Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical AT SIARIA PO TALABARKOTE P SADAR DIST DHENKANAL | DHENKANAL | DHENKANAL | ODISHA | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹2.2 Cr
EMD Value
₹2.2 L
Closing Date
25 May 2026, 5:30 pmClosed
DEO cum DPC, Dhenkanal
DEO cum DPC, Dhenkanal
Construction of 50 seated Residential Hostel Building at Bapuji HS, Gadapalasuni in Kankadahad Block of Dhenkanal District for the year 2024-25
2026_OPEPA_129053_1
SSA/DKL/03/2025-26
Open Tender
Civil Works - Buildings
Percentage
270 days
Dhenkanal
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹2.2 L
Yes
24 Sept 2026
9 May 2026
26 May 2026
9 May 2026
25 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | FOUNDATION & PLINTH-:Earth work excavation of foundation in hard soil rough dressing & levelling bed & depositing the excavated earth away from work site withen 50 M initial lead and 1.5 M initial lift with cost of labour, T.& P. etc. required for the work complete as per the specification and direction of the EIC | - | Cum | 276.89 | - |
| 2 | Filling foundation & plinth with filling sand well watered & rammed including cost, conveyance, royality & taxes etc. of all materials required for the work, labour charges etc. complete as per the specification & direction of EIC | 1 | Cum | 1,151.18 | ₹1,150.03 |
| 3 | Providing & laying Cement Concrete ( 1:3:6 ) using 40mm crusher broken granite metal including cost, conveyance, royality & taxes etc. of all materials, mixing & laying concrete, watering & curing, labour charges etc. complete | - | Cum | 6,967.39 | - |
| 4 | RCC M-20 grade with crushed granite coarse aggregate of size 20 mm downgraded mixed in mixing plant with vibrator including cost of all materials, machineries & labour including cost, conveyance, labour, all taxes & royality etc complete including centring & shuttering as per direction of E.I.C. | - | - | - | - |
| 5 | A) Column Base & Footings | 0.4 | cum | 7,766.6 | ₹3,106.64 |
| 6 | B) Column up to plinth | 1 | cum | 7,766.6 | ₹7,758.83 |
| 7 | C) Plinth Beam | 1 | cum | 8,648.35 | ₹8,639.7 |
| 8 | Supplying, providing and straightening the coiled or bent up M.S. / HYSD bars, cutting, bending and tying grills and placing in position with ties, spacers and binding the grills in binding wire 18 to 20 mm. gauge for R.C.C. works as per approved design and drawings with all leads, lifts and delifts and all cost, carriage, taxes of the reinfocement bars and binding wire and labour charges etc. complete as per the specification & direction of Engineer in charge. | 1 | qntl. | 8,557.48 | ₹8,548.92 |
| 9 | (i)Flyash Brick Masonry in Cement mortar (1:6) in F&P including cost, conveyance, royality & taxes etc. of all materials, mixing & laying, watering, curing, labour charges etc. complete as per the specification & direction of Engineer in charge. | - | Cum | 5,969.07 | - |
| 10 | (ii) 125 mm thick wall with CM(1:4) | 1 | Cum | 5,722.23 | ₹5,716.51 |
stage.html
html • 0.16 MB
cancelled_1.pdf
pdf • 0.16 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
Tendernotice_2.pdf
PDF • 1.38 MB
BOQ_590389.xls
BOQ • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .