Loading…
Loading…
Tender Value
₹7.8 L
EMD Value
₹15,600
Closing Date
17 Jul 2026, 4:30 pm
Executive Engineer PMGSY Division Pulwama
Office of the Executive Engineer PMGSY Division Pulwama
Restoration of L080-Pulwama to Akhal via Mitrigam road ,Package No.JK10-166
2026_KSRRD_148547_12
E-NIT No. 05/ EE/PMGSY-Pulwama/e-tendering of 2026-27, Dated 02/07/2026
Open Tender
Civil Works - Roads
Pulwama
Please refer Tender documents.
10 documents required · 10 mandatory
₹300
Executive Engineer PMGSY Division Pulwama
₹15,600
2 Jul 2026
2 Jul 2026
18 Jul 2026
2 Jul 2026
17 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Extension of Culvert | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:All kinds of soil | - | Cum | 225.21 | - |
| 3 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials from approved source to site of work withe all leads lifts, loading, unloading and Octroi (finished work to be measured) complete job | - | Cum | 5,420.72 | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete | 1 | Sqm | 251.07 | ₹250.82 |
| 5 | CEMENT CONCRETE (CAST-IN-SITU)Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1: 1 1/2:3 (1 cement : 1 1/2 coarse sand : 3 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials from approved source to site of work withe all leads lifts, loading, unloading and Octroi (finished work to be measured) complete job | - | Cum | 6,740.95 | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: columns, piers, abutments, pillarsm posts & struts | - | Sqm | 634.11 | - |
| 7 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses,string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with. 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials from approved source to site of work withe all leads lifts, loading, unloading and Octroi (finished work to be measured) complete job | - | cum | 8,346.6 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms etc | - | Sqm | 629.72 | - |
| 9 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including cost and carriage of all materials from approved source to site of work withe all leads lifts, loading, unloading and Octroi (finished work to be measured) complete job | - | Cum | 8,973.82 | - |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Thermo-Mechanically Treated bars , including cost and carriage of all materials from approved source to site of work withe all leads lifts, loading, unloading (finished work to be measured) complete job | - | kg | 108.02 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.65 MB
BOQ_233097.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid