Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance | -21.65% | ₹2.7 L | L1 | Admitted-Finance |
| 2 | L2₹2.9 LAdmitted-Finance | -16.23% | ₹2.9 L | L2 | Admitted-Finance |
| 3 | L3₹3.0 LAdmitted-Finance | -15.00% | ₹3.0 L | L3 | Admitted-Finance |
Tender Value
₹3.5 L
EMD Value
₹7,000
Closing Date
30 Mar 2026, 1:00 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_306658_10
e-NIT 277 of REW Poonch 2025-26 Date 24-03-2026
Open Tender
Civil Works
30 days
Poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer REW Division Poonch
₹7,000
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
30 Mar 2026
24 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing and Laying stone duly Hnad Packed including Consolidation complete | |||||
| 2Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | |||||
| 3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) | |||||
| 4Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | |||||
| 5Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6graded stone aggregate 20 mm nominal size) with 30% stones | |||||
| 6Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | |||||
| 7 | Carriage of sand /Agg. by 15 KM by MT | 0.2 | cum | - | - |
| 8Carriage of stone by 10 KM by MT | |||||
| 9Add the Cost of CIB | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_995658.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid