Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹56.4 L+₹71,000 (1.28%)Admitted-Fee/PreQual/Technical/Finance PEDDIYANGADI SURATKAL DAKSHINA KANNADA KARNATAKA 575030 | DAKSHINA KANNADA | KARNATAKA | 575030 | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹59.4 L+₹3.8 L (6.74%)Admitted-Fee/PreQual/Technical/Finance 14B ANGEL SOCIETY MANAS R MISHRA OWALE GHODBANDAR ROAD OWALE THANE MAHARASHTRA 400615 | THANE | MAHARASHTRA | 400615 | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | Utkal Ship Under Water Services L3 | Sea Dogs Pvt Ltd L2 | OM SHIV SAI ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00 | Lifting & refixing of anchors with chains connected to the pontoons at Barge Jetty 1&2 including the following:
a) Lifting of 4 nos chain of length 55.00 mtr (Approx.) each and diameter of each link is 51.00 mm fixed with Anchors of 3.5 MT (Approx.) weight, each chains are deeply embedded in river mud which is connected with pontoon.
b) Providing temporary mooring facility to secure, positioning of the pontoons to facilitate uninterrupted dredging operations.
c) After completion of dredging, secure the above pontoons by reinstalling with the help of Chains and Anchors etc., to restart the operation safely.
d)Necessary replacement of links (if required), have to be performed, however, chain will be supplied Departmentally and new D-shackle (if required) will be supplied by the contractor along with MTC, etc. all complete as per direction of EIC. The work include all handling, lifting, transportation, fixing, testing, alignment, adjustments, repositioning and all other incidental works required for satisfactory completion of the work.
e. Supply and installation of 4 nos. M.S. buoy of having length 1800 mm and dia 600 mm with 16 mm dia PVC weir of each buoy.
Note: 1. No extra payment will be made for working under tidal conditions.
2. Dredging work is not included in the subject tender.
3. Necessary equipment, tools & tackles etc. required to complete the entire work has to be supplied by the contractor and no extra payment will be made for this. | 1 | Set | 59,41,000 ₹59,41,000 | 56,37,000 ₹56,37,000 | 55,66,000 ₹55,66,000 Lowest |
Tender Value
₹65 L
EMD Value
₹1.3 L
Closing Date
12 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager (Engineering)
Haldia Dock Complex
ARRANGEMENT FOR RELAYING/PICKUP OF ANCHOR MOORING TO FACILITATE DREDGING OPERATION IN FRONT OF BARGE JETTY 1 and 2, HDC, HALDIA (EPC MODE).
2026_KoPT_930294_1
I and CF/SDM/DOCK/T/1326
Open Tender
Job Works
Works
Haldia
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
Syama Prasad Mookerjee Port, Kolkata, HDC
₹1.3 L
Office of General Manager (Engineering)
13 Nov 2026
16 Oct 2026
13 Nov 2026
16 Oct 2026
12 Nov 2026
16 Oct 2026
27 Oct 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lifting & refixing of anchors with chains connected to the pontoons at Barge Jetty 1&2 including the following:
a) Lifting of 4 nos chain of length 55.00 mtr (Approx.) each and diameter of each link is 51.00 mm fixed with Anchors of 3.5 MT (Approx.) weight, each chains are deeply embedded in river mud which is connected with pontoon.
b) Providing temporary mooring facility to secure, positioning of the pontoons to facilitate uninterrupted dredging operations.
c) After completion of dredging, secure the above pontoons by reinstalling with the help of Chains and Anchors etc., to restart the operation safely.
d)Necessary replacement of links (if required), have to be performed, however, chain will be supplied Departmentally and new D-shackle (if required) will be supplied by the contractor along with MTC, etc. all complete as per direction of EIC. The work include all handling, lifting, transportation, fixing, testing, alignment, adjustments, repositioning and all other incidental works required for satisfactory completion of the work.
e. Supply and installation of 4 nos. M.S. buoy of having length 1800 mm and dia 600 mm with 16 mm dia PVC weir of each buoy.
Note: 1. No extra payment will be made for working under tidal conditions.
2. Dredging work is not included in the subject tender.
3. Necessary equipment, tools & tackles etc. required to complete the entire work has to be supplied by the contractor and no extra payment will be made for this. | 1 | Set | - | - |
stage.html
html • 0.02 MB
finance_977967.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.44 MB
T-1326.pdf
Tender Documents • 2.18 MB
BOQ_977967.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .