Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.6 LAccepted-AOC | 1 | Accepted-AOC L-1 | |
| 2 | 2₹17.8 L+₹2.4 L (15.9%)Rejected-Finance H NO 5597 SHIV COLONY GALI NO 9 KAITHAL ROAD KARNAL 132001 | KARNAL | KARNAL | HARYANA | 132001 | 2 | Rejected-Finance L-2 | |
| 3 | 3₹18.3 L+₹2.9 L (18.7%)Rejected-Finance H NO 12386 INDRA VIHAR COLONY NOORWALA BARSAT ROAD PANIPAT | 3 | Rejected-Finance L-3 | |
| 4 | 4₹18.5 L+₹3.1 L (20.4%)Rejected-Finance | 4 | Rejected-Finance L-4 | |
| 5 | 5₹20.1 L+₹4.7 L (30.5%)Rejected-Finance | 5 | Rejected-Finance L-5 |
Tender Value
₹23.0 L
EMD Value
₹46,000
Closing Date
29 Sept 2021, 5:00 pmClosed
Executive Engineer
Executive Engineer, Provincial Division No.2, PWD BR Br., Karnal
Providing and laying 80mm thick interlocking paver block in Sugar Mill Colony Meerut Road Karnal
2021_HRY_187294_1
Providing and laying 80mm thick interlocking paver
Open Tender
Civil Works
Works
90 days
Karnal
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
₹46,000
Yes
18 Jan 2022
9 Sept 2021
30 Sept 2021
9 Sept 2021
29 Sept 2021
9 Sept 2021
Amount
Demolishing dry brick on end edging pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material any lead (HSR 17.75)
Construction of Embankment with Material obtained from Borrow pits Construction of Embankment with approved material obtained from borrow pits, including compensation of earth, with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2, as per technical clause 305 of MORT&H specifications Note:- Compensation for earth w ill vary from place to place and will have to be assessed realistically as per particular ground situation. In case earth is available from Govt. land, compensation for earth will not be required. The position is required to be clearly stated in the cost estimate. (HSDR 17.6)
Construction of granular sub-base by Construction of granular sub-base by providing Material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per technical clause 401 of MORT&H technical specifications (HSR 17.13)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1 :5 :10 ( 1 Cement : 5 coarse sand (zone-Ill) : 10 graded stone aggregate 40 mm nominal size) (HSR 6.1.7 )
Providing and laying 80mm thick factory made cement concrete interlocking paver block of M -35 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over (BIS 15658:2006) and including 60mm thick compacted bed of coarse sand, filling the joints with line sand etc. all complete as per the direction of Engineer-in-charge. [HSR 10.77]
Brick work with common burnt clay modular bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement: 4 coarse sand) (HSR 7.20.1)
Providing and laying of conglomerate floor 40mm thick cement concrete topping 1 :2:4 ( HSR 10.8)
Recovery items:- The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Dismantiling of bricks and Removing of Door and windos in the DNIT. In case it is not possible to use this material on the work, the agency can take away this material after approval from employer. This material will be issued at the price quoted by the agency. However the reserve price is as under:- i) Good Bricks @ 5.00/- Each
ii) Brick Bats @ 450/- cum Note:- All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this building. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
the new aditya cooperative labour and construction society limited karnal
The Kamal Co-OP L N C Society Ltd
The New Karnal Coop Society Ltd
The Karnal East Coop LC Society Ltd
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .