Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹67.1 LAccepted-AOC HOUSE NO 3000 SECTOR 15 HOUSING BOARD COLONY SONIPAT 131001 | SONIPAT | SONIPAT | HARYANA | 131001 | L-1 | Accepted-AOC Ok | |
| 2 | L-2₹71.3 L+₹2.2 L (3.13%)Rejected-AOC 28 29 GALI NO 05 MAHABIR PARK 124507 | BAHADURGARH | JHAJJAR | HARYANA | 124507 | L-2 | Rejected-AOC Ok | |
| 3 | Not Admitted-Fee/PreQual/Technical 161 VPO RAJLU GARHI GANAUR 131101 | SONIPAT | HARYANA | 131101 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Jaiveer Singh Contractor L1 | Suresh Kumar L2 |
|---|---|---|---|---|---|
| 1.00 | Operation and Maintenance of Water Supply Scheme Chimni Tehsil and District Jhajjar including Water Works at Chimni Tubewells, Installed pumping machinery, electric installation, street light, chlorination system and disinfectant arrangement and all other installation including existing Distribution system and Rising Main for 36 months from the date of commencement including repair of civil structures (For the year 2024-25). For the 1st year (SDE No.2 Beri). | 12 | Months | 1,92,000 ₹23,04,000 Lowest | 1,98,000 ₹23,76,000 |
| 2.00 | Operation and Maintenance of Water Supply Scheme Chimni Tehsil and District Jhajjar including Water Works at Chimni Tubewells, Installed pumping machinery, electric installation, street light, chlorination system and disinfectant arrangement and all other installation including existing Distribution system and Rising Main for 36 months from the date of commencement including repair of civil structures (For the year 2024-25). For the 2nd year (SDE No.2 Beri). | 12 | Months | 1,92,000 ₹23,04,000 Lowest | 1,98,000 ₹23,76,000 |
| 3.00 | Operation and Maintenance of Water Supply Scheme Chimni Tehsil and District Jhajjar including Water Works at Chimni Tubewells, Installed pumping machinery, electric installation, street light, chlorination system and disinfectant arrangement and all other installation including existing Distribution system and Rising Main for 36 months from the date of commencement including repair of civil structures (For the year 2024-25). For the 3rd year (SDE No.2 Beri). | 12 | Months | 1,92,000 ₹23,04,000 Lowest | 1,98,000 ₹23,76,000 |
Tender Value
₹61.7 L
EMD Value
₹1.2 L
Closing Date
13 Aug 2025, 5:00 pmClosed
RAJESH KUMAR KAUSHIK
Jhajjar PHED No. 1
Operation and Maintenance of Water Supply Scheme Chimni Tehsil and District Jhajjar including Water Works at Chimni Tubewells, Installation pumping machinery, electric installation, street light, chlorination system and all other installation includ
2025_HRY_463518_1
2025AD620450 D865 4735 8075 82E5716D0686590PUH
Open Tender
Civil Works
Works
1095 days
CHIMNI
2 documents required · 2 mandatory
₹5,000
Yes
₹1.2 L
Yes
26 Sept 2025
6 Aug 2025
13 Aug 2025
6 Aug 2025
13 Aug 2025
6 Aug 2025
Amount
Operation and Maintenance of Water Supply Scheme Chimni Tehsil and District Jhajjar including Water Works at Chimni Tubewells, Installed pumping machinery, electric installation, street light, chlorination system and disinfectant arrangement and all other installation including existing Distribution system and Rising Main for 36 months from the date of commencement including repair of civil structures (For the year 2024-25). For the 1st year (SDE No.2 Beri).
Operation and Maintenance of Water Supply Scheme Chimni Tehsil and District Jhajjar including Water Works at Chimni Tubewells, Installed pumping machinery, electric installation, street light, chlorination system and disinfectant arrangement and all other installation including existing Distribution system and Rising Main for 36 months from the date of commencement including repair of civil structures (For the year 2024-25). For the 2nd year (SDE No.2 Beri).
Operation and Maintenance of Water Supply Scheme Chimni Tehsil and District Jhajjar including Water Works at Chimni Tubewells, Installed pumping machinery, electric installation, street light, chlorination system and disinfectant arrangement and all other installation including existing Distribution system and Rising Main for 36 months from the date of commencement including repair of civil structures (For the year 2024-25). For the 3rd year (SDE No.2 Beri).
Suresh Kumar (BID ID -1315893)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .