Tender Value
₹1.4 L
EMD Value
₹4,320
Closing Date
28 Jul 2026, 3:00 pm2d left
Executive Eng REW Kupwara
Executive Eng REW Kupwara
Construction of washroom near masjid shareef muqam near ziyarat ward 06 at trehgam
2026_RDPR_315879_18
NIT NO 52 OF 2026-27 ADF TREHGAM
Open Tender
Civil Works
Percentage
Executive Eng REW Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Eng REW Kupwara
₹4,320
14 Jul 2026
14 Jul 2026
29 Jul 2026
14 Jul 2026
28 Jul 2026
14 Jul 2026
14 Jul 2026 - 14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 M from edge of cutting. | 6.74 | Cum | 479.3 | ₹3,230.48 |
| 2 | Providing and laying of stone soiling (hand packed )including dressing ramming ,watering and all leads lifts and carriage upto site of work complete (including dewatering if any) | 1.67 | Cum | 1,000 | ₹1,670 |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with 1:3:6mix (1 Cement :3 coarse sand : 6graded stone aggregate 20mm nominal size) crushed stone aggregates including dewatering if any and head load | 2.71 | Cum | 5,673.4 | ₹15,374.91 |
| 4 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in
foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 5.69 | Cum | 7,571.55 | ₹43,082.12 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete (1:1.5:3) including curing but excluding the cost of centering, shuttering, finishing and reinforcement. | 1.12 | Cum | 7,788.4 | ₹8,723.01 |
| 6 | Steel reinforcement for R.C.C. work including straightening,cutting, bending, placing in position and binding all complete upto plinth level Mild steel and medium tensile steel bars | 108.58 | kg | 115.35 | ₹12,524.7 |
| 7 | Centering and Shuttering etc and removal of formwork for suspended floors | 4.67 | SqMtr | 573.6 | ₹2,678.71 |
| 8 | Centering and Shuttering etc and removal of formwork for walls | 9.75 | SqMtr | 286.35 | ₹2,791.91 |
| 9 | 12mm thick plaster in 1;4 mix | 26.15 | SqMtr | 283.8 | ₹7,421.37 |
| 10 | Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados over 12 mm thick bed of cement mortar 1:3 ( 1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3 kg per sqm, including pointing in white cement mixed with pigment of matching shade complete | 6.5 | SqMtr | 1,229.1 | ₹7,989.15 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_1026751.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].