| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.3 LAccepted-AOC | ₹15.3 L Quoted ₹19.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹19.8 LRejected-AOC TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | ₹19.8 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | RAMESH ENGIEERING CONTRACTOR | DURAIMANI ENGINEERING CONTRACTOR |
|---|---|---|---|---|---|
| 1.00 | Draining of Mill gearbox oil completely, cleaning the gearbox internals like worm shaft and worms wheel. After inspection, filling the gearbox with old/new oil including devolution of old oil if ant to stores etc, (Department vehicle will be provided for drawl of oil at free of cost). | 5 | Nos | 60,000 ₹70,800 | 57,500 ₹67,850 |
| 2.00 | Charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples, replacement of worn out parts, reassembling the same as per the direction of engineer-in-charge. | 5 | Mills | 64,000 ₹75,520 | 62,500 ₹73,750 |
| 3.00 | Charges for providing wedges between lower skirt and Mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. Lowering the thrust bearings and reassembling of all the above parts, providing SS shims at the bottom cover flange. Blue matching the worm shaft and worm wheel engagement till we get 20 to 50% pattern by trial method releasing/ providing thin SS shim sheet at the bottom cover flange and to get proper running clearance and centering of engagement. | 5 | Nos | 1,62,500 ₹1.9 L | 1,61,000 ₹1.9 L |
| 4.00 | Charges for dismantling and removing worn out thrust bearing of Mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft and assembling back new thrust bearing after heating the racer in oil bath. | 2 | Nos | 39,000 ₹46,020 | 38,800 ₹45,784 |
| 5.00 | Charges for Renewal of thrust bearing adopter by oil heating and using necessary fixture for assembling the adopter in correct position after positioning the shims below the worm gear hub lock nut. Removing the thrust bearing adopter (worn out) and assembling the new adopter by heating. | 2 | Nos | 29,200 ₹34,456 | 29,000 ₹34,220 |
| 6.00 | Charges for Dismantling of upper skirt assembly, lower skirt assembly, Mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of Mill bottom cover, upper bearing housing cover, oil seals etc., Complete overhauling, assembling back the lower skirt assembly, scrapper assembly and arresting the oil leakages in the return line and also spillage’s at the rear side of gearbox to prevent Mill fire including cleaning and tapping the threaded holes. | 3 | Nos | 1,03,500 ₹1.2 L | 1,03,200 ₹1.2 L |
| 7.00 | Charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc. | 4 | Nos | 1,56,000 ₹1.8 L | 1,54,000 ₹1.8 L |
| 8.00 | Charges for checking the bearing clearance after dismantling the thrust bearing and radial bearing housing covers, removing the bushes, springs etc. thoroughly cleaning the bearing housings and other components inspecting the thrust bearings, resetting the axial clearance by reducing the thickness of shims in the thrust bearing housing cover, providing of new shims and by trial method adjusting the clearance to 0.10 mm to 0.15 mm. Assembling back the thrust and radial bearing housing properly and renewing the gland studs and gland packing in the worm shaft assembly. | 4 | Nos | 2,12,000 ₹2.5 L | 2,10,000 ₹2.5 L |
| 9.00 | Charges for changing the worm shaft thrust bearing after gas heating and releasing the old bearings from the worm shaft, heating the new bearing in oil bath and providing the new bearing in the worm shaft in proper position. | 2 | Nos | 59,800 ₹70,564 | 58,000 ₹68,440 |
| 10.00 | Charges for renewing radial bearing in the worm shaft after gas heating and releasing the old bearing and providing new bearing in the worm shaft after heating the bearing in oil bath. | 2 | Nos | 25,400 ₹29,972 | 25,300 ₹29,854 |
Tender Value
Refer Docs
EMD Value
₹13,600
Closing Date
30 Dec 2025, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle MPM I Unit II Overhauling of Mill gear box, under bowl, Separator Top assembly etc., of Mills during the forthcoming overhaul
2025_EB_632317_1
CE/SE/O/TTPS/Spec.No.259/25-26
Open Tender
Miscellaneous Works
25 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹13,600
Yes
25 Mar 2026
15 Dec 2025
31 Dec 2025
15 Dec 2025
30 Dec 2025
15 Dec 2025
Draining of Mill gearbox oil completely, cleaning the gearbox internals like worm shaft and worms wheel. After inspection, filling the gearbox with old/new oil including devolution of old oil if ant to stores etc, (Department vehicle will be provided for drawl of oil at free of cost).
Charges for dismantling of lube oil cooler, from lube oil system, cleaning, flushing the cooler, oil pipe lines, water pipe lines, oil separator tank, checking of water lines, valves and nipples, replacement of worn out parts, reassembling the same as per the direction of engineer-in-charge.
Charges for providing wedges between lower skirt and Mill insulation cover plate firmly, removal of gearbox bottom cover flange bolts, lowering the thrust bearing and pump housing after supporting lower radial bearing housing. Lowering the thrust bearings and reassembling of all the above parts, providing SS shims at the bottom cover flange. Blue matching the worm shaft and worm wheel engagement till we get 20 to 50% pattern by trial method releasing/ providing thin SS shim sheet at the bottom cover flange and to get proper running clearance and centering of engagement.
Charges for dismantling and removing worn out thrust bearing of Mill vertical shaft by gas heating the racer, cleaning the bearing seating area in the vertical shaft and assembling back new thrust bearing after heating the racer in oil bath.
Charges for Renewal of thrust bearing adopter by oil heating and using necessary fixture for assembling the adopter in correct position after positioning the shims below the worm gear hub lock nut. Removing the thrust bearing adopter (worn out) and assembling the new adopter by heating.
Charges for Dismantling of upper skirt assembly, lower skirt assembly, Mechanical face seal assembly, dust guard and blue matching of seal runner, renewal of seal( bronze), air seal, dismantling of Mill bottom cover, upper bearing housing cover, oil seals etc., Complete overhauling, assembling back the lower skirt assembly, scrapper assembly and arresting the oil leakages in the return line and also spillage’s at the rear side of gearbox to prevent Mill fire including cleaning and tapping the threaded holes.
Charges for dismantling the gear coupling bolts, gear coupling (worm shaft only), distance piece, unscrewing the worm shaft extension cover bolts and bearing housing cover bolts, removing the worm shaft extension cover, lowering to ground floor, releasing the worm shaft assembly from its position and assemblies providing back the overhauled worm shaft assembly in the gear box and fitting back the worm shaft extension cover, bolting and tightening the bolts to the required torque level and assembling back the gear coupling bolts, distance piece etc.
Charges for checking the bearing clearance after dismantling the thrust bearing and radial bearing housing covers, removing the bushes, springs etc. thoroughly cleaning the bearing housings and other components inspecting the thrust bearings, resetting the axial clearance by reducing the thickness of shims in the thrust bearing housing cover, providing of new shims and by trial method adjusting the clearance to 0.10 mm to 0.15 mm. Assembling back the thrust and radial bearing housing properly and renewing the gland studs and gland packing in the worm shaft assembly.
Charges for changing the worm shaft thrust bearing after gas heating and releasing the old bearings from the worm shaft, heating the new bearing in oil bath and providing the new bearing in the worm shaft in proper position.
Charges for renewing radial bearing in the worm shaft after gas heating and releasing the old bearing and providing new bearing in the worm shaft after heating the bearing in oil bath.
Charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing and reassembling the new radial bearing in the new/old radial bearing housing and assembling the new/old pump hub and bushing.
Charges for changing worn out scraper pin, bush, pin cover, re conditioning of scrapper, cleaning of under bowl, checking of clearance, inspection and welding of wheels support lugs, wall side liners etc in mill under bowl.
Dismantling of worn out classifier assembly, inspection of deflector blade, cleaning, replacing of worn out deflector blade components renewal and assembling of new classifier assembly with its links. The overhauled classifier assembly was checked from 0 to 6 positions and ensured that the deflector blades, links move correspondingly to its position without any malfunction.
Charges for dismantling the Spool pieces, multiple port outlet bodies and transition pipes 4 Nos. each after assembling the coal pipe inspection with center feed pipe structures including transportation of supporting material from stores to site and refixing the Spool piece, MPO bodies and transition pieces and assembling to its original position and carrying out necessary related works. And devolution of scraps to stores etc. for a mill.
Charges for removal of orifice 1 No. after dismantling the victaulic coupling, inspecting and inverting the same orifice or new orifice and assembling in position.
Dismantling the mill top, cutting the centre feed pipe to the required length so as to lift eroded inner cone and brought it to 4.5 Mt. level as per the direction of Engineer in charge.
Charges for dismantling the eroded inner cone from mill top and assembling the new / reconditioned inner cone.
Charges for dismantling the drum section of inner cone from mill top and replacing the new/ reconditioned one.
Charges for dismantling venturi outlet assembly from mill top with the removal of venturi outlet, venturi vanes, venturi outlet conical collar assembly, coal feed pipe and devolution of scrap to stores
Charges for fixing of new venturi vane and assembling the venturi outlet assembly, venturi outlet conical collar assembly with coal feed pipe and the mill top
Material On Contractor Scope: 18L Collar (Material:Mild Steel)
Material On Contractor Scope: 18L Victaulic coupling silicon rubber gasket
Material On Contractor Scope: Full Threaded Hexagonal Head HT Bolt & Nut With Plain Washer. Size: M 24 x 90 mm Property class 10.9 as per IS:1367
Material On Contractor Scope: Full Threaded Hexagonal Head HT Bolt & Nut With Plain Washer Size: M 24 x 120mm Property class 10.9 as per IS:1367
Material On Contractor Scope: Full Threaded Hexagonal Head HT Bolt & Nut With Plain Washer. Size: M 24 x 70mm Property class 10.9 as per IS:1367
Material On Contractor Scope: MS bolt and nut with 2nos flat round washer IS 2062 Gr. 4.6 Size: M 20 x 120mm
Material On Contractor Scope: MS bolt and nut with 2nos flat round washer IS 2062 Gr. 4.6 Size: M 16 x 60mm
Material On Contractor Scope: M 16mm MS Hexagonal Nut Gr. 8.8
Material On Contractor Scope: Allen Cap screw M16 x 60mm
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_756515.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid