Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 LAccepted-Finance H NO 116 GOVIND VIHAR COLONY JANTA ROAD SAHARANPUR | L1 | Accepted-Finance L1 | |
| 2 | L2₹11.7 L+₹4,678.94 (0.40%)Accepted-Finance CHHAPRAULI | BAHRAICH | UTTAR PRADESH | 271801 | L2 | Accepted-Finance L2 | |
| 3 | L3₹11.8 L+₹13,109.08 (1.13%)Accepted-Finance | L3 | Accepted-Finance L3 |
| Sl No | Description | Qty | Unit | RAJ KUMAR TYAGI L3 | YOGESH KUMAR L1 | AJAY KUMAR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Silt clearance /trench digging i/c lift up to 1.5 m and lead up to 06 m, i/c cost of driver/assistant driver, POL, maintenance of Machine, conrtactor Profit, taxes etc But excluding leveling, dressing and compaction. By Hydrolic excavator /JCB /equivalent Capacity 25 cum/ Hour i.e.1000/25 | 13,053 | cum | 39.99 ₹5,21,989.47 | 39.5 ₹5,15,593.5 Lowest | 40 ₹5,22,120 |
| 2.00 | Extra for full Dressing of excavated earth/Silt i/c cost of labour, T&P etc complete for proper completion of work. | 13,053 | cum | 6 ₹78,318 | 6 ₹78,318 | 5.2 ₹67,875.6 Lowest |
| 3.00 | Silt clearance /trench digging i/c lift up to 1.5 m and lead up to 06 m, i/c cost of driver/assistant driver, POL, maintenance of Machine, conrtactor Profit, taxes etc But excluding leveling, dressing and compaction. Extra for slush & lehal for earth work excluding dewatering i/c disposal with in 200M, all cost of labour, Machine t&p etc complete. As per direction of Engineer In-Charge. | 1,040 | cum | 178.9 ₹1,86,056 | 178 ₹1,85,120 Lowest | 179 ₹1,86,160 |
| 4.00 | Scrapping of internal section of existing channel i/c Bed & Slope with silt up to 5cm. As per direction of Engineer In-Charge. | 13,283 | Sqm | 4.5 ₹59,773.5 | 4.45 ₹59,109.35 Lowest | 4.5 ₹59,773.5 |
| 5.00 | Cleaning Thick Bushes & Throny Jungle Without Uprooting with disposal As per direction of Engineer In-Charge. | 66,444 | sqm | 4.39 ₹2,91,689.16 | 4.3 ₹2,85,709.2 Lowest | 4.4 ₹2,92,353.6 |
| 6.00 | Videography/photography of silt clearance work in canal /minor before during and after silt clearance by drone as per Requirement i/c supply of videography/ photography in pen drive and vehicles for movement as per direction E.I. etc comp. | 22.33 | K.M | 1,600.5 ₹35,737.57 Lowest | 1,640 ₹36,619.56 | 1,650 ₹36,842.85 |
| 7.00 | Providing & fixing signboard size 3'x4' with yellow surface, edge & letter color on iron sheet etc complete | 1 | No | 4,220 ₹4,220 | 4,205 ₹4,205 Lowest | 4,228 ₹4,228 |
Tender Value
₹11.8 L
EMD Value
₹24,000
Closing Date
5 Oct 2026, 11:00 amClosed
EE UDEYC, Saharanpur
Office of the EE UDEYC, Saharanpur
Silt Clearance of Internal Section of Randaul Dy. from Km. 0.000 to Km. 22.329 in District Saharanpur
2026_UPIDC_1190937_2
03/EE/UDEYC/2026-27
Open Tender
Civil Works - Canal
Item Rate
25 days
Randaul Dy.
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹24,000
Office of the EE UDEYC, Saharanpur
17 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
5 Oct 2026
29 Sept 2026
30 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt clearance /trench digging i/c lift up to 1.5 m and lead up to 06 m, i/c cost of driver/assistant driver, POL, maintenance of Machine, conrtactor Profit, taxes etc But excluding leveling, dressing and compaction. By Hydrolic excavator /JCB /equivalent Capacity 25 cum/ Hour i.e.1000/25 | 13,053 | cum | - | - |
| 2 | Extra for full Dressing of excavated earth/Silt i/c cost of labour, T&P etc complete for proper completion of work. | - | cum | - | - |
| 3 | Silt clearance /trench digging i/c lift up to 1.5 m and lead up to 06 m, i/c cost of driver/assistant driver, POL, maintenance of Machine, conrtactor Profit, taxes etc But excluding leveling, dressing and compaction. Extra for slush & lehal for earth work excluding dewatering i/c disposal with in 200M, all cost of labour, Machine t&p etc complete. As per direction of Engineer In-Charge. | 1,040 | cum | - | - |
| 4 | Scrapping of internal section of existing channel i/c Bed & Slope with silt up to 5cm. As per direction of Engineer In-Charge. | 13,283 | Sqm | - | - |
| 5 | Cleaning Thick Bushes & Throny Jungle Without Uprooting with disposal As per direction of Engineer In-Charge. | 66,444 | sqm | - | - |
| 6 | Videography/photography of silt clearance work in canal /minor before during and after silt clearance by drone as per Requirement i/c supply of videography/ photography in pen drive and vehicles for movement as per direction E.I. etc comp. | 22.33 | K.M | - | - |
| 7 | Providing & fixing signboard size 3'x4' with yellow surface, edge & letter color on iron sheet etc complete | 1 | No | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.53 MB
03BOOKLATESilt.pdf
Tender Documents • 5.84 MB
BOQ_2245289.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .