| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAccepted-Finance | L1 | Accepted-Finance Lowest Rate | |
| 2 | L2₹12.7 L+₹1,903.64 (0.15%)Rejected-Finance VILLAGE TILMAPUR POST UCHAGAON DISTRICT AZAMGARH UTTAR PRADESH 276001 | AZAMGARH | AZAMGARH | UTTAR PRADESH | 276001 | L2 | Rejected-Finance Above to Lowest Rate | |
| 3 | L3₹12.7 L+₹2,918.92 (0.23%)Rejected-Finance 142 | L3 | Rejected-Finance Above to Lowest Rate |
Tender Value
₹12.7 L
EMD Value
₹1.3 L
Closing Date
8 Jun 2026, 6:00 pmClosed
Executive Officer
NPP MAU
Ward No 7 Pardahan me Lok Adalat Ke Paas Interlocking, Septic Tank aur Pipe ka Karya
2026_DOLBU_1152137_1
74-01
Open Tender
Civil Works
Percentage
60 days
Mau
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,560
Executive Officer
₹1.3 L
19 Jun 2026
23 May 2026
9 Jun 2026
23 May 2026
8 Jun 2026
23 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Clerance including labour and matrials and including grass cutting/Dressing and carrage of matrials by Head load | 1 | JOB | 5,000 | ₹5,000 |
| 2 | E/W filling in embankment with cartage soil up to 8.00 km distances etc com. | 202.34 | CUM | 301 | ₹60,904.34 |
| 3 | Dismenteling of Brick Work including Stacking of materials as directed by the Engineer-in-Charge with the distance of 60.00m. Work S1 No. 692 | 1.17 | CUM | 435 | ₹508.95 |
| 4 | E/W in Excavation in ordenery soil in foudation including labour and matrials and T/P with all com. Work SI No. 251 | 47.88 | CUM | 115 | ₹5,506.2 |
| 5 | C.C. Work in 1:6:12 in cement, fine sand and 40 mm Gauge Brick Ballast including labour and matrials, T/P with all com. Work Sl No. 273 | 4.23 | CUM | 3,250 | ₹13,747.5 |
| 6 | M-150 B/W in 1:4 in cement and coar sand mortar including labour and matrials, T/P with all com. Work S1 No.305 | 13.44 | Cum | 4,980 | ₹66,921.24 |
| 7 | 12mm thick Plaster work in 1:3 in cement and fine sand mortar including labour and matrials, T/P with all com. Work S1 No.583 | 38.4 | Sqm | 189 | ₹7,257.6 |
| 8 | R.C.C. Work in 1:1.5:3 in cement coarse sand and 20mm gauge including labour and matrials, T/P with all com. Work Sl No.285 | 1.92 | Cum | 9,430 | ₹18,105.6 |
| 9 | MS work in R.C.C. work including labour and matrials, T/P with all com. Work St No.504 | 1.51 | Qtl | 5,650 | ₹8,531.5 |
| 10 | Construction of Granular sub base (GSB) by providing coarse graded material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place. method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Clause 401 | 86.25 | CUM | 3,492.6 | ₹3,01,236.75 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
tech74.pdf
Tender Documents • 1.77 MB
BOQ_2158279.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .