Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.6 LAccepted-AOC | 1 | Accepted-AOC lowest | |
| 2 | 2₹14.3 L+₹1.6 L (12.9%)Rejected-AOC VPO KALPA TEHSIL KALPA DISTT KINNAUR HIMACHAL PRADESH | 2 | Rejected-AOC 2nd lowest |
Tender Value
₹12.2 L
EMD Value
₹24,477
Closing Date
23 Sept 2020, 5:00 pmClosed
Executive Engineer
JS Division Reckong Peo
CO RCC intake chamber, LJT of GI pipes 80 mm dia at RD 0 to 8000
2020_HPIPH_39855_3
RKP-KNR00-7082-
Open Tender
Civil Works
Item Rate
90 days
Reckong Peo
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
EE Reckong Peo
₹24,477
Yes
13 Aug 2021
18 Sept 2020
24 Sept 2020
18 Sept 2020
23 Sept 2020
18 Sept 2020
Amount
Excavation in foundations in all kinds of soil such as pick work ,jumper work, blasting hard or soft rock chiseling where blasting is prohibited or saturated soil , lift upto 1.50 mtr stacking the excavated soil not more than 3.00 mtr clear from the edge of the excavation and then returning the stacked soil in 15 cm layers when required into plinth sides of foundation consolidating each deposited layers by ramming and watering and then disposing of all surplus excavated earth as directed with a lead of 20 mtrs. P/J Work 50% each.
Boulder /stone filling hand packed tightly under floor with in all leads and lifts.
Providing and laying cement concrete 1:4:8 (1 cment:4 sand: 8 graded stone agg. 40mm Nominal size) and curring complete excluding the cost of form work in foundation & plinth within all leads and lifts complete.
Providing & Laying Cement Concrete 1:1/2:3 (1 Cement:1/2 Sand:3 Graded Stone aggregate 20mm nominal size) and curing complete excluding the cost of form work in foundation and plinth.
In foundation and plinth.
Vertical walls (any thickness attached pillesters, buttresses plinth and string courses etc. form top of foundation and plinth.
P/L RCC work 1:2;4 (1 cement :2 sand : 4 graded stone agg. 20mm N/s) and curring complete excluding the cost of form work and reinfocement for reinforced work in:- suspended floor, roofs, landing shelves and their support balconies beams, griders. bressumers and cantilever within all lead and lifts.
Providing tor steel reinforcement for RCC work i/c bending, binding and placing in position complete upto floor two level (tor steel)
Providing form work with steel plates 3.15mm thick so as to give a fair finish including centering, shuttering strutting and propping etc. height of propping and centering below supporting floor to cielling not exceeding 4.00 mtr and removal of the same for insitu reinforced concrete and plian concrete work in:-
a) Vertical surfaces such as walls (any thickness) partitions and the like including attached pillaster buttresses, plinth and string courses and the like with in all leads and lifts.
b) Flat surfaces such as soffits of suspended floors, roofs, landings and the like. Lloors etc. upto 200mm. In thickness with in all leads and lifts.
Providing no fine cement concrete 1:3 ( 1 cement : 3 Agg. 20mm nominal size) in all leads & lifts
Providing and placing filtering media in all leads & lifts.
Course sand 3-6mm
Bottom layer 50- 75 mm
Laying & Jointing in treanches GMS tube (MG) and tube fitting (earth work in trenches to be measured and paid seprately) as per the direction of the Engineer-in-Charge including all fittings complete.
80mm dia
JAI KISHAN CONTRCATOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .