| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.5 LAccepted-AOC HOLDING NO 14 N WARD NO 13 LINK PARK MAIN GATE DURGAPUR PASCHIM BARDHAMAN PASCHIM WEST BURDWAN BARDHAMAN 713203 WEST BENGAL INDIA | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713203 | ₹7.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹7.7 L+₹15,012.25 (2.00%)Rejected-Finance VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | ₹7.7 L+₹15,012.25 (2.00%) | 2 | Rejected-Finance L2 |
| 3 | 3₹8.0 L+₹45,637.21 (6.08%)Rejected-Finance | ₹8.0 L+₹45,637.21 (6.08%) | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | F.R. ENTERPRISE L2 | RINA ENTERPRISE L3 | PORI ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00Part A: Installation of Driven Drum (19XD Belt, R-VII Seam) | ||||||
| 1.01 | Transportation of one nos. driven drum, DA and Oxygen cylinder from surface to 19XD belt drive head at 19XD/38L(R-VII) by haulage and about 30 mtrs. manually. | 1 | AU | 17,556.95 ₹17,556.95 | 18,259.23 ₹18,259.23 | 17,212.7 ₹17,212.7 Lowest |
| 1.02 | Taking apart of two nos. block-bearings(SD3134/23134kk) from a drum at -1D/76L(R-VII). | 1 | AU | 7,155.71 ₹7,155.71 | 7,441.94 ₹7,441.94 | 7,015.4 ₹7,015.4 Lowest |
| 1.03 | Transportation of healthy two nos. block-bearings(SD3134/23134k) from -1D/76L(R-VII) to 19XD belt drive head at 19XD/38L(R-VII) manually. | 1 | AU | 7,022.78 ₹7,022.78 | 7,303.69 ₹7,303.69 | 6,885.08 ₹6,885.08 Lowest |
| 1.04 | Loosening of 19XD belt conveyor; removal of out of order drum; fitting of healthy block-bearings on transported drum; greasing of block-bearings; fitting on new drum, fitting-alignment of driven drum with its base frame; tensioning of the 19XD belt & trial run. | 1 | AU | 38,978.4 ₹38,978.4 | 40,537.54 ₹40,537.54 | 38,214.12 ₹38,214.12 Lowest |
| 1.05 | Transport of replaced drum to surface after manual transport of 30 mtrs and then by haulage. | 1 | AU | 17,556.95 ₹17,556.95 | 18,259.23 ₹18,259.23 | 17,212.7 ₹17,212.7 Lowest |
| 2.00Part B: Installation of Discharge Drum (19XD Tandem Belt, R-VII Seam) | ||||||
| 2.01 | Transportation of one no. drum fitted with block-bearings(SNA528/22228k) from surface, DA and Oxygen cylinder to 19XD Tandem belt discharge end at 19XD/45L(R-VII). | 1 | AU | 17,556.95 ₹17,556.95 | 18,259.23 ₹18,259.23 | 17,212.7 ₹17,212.7 Lowest |
| 2.02 | Loosening of 19XD Tandem belt conveyor; old drum dismantled with help of gas cutting if required; greasing of block-bearings; fitting-alignment of discharge drum; tensioning of the 19XD Tandem belt & trial run. | 1 | AU | 19,489.34 ₹19,489.34 | 20,268.92 ₹20,268.92 | 19,107.2 ₹19,107.2 Lowest |
| 2.03 | Transport of replaced drum to surface after manual transport of 30 mtrs and then by haulage. | 1 | AU | 21,068.2 ₹21,068.2 | 21,910.93 ₹21,910.93 | 20,655.1 ₹20,655.1 Lowest |
Tender Value
₹7.5 L
EMD Value
₹9,400
Closing Date
20 Mar 2026, 11:00 amClosed
Area Engineer EnM
Office of the General Manager, Jhanjra Area
Installation of drive, driven, tail end, discharge drums at six nos. running belt conveyor of LHCM2 section at RVII seam at 3n4 Incline, J.P.Colly
2026_ECL_356099_1
ECL/GM/JNR/EnM/A2/25-26/136 dated 07.03.2026
Open Tender
Miscellaneous Works
Item Rate
15 days
JHANJRA UG
Please refer Tender documents.
4 documents required · 4 mandatory
₹9,400
30 May 2026
9 Mar 2026
21 Mar 2026
9 Mar 2026
20 Mar 2026
10 Mar 2026
9 Mar 2026 - 16 Mar 2026
Part A: Installation of Driven Drum (19XD Belt, R-VII Seam)
Transportation of one nos. driven drum, DA and Oxygen cylinder from surface to 19XD belt drive head at 19XD/38L(R-VII) by haulage and about 30 mtrs. manually.
Taking apart of two nos. block-bearings(SD3134/23134kk) from a drum at -1D/76L(R-VII).
Transportation of healthy two nos. block-bearings(SD3134/23134k) from -1D/76L(R-VII) to 19XD belt drive head at 19XD/38L(R-VII) manually.
Loosening of 19XD belt conveyor; removal of out of order drum; fitting of healthy block-bearings on transported drum; greasing of block-bearings; fitting on new drum, fitting-alignment of driven drum with its base frame; tensioning of the 19XD belt & trial run.
Transport of replaced drum to surface after manual transport of 30 mtrs and then by haulage.
Part B: Installation of Discharge Drum (19XD Tandem Belt, R-VII Seam)
Transportation of one no. drum fitted with block-bearings(SNA528/22228k) from surface, DA and Oxygen cylinder to 19XD Tandem belt discharge end at 19XD/45L(R-VII).
Loosening of 19XD Tandem belt conveyor; old drum dismantled with help of gas cutting if required; greasing of block-bearings; fitting-alignment of discharge drum; tensioning of the 19XD Tandem belt & trial run.
Transport of replaced drum to surface after manual transport of 30 mtrs and then by haulage.
Part C: Installation of Drive Drum (65L Belt, R-VII Seam)
Transportation of one nos. drive drum, DA and Oxygen cylinder from surface to 65L belt drive head at 20XD/65L(R-VII) manually.
Taking apart of two nos. block-bearings(SN520/22220k) from a drum at 11XD/73L(R-VIIIA).
Transportation of healthy two nos. block-bearings(SN520/22220k) from dismantled site at RVIIIA seam to 65L belt drive head at 20XD/65L(R-VII) manually.
Loosening of 65L belt conveyor; removal of out of order drum; fitting of healthy block-bearings on transported drum; greasing of block-bearings; removal of gear coupling from old drum and fitting on new drum, fitting-alignment of drive drum with its base frame; tensioning of the 65L belt & trial run.
Transport of replaced drum to surface by haulage.
Part D: Installation of Tail End Drum (-8D Belt, R-VII Seam)
Transportation of one no. drum, DA & oxygen cylinder from surface to -8D belt tail end at -8D/74AL(R-VII) by haulage and about 60 mtrs. manually.
Taking apart of two nos. block-(SNA532) from a drum at 14XD/48L(R-VIIIA).
Transportation of healthy two nos. bearings(22232k) from surface and two nos healthy blocks(SN532) from 14XD/48L(R-VIIIA) to -8D belt tail end at -8D/74AL(R-VII).
Loosening of -8D belt conveyor; old drum dismantled with help of gas cutting if required; fitting of healthy block-bearings; greasing of block-bearings; fitting-alignment of tail end drum with its base frame; tensioning of the -8D belt & trial run.
Transport of replaced drum to surface after manual transport of 60 mtrs and then by haulage
Part E : Installation of one no. Driven drum of 74AL belt, R-VII seam.
Transportation of driven drum to 74AL belt drive head at -7D/74AL(R-VII).
Taking apart block-bearings (SD3134/23134k) from drum at 16XD/72L(R-VIIIA).
Manual transport of bearings and equipment to the drive head using an arm puller.
Removal of old drum, fitting new drum/bearings, alignment, tensioning, and trial run.
Transport of replaced drum to surface after 60m manual transport and haulage.
Part F : Installation of one no. tail drum of 74AL belt, R-VII seam.
Transportation of drum and cylinders to 74AL tail end at -5R/72L(R-VII).
Taking apart block-(SNA532) from drum at 14XD/48L(R-VIIIA).
Manual transport of healthy bearings (22232k) and blocks (SN532) to 74AL tail end.
Dismantling old drum (gas cutting if required), fitting bearings, alignment, and trial run.
Transport of replaced drum to surface after 60m manual transport and haulage.
Part G : Installation of one no. driven drum of 72L belt, R-VII seam.
Transportation of driven drum to 72L belt drive head at -4D/72L(R-VII).
Taking apart block-bearings (SD3134/23134k) from drum at 11D/77L(R-VIIIA).
Manual transport of bearings and equipment to the drive head using an arm puller.
Replacement of drum, fitting healthy bearings, alignment, and trial run.
Transport of replaced drum to surface after 60m manual transport and haulage.
Part H : Installation of one no. driven drum of 72L belt, R-VII seam.
Transportation of drum and cylinders to 72L belt tail end at 9D/72L(R-VII).
Taking apart block-(SNA532) from drum at 11D/71L(R-VIIIA).
Manual transport of healthy bearings (22232k) and blocks (SN532) to 72L tail drum.
Loosening conveyor; dismantling old drum (gas cutting if needed); fitting/greasing bearings, alignment, tensioning, and trial run.
Transport of replaced drum to surface via manual transport (60m) and haulage.
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.49 MB
Tendernotice_2.pdf
PDF • 1.20 MB
BOQ_368952.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .