hire basis incl. lowering the tube well by engaging – skilled and unskilled labour with supply of chemicals and other necessary materials required to complete the work as per direction of E.I.C. [a] 4” x 2” tubewell-4nos [b]12” x 6” tube well -2nos [Developing the above tube well by engine driven pump set and running maintenance of engine from 24.12.2020 to 31.12.2020.]
Carrying charges of following capacity pump set with diesel engine from Akshyanagar store to lot no.8 incl. pipes & specials & back the same to store after completion of mela including loading & unloading of 5 HP diesel engine with pump, 5 HP submersible pump set with column pipe panel board etc.
Complete dismantling of following pump & diesel engine for repairing overhauling washing and cleaning with changing of damage spares parts as per sample including reassembling the same with new spares complete.
5 HP diesel engine with pump
5 Hp submersible pump & motor
Painting the following pump & diesel engine with column pipe, pump, valve, base trolley by approved paint of desired shade and brand
5 HP diesel engine with pump
5 Hp submersible pumps with motor & column pipe.
1 HP Cora submersible pump with motor & column pipe
Installation of submersible pump motor with column pipes of length 60 ft. including all mechanical & electrical connection and outdoor type derrick arrangement complete.
Installation of Cora submersible pumps with column pipe length 60 ft. incl. all mechanical and electrical connection and outdoor type derrick arrangement complete.
Installation of 5 HP engine & pump with 1½” dia. delivery line with proper foundation as per direction of E.I.C.
Making delivery connection with fitting fixing of sluice valve, reflux valve etc. incl. supply of nuts & bolts, rubber insertion etc. all complete.
Installation of panel board on temporary basis with supply of 32/63 amps. TPN main switch & 63 amps changeover switch on hire basis incl. all electrical connection complete as per direction.
Supply & filling of mobile oil Servo Super of approved make in the engine including drainage of old mobile.
Making proper disinfections arrangement of delivery line by injecting bleaching solution including supply of required size poly, bucket, jar, stop cock & mug etc. as per direction of the E.I.C.
Running & maintenance of submersible pump set during mela period by engaging skilled operating staff round the clock with supply of necessary sundries from 02.01.2021 to 17.01.2021 = 16 days x 20 hrs.
Supplying & installation of diesel driven pump set on hire basis for cleaning the ditch water from 06.01.2021 to 17.01.2021 = 12 days x 2 sets.
Running & maintenance of KSB make cora submersible pump set during mela period by engaging skilled operating staff in 3 shifts with supply of necessary sundries from 04.01.2021 to 17.01.2021 = 14 days x 20 hrs x 2 (near Kashinagar).
Running & maintenance of new submersible pump sets during mela period by engaging skilled operating staff in 3 shifts with supply of necessary sundries from 04.01.2021 to 17.01.2021 = 14 days x 20 hrs x 1nos ( near Bus Stand).
Withdrawing of Cora submersible pump set along with column pipe and other specials after disconnection of electrical power incl. derrick arrangement as per direction of the E.I.C.
Taking out the diesel engine driven pump set incl. dismantling the suction & delivery line after completion of mela as per direction of E.I.C.
Withdrawing of submersible pump set with column pipe and other materials after disconnection or power line after completion of mela as per direction of E.I.C. incl. outdoor type derrick arrangement.
Supply & delivery site of bleaching powder with 33% chlorine in 25 Kgs. Poly bag (Sriram/DCM)
Supply and delivery at site of Calcium Hypoclorite [Ca(OCL)₂] granules with minimum chlorine content 60% to 65% in air tight plastic container. (Make- Shree Rayalaseem Hi Strength Hypo Limited / Hind Pharma / Aquafit / PHE approved) N.B= Test certificate should be submitted at the time of delivery.
Guarding arrangement of whole installation of above for the entire period round the clock.
Supply on hire basis 4.88 mtr. long and 100 mm.. dia (av) bottom and 50mm.dia. (av) top salbollah post and erecting the same at bus stand and other different places as per direction of E.I.C. (av. distance between two poles is 20 mtrs.)
Supply on hire basis 4.88 mtrs. long x 100mm dia. (av) bamboo post and erecting the same as different places as per direction of E.I.C.
Supply on hire basis of 9mtr long MS pole and erecting by excavation of earth in any kind of soil at different places of Lot No.8 as per direction of the EIC for the period from 04-01-2021 to 17-01-2021
Carrying of 2 Nos. departmental power distribution panel board, cable from store to different controlling station and return to store including storage after mela as per direction of EIC.
Installation of power distribution panel boards for power supply from WBSEDCL in different substation including electrical inter connection from departmental Panel Board to WBSEDCL Panel Board for LT. Distribution line before 06.1.2021 including proper earthing arrangement complete as per direction of EIC.
Drawing the power line from generating station to controlling switch by necessary required length of departmental supplied PVC insulated aluminum wire including interconnection with earthing arrangement as per IE Rules i.e. generator to elec. accessories of the temporary Controlling station.
Drawing halogen light point from different distribution line to the different places as per direction E.I.C. with supply of 1000 W. lamp, holder, fixture etc. to complete the work from 04.01.2021 to 17.01.2021 = 14 days x 15 pts
Supply and delivery at site 25 sq.mm 660/1200volt grade single core PVC insulated aluminum cable on hire basis
Drawing street light/ flood light point on hire basis from different distribution line on PCC pole/ MS pole along with metal road & different places for fitting of sodium vapour fixture including lamp and other accessories required for the work complete with guarding arrangement.
a) 400 watt twin 04.01.2021 to 17.01.2021 = 14 days x 10 pts
b) 400 watt single 04.01.2021 to 17.01.2021 = 14 days x 10 pts
c) 250 watt 02.01.2021 to 03.01.2021 = 2 days x 90 pts
d) 250 watt 04.01.2021 to 17.01.2021 = 14 days x 100 pts
Drawing the ceiling light points from different line to different hogla shed as directed with supply on hire basis 40 W bulb holders, wire etc and other necessary materials as required to complete the work from 06.01.2021 to 17.01.2021 = 12 days x 75 pts.
Temporary installation of panel board supplied by the department on wooden platform incl. supply of Salbollah post & wooden plank on hire basis as per direction of E.I.C. with construction of hogla shed as per deptt. Specification.
Drawing tube light points from different distribution & feeder line on salbollah post at different places with supplying on hire basis 40 W tube light choke starter & all other necessary materials required to complete the work from 06.01.2021 to 17.01.2021 = 12 days x 40 pts.
Temporary installation of controlling station with fitting fixing of 63/32 amp TPN & 16 amps SPN main switch as and when reqd. as per direction for E.I.C. incl. supply of salbollah post and wooden plank on hire basis with all required materials to complete the works on hire basis on or before 02.01.2021.
Carrying charges of panel board, switch, fixture etc. from Akshyanagar store to working site & back the same to store after completion of mela including loading and Unloading safely.
Guarding arrangement of whole installation of the above items for the entire period round the clock.
Taking out the whole installation after completion of mela as directed [all damaged materials will have to be replaced by the agency at their own cost and labour]
HIRING & RUNNING MAINTENANCE OF DIESEL ENGINE DRIVEN GEN SET Making and construction on hogla shed on temporary basis of size 14ft x 12ft including supply of hogla, bamboo and necessary materials as per direction..
Temporary installation of LT panel board on hire basis incl. outgoing feeder and incoming feeder for receiving generator line.
[ILLUMINATION ARRANGEMENT AT TEMPORARY BUS STAND] Carrying charges of 8mtr length PCC pole from Lot no.8 to Kamarer hut temporary bus stand[Kashinagar] including loading unloading complete of 8 nos pole and back to store after mela
Erection of the above pole at different places of temporary bus stand area by excavation of earth of depth 2 mtrs below ground level and filling with jhama bricks and soil as per requirement to complete the job including supply of jhama bricks
Drawing of overhead line in vertical configuration of medium pressure line by ACSR including supplying binding wire from jumper and insulator and safety device etc in different places as per ISS and IE rules also as per direction[ACSR conductor will be supplied departmentally]
Supply and drawing of continuous earth wire from end pole to receive pole by supplying 12 SWG GI wire with all necessary materials and earth clamp complete as per direction
Supply and delivery at site D type iron clamp set[galvanized] including necessary GI nuts, bolts, washer size 3.5” x 5” dia including loading, unloading complete as per direction
Supply of porcelain shackle insulator[75mm x 56mm] including loading, unloading complete as per direction
Supply at site of suitable pole clamp for existing PCC pole with iron angle fitting complete for 3Ph 4 wire overhead line as per ISS and IE rules complete as per direction [a] Size of Angle= 50mm x 50mm x 6mm thick [b]Size of Shackle= 6mm x 25mm
Supply at site the special type arm bracket made with 40mm dia GI pipe x 2 mtr long for street light fixture 250 watt SV lamp including MS coller weld at neck of the bracket making 600 bend at the top portion including painting red oxide paints as per direction
Supply at site special type MS clamp as per sample by MS patty as required length including necessary nuts, bolts, washer with painting red lead paint of approved make
Fitting fixing of D type iron clamp and pole clamp in the PCC pole after completion and erection as per IE rules
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanize bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
Making stay arrangement by 7/8 SWG GI standard stay including supply of necessary material i,e, stone chips, cement, sand, stay rod anchor plate to complete the job as per IE rules and ISS rules
Drawing of the street light points of new bus stand from distribution line to PCC pole as direction with supply of 250watt street light fixture with SON lamp and control gear on hire basis with all other necessary materials required to complete the work for the period from 07.01.2021 to 16.01.2021 = 10 days x 10pts
Painting with decorative cement base paint of approved quality after scraping the above pole surface thoroughly in different area as per direction of the EIC
Drawing ceiling light points from distribution line to different hogla shed for Police camp as per direction with supply on hire basis 60 watt bulb, holder and other materials required to complete the work from 04-01-2021 to 16-01-2021 = 13days x 50pts
Supply on hire basis 4.88mtr long and 0.10 mtr dia [av] bottom and 0.50mtr dia top salbollah post and erecting the same as per direction
Drawing tube light points on the salbollah post PCC pole with supply on hire basis 40 watt tube light choke, starter and other materials to complete the work from 08-01-2021 to 15-01-2021 = 8 days x 20points
Drawing of 400 watt twin type flood light fixture and SON-T lamp with control gear complete from 07-01-2021 to 16-01-2021 = 10 days x 9 points =90 points
Temporary installation of controlling station with 16amps TPN main switch on wooden board and sallballh on hire basis including electrical connection complete
Dismantling of ACSR conductor and earth wire from end pole after disconnection all joints, binding etc from PCC pole as per direction after complete of mela
Withdrawing the 8mtr length PCC pole by excavation of earth and lifting of poles carefully and stacking at safety places
Guarding of the whole installation by engaging labour as per direction of EIC in 3 shifts from 04.01.2021 to 16.1.2021
Taking out the whole installation of the above items after mela as per direction of EIC all damaged materials have to be replaced by the agencies at their own cost.
ILLUMINATION ARRANGEMENT FROM KAKDWIP MAIN ROAD TO WOODEN BRIDGE NEAR PANCHAYET Drawing of halogen light point on WBSEDCL PCC pole as per direction with supply on hire basis 1200 watt halogen lamp, holder etc all other materials required to complete the work from:
[a] 08-01-2021 to 16-01-2021 = 9 days x 15pts [for Kakdwip Road to Wooden Pole]
[b] 08-01-2021 to 16-01-2021 = 9 days x 5pts [for Kakdwip New Constructed bridge]
Supply and drawing of LT distribution line on hire basis with16 sq. mm. 1100 volt grade single core cable from overhead line to fitting with 15amp tumbler switch and connection complete and maintenance for 9 days at different sites:
[a] for Kakdwip Road to Wooden Pole
[b] for Newly constructed bridge
[ILLUMINATION ARRANGEMENT FROM A.T. STEAMER GHAT INCLUDING OTHER PLACES] Supply on hire basis 4.88 mtr. long and 0.12 mtr. dia (av) bamboo post & erecting the same at different places as per direction of E.I.C. (average distance from pole to pole is 25 mtrs.)
Drawing of tube light point from generating stn. as directed with supply on hire basis commercial fixture choke starter, holder, 40 watt tube light, wire etc. and other necy. materials, reqd. for the work from 04.01.2021 to 17.01.2021 = 14 days x 100 pts.
Drawing of street light point from generating station as directed with supply on hire basis 60 W bulb, wire etc. & other necessary materials required for the work from 08.01.2021 to 22.01.2021 = 15 days x 30 pts.
Drawing of halogen light point on bamboo post from generating station as directed with supply on hire basis 1000 W lamp, holder, wire shed etc. all other materials required to complete the work from 04.01.2021 to 17.01.2021 = 14 days x 15 pts.
Drawing of halogen light points on bamboo post from generating station as directed with supply on hire basis 1000 W bulb, holder, wire shed etc. and all other materials reqd. to complete the work from 18.01.2021 to 22.01.2021 = 5 days x 4 pts.
Drawing of ceiling light point from different lines to different places as per direction of E.I.C. incl. supply on hire basis 40 W bulb, holder, wire etc. all other materials required to complete the work from 07.01.2021 to 17.01.2021 = 11 days x 50 pts.
Electrical connection for control station incl. supply on hire basis necy. Main switch change over switch where required connection as per direction of EIC.
Carrying charges of L.T. panel board and other materials from Akshyanagar store to Kakdwip and back to store after completion of mela incl. loading and unloading complete.
GROUP-C ILLUMINATION ARRANGEMENT FROM PANCHAYET OFFICE WOODEN BRIDGE TO NARASHIMA ROAD [EXTENDED PORTION] Drawing of 250 watt steel light fixture complete set with 250 watt lamp fixing on WBSEDCL pole temporarily on hire basis and connection complete from 08-01-2021 to 16-01-20201 = 9 days x 75 pts
GROUP—D ILLUMINATION ARRANGEMENT FROM KAKDWIP RAILWAY STATION TO KAKDWIP ROAD Drawing of street light point from salbollah post and P.C.C. pole from Kakdwip Railway Station to Kakdwip Road as per direction with supply on hire basis 400 watt. Sodium vapour fixture lamp ballast and other materials reqd. to complete the work from 08.01.2021 to 17.01.2021 = 10 days x 15 pts..
Drawing of flood light point at Kakdwip station on P.C.C. pole and street tubular pole from different feeder line as directed with fitting fixing of 400 watt twin type SON-T flood light fixture and lamp control gear bulb etc. as reqd. to complete the work on hire basis for the period from 08.01.2021 to 17.01.2021 = 10 days x 12 pts..
Drawing ceiling light points from different distribution line to different hogla shed as per direction of E.I.C. with supply on hire basis 60 watt bulb, holder and other materials reqd. to complete the work from 08.01.2021 to 17.01.2021 = 12 days x 80 pts.
Supply on hire basis of 9 mtrs. long steel pole and erecting by excavation of earth in any kind of soil at different places of new bus stand and different area as per direction of E.I.C. for the period from 08.01.2021 to 17.01.2021
Drawing of L.T. feeder and distribution line from medium pressure voltage by 3 phase 4 wire system as per I.E. rules and ISS by 16 sq. mm. PVC single core cable on hire basis salbollah post incl. supply of necy. cable as per direction of E.I.C.
Temporary installation of controlling station with fitting fixing of different sizes main switch on wooden plank salbollah on hire basis incl. electrical connection complete as per direction of E.I.C.
Making earthing arrangement by supplying 5/8” dia earth spike of 2 mtr long with galvanized bolts nuts and washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole
Making and const. of hogla shed as temporary basis size 8’ x 12’ including supply of hogla, bamboo, and necessary materials as per direction.
Guarding of the whole installation by engaging experience labour as per direction of E.I.C. in three shifts from 08.01.2021 to 17.01.2021
Taking out the whole installation of the above items after mela as per direction of E.I.C. all damages materials have to be replaced by the agency at their own cost.
Supply on hire basis 4.88mtr long and 100 mm. dia. (av.) salballah post and erecting the same at different places as per direction. Average distance from pole to pole is 20mtr
Drawing of T.L. point from generating station as directed with supply on hire basis of TL fixture, choke, starter, holder 40watt tube, wire etc and other necessary materials required for the work including guarding arrangement from 08.01.2021 to 17.01.2021 = 10 days x 50pts
Drawing of street light point from generating station as directed with supply on hire basis 60watt bulb, wire etc and other necessary materials required for the work including guarding arrangement from 08-01-2021 to 17.01.2021 = 10 days x 25pts
Drawing of halogen light point on salbollah post from generating station as directed with supply on hire basis 1000watt lamp, holder, wire shed etc and all other materials required to complete the work from 08.01.2021 to 17.01.2021 = 10 days x 12pts
Electric connection for different power wiring system including supply on hire basis necessary main switches, wiring and all other connection as per direction of EIC
Guarding of the hole installation by engaging experienced labours per direction of EIC in 3 shifts from 08.01.2021 to 17.01.2021
Taking out the whole installation of the above items after mela as per direction of EIC. All damaged materials have to be replaced by the agencies at their own cost and labour
Carrying charges of LT panel board and other materials from Kakdwip to Kamarer Hut and back to store after completion of mela including loading unloading compete
Drawing street light point from different distribution line on WBSEDCL pole at river canal site as directed with 250watt SV fixture including lamp and other accessories required for the work compete on hire basis from 08.01.2021 to 17.01.2021 = 10 days x 85 pts
Fitting fixing of special type arm bracket on PCC pole by supplying materials as directed
GROUP—B ILLUMINATION ARRANGEMENT OF EXTENDED ROAD NEAR B.P.ROAD AND WOODEN BRIDGE AT KAKDWIP AREA Supply on hire basis of 250watt SV fixture including lamp and other accessories required for the work and drawing street light point from different distribution line of WBSEDCL pole for extended road side complete as directed from 08-01-2021 to 17-01-2021 = 10 days x 50 pts
Supply on hire basis 400 watt sodium flood light fixture with 1 no control gear box and SV lamp etc and drawing of flood light points to complete the work as directed from 08-01-2021 to 17-0-2021 =10 days x 20 pts
Supply at site the special type arm bracket made with 40 mm dia GI pipe x 2 mtrs long for street light 250 watt SV lamp fixture including making 600 bend at the top portion including painting by red oxide paint as per direction.
Supply delivery and fixing of suitable size pole clamp as per direction of EIC
Fitting fixing of special type arm bracket with pole clamp on the PCC pole as directed
Drawing of flood light points for Newly Approach Road and other place as directed on supply on hire basis 400 watt sodium flood light fixture-1 No, control gear box and SV lamp etc and complete the work from 04-01-2021 to 17-01-2021= 14 days x 35pts.
Drawing of the flood light point for main entrance of the jetty fixing on MS joint as per direction of EIC. Supply on hire basis 400 watt twin type flood light fixture and 2 nos SON lamp with control gear box complete from 04-01-2021 to 17-01-2021 =14 days x 25 pts.
Drawing of 250 watt street light fixture in different place of Newly Approach Road on hire basis of 250 watt S.V fixture ballast,250 watt S.V. lamp from 04-01-2021 to 17-01-2021= 14 days x 150 pts.
Supply & drawing of distribution line for medium pressure voltage, 3Phase 4 wire system by 25sq.mm single core PVC insulated wire on hire basis including dismantling the same after completion the work.
Supply on hire basis of 9 mtr. Long MS pole and erection and fitting fixing on the jetty bridge as per direction of EIC for the period from 04-01-2021 to 17-01-2021
Supply and delivery at site D. type iron clamp set galvanized with necessary GI nuts and washer size 31/2'' x 5'' dia.
Supply and delivery at site of porcelain shackle insulator size 75mm x 88mm.
Fitting fixing of D type iron clamp, porcelain shackles and ole clamp in the MS pole after completion of the erection work.
Making earthing arrangement by supplying 5/8'' dia earth spike of 2 mtr long with galvanized bolts nuts sand washer etc including supplying and fitting fixing 8 nos SWG GI wire and restoration of the surface duly rammed as per direction and inter connection earth spike to continuous running earth on the top of the PCC pole.
Guarding charge of the whole installation round the clock as per direction.
Drawing of metal flood light points on hire basis on surrounding area of Jetty No. 1, 2, 3, 4 & 5 of 400 watt metal flood fixture, lamp, control gear etc. reqd. to complete the job from 11-01-2021 to 14-01-2021 = 4 days x 80 pts.
Drawing of 250watt street light fixture in different place of jetty ghat No. 1, 2, 3, 4, 5 & VIP Jetty on hire basis of 250watt S.V. fixture ballast, 250watt S.V. lamp from 11-01-2021 to 14-01-2021 = 4 days x 50 pts.
SCHOOLS, HARBOUR ANCHAL AREA, TEMPORARY TOILETS AND OTHER AREA Supply on hire basis of 9 mtrs. long steel pole and erecting by excavation of earth in any kind of soil at different places of different area as per direction of E.I.C. for the period from 08.01.2021 to 17.01.2021
Drawing street light points from different distribution and feeder lines salbollah posts to different places directed with supply on hire basis 100 watt. bulb, holder bracket and necessary materials required to complete the work from 08-01-2021 to 17-01-2021 = 10 days x 80 pts x 9 Nos. school
Drawing street light points from different distribution and feeder lines salbollah posts to different places directed with supply on hire basis 100 watt. bulb, holder bracket and necessary materials required to complete the work from 10-01-2021 to 17-01-2021 = 8 days x 250 pts
Drawing of metal flood light points on hire basis for illumination of school compound from different feeder of 400 watt metal flood fixture, lamp, control gear etc. reqd. to complete the job from 08-01-2021 to 17-01-2021 = 10 days x 5 pts x 14 Nos. school
Drawing of metal flood light points on hire basis for illumination of school compound from different feeder of 400 watt metal flood fixture, lamp, control gear etc. reqd. to complete the job from 10-01-2021 to 17-01-2021 = 8 days x 115 pts
Supply & fitting fixing of 2 PIN 5 amps plug point for mobile chargers & 3 pin 15amps plug point for special purpose on hire basis
Drawing the street light points from different feeder and distribution line to PCC pole to different places as directed with supply on hire basis 250 W sodium fixture lamp ballast and other necessary materials reqd. for the work to complete from 05.01.2021 to 17.01.2021=13days x 9pts
Drawing of LT distribution line from medium pressure voltage by 3 Ph. 4 wire system as per IE rules and ISS rules by PVC single core wire on hire basis on salbollah post & on PCC pole incl. supply of wire installation of binding wire etc. as directed before 04.01.2021
Supply, delivery and fitting fixing of LT spacer for 4 wire vertical configuration line as per direction of EIC.
Supply of hire basis 4.88 mtr long and 0.10 mtr. dia (Av.) bottom and 50 mm. dia. top salbollah post and erecting the same at Bus Stand and other different places as per direction of E.I.C. (av. distance between the two poles is 20 mtrs.)
Drawing of light point of 400 watt twin type flood light fixture and son lamp with control gear complete on hire basis from 04.01.2021 to 8.01.2021 = 5 days x 6 pts
Drawing the street light points from different feeder and distribution line to PCC pole to different places as directed with supply on hire basis 250 W sodium fixture lamp ballast and other necessary materials reqd. for the work to complete from 09.01.2021 to 17.01.2021 =9 days x 4 pts
Considering present pandemic situation actual quantity of work may differ from BOQ which shall be finalized by the EIC / competent authority in due course..
ADD GST @ 12%
B T PROJECTS PRIVATE LIMITED
H. DEY ELECTRIC STORES
H.K.DAS AND CO.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .