| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.3 LAccepted-AOC VASANTASAKHA PLAZA NEAR NAVLE BRIDGE NEXT TO DANGAT CERAMIC HOUSE NARHE PUNE 411 041 | PUNE | MAHARASHTRA | 411041 | ₹22.3 L | L1 | Accepted-AOC Accepted being L1. |
| 2 | L2₹23.1 L+₹82,183.17 (3.68%)Rejected-AOC A 76 SURENDRA NAGAR ISMAILGANJ FAIZABAD ROAD LUCKNOW UTTAR PRADESH 226016 UDYAM UP 50 0018139 | LUCKNOW | UTTAR PRADESH | 226016 | ₹23.1 L+₹82,183.17 (3.68%) | L2 | Rejected-AOC Rejected. Not L1 |
| Sl No | Description | Qty | Unit | SUN POWER CONVERSION PVT LTD L2 | Virtus Techno L1 |
|---|---|---|---|---|---|
| 1.00 | Supply , Installation , Testing and commissioning of 60 KVA capacity online UPS 3 phase input / 3 phase output side with double conversion PWM IGBT technology to drive constant current regulators & suitable for 100% unbalanced load at various load inclluding full load condition as per technical specifications. The UPS shall have built in isolation transformer at input side , automatic static by pass, active input powerfactor correction, phase sequence corrector, pure sine wave output, input - output isolation , compatibility with generator supply , cold start capability , EMI/RFI noise filter , advanced communication port and user friendly LCD display with necessary safety protections , THDi<=5% including transportation , loading unloading etc complete as required. | 1 | Job | 6,90,000 ₹6,90,000 | 5,25,375 ₹5,25,375 Lowest |
| 2.00 | Supply Installation and testing and commissioning of SMF battery C20 rated for minimum 30 min backup at 60kVA unit pf (Batter bank shall be of 57600 VAH -12V 150 Ah x 32 nos). The job also includes supply and fixing of suitable MS battery rack along with interconnection cables for batteries , suitable capacity power cable interconnections between UPS and Battery Rack etc complete as required.
(Note: The battery shall be having 3 yrs OEM Warranty) | 1 | Job | 6,00,000 ₹6,00,000 Lowest | 6,98,227.5 ₹6,98,227.5 |
| 3.00 | Supply, installation, testing, and commissioning of a factory-fabricated 8-way Sub-Main Distribution Board (SMDB) of 250A rating, suitable for 415V, 3-phase, 4-wire system, with short circuit withstand capacity of 36kA for 1 second, IP43 protection, and aluminum busbar system. The panel shall be equipped with 1 No. 160A 3P MCCB as incomer and 8 Nos. 3P MCCBs as outgoing feeders (40A - 03 Nos,63A - 03 Nos, 100A - 02 Nos), enclosed in CRCA steel powder-coated cabinet with Metering Box on Top and bottom cable entry provisions, earth and neutral bars, internal wiring, phase indication lamps, identification labels, and shall be suitable for wall mounting. The SMDB shall conform to IEC 61439-2 / IS 8623 standards and shall be supplied complete with all necessary accessories, cable terminations, earthing connections, transportation, loading and unloading, installation, testing, and commissioning as required. | 1 | Job | 1,75,000 ₹1,75,000 Lowest | 2,12,500 ₹2,12,500 |
| 4.00 | Earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 meter long etc. with charcoal/ coke and salt as required | 2 | Set | 30,000 ₹60,000 | 23,625 ₹47,250 Lowest |
| 5.00All Inclusive Comprehensive maintenance contract of 60kVA UPS, Battery and all electrical equipments installed under this contract including supply and replacement of spares , carrying preventive maintenance once in 03 months as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract on expiry of the Defects Liability Period of 2 Years (1 Job / annum = CMC of 1 UPS for 1 year) Note: The replacement of battery is excluded from scope of CMC after completion of warrenty period of battery | |||||
| 5.01 | First Year after DLP of Two Years | 1 | Job/ Annum | 1,29,000 ₹1,29,000 | 1,22,360.25 ₹1,22,360.25 Lowest |
| 5.02 | Second Year after DLP of Two Years | 1 | Job/ Annum | 1,41,900 ₹1,41,900 | 1,34,596.28 ₹1,34,596.28 Lowest |
| 5.03 | Third Year after DLP of Two Years | 1 | Job/ Annum | 1,56,090 ₹1,56,090 | 1,48,055.9 ₹1,48,055.9 Lowest |
| 5.04 | Fourth Year after DLP of Two Years | 1 | Job/ Annum | 1,71,699 ₹1,71,699 | 1,62,861.49 ₹1,62,861.49 Lowest |
| 5.05 | Fifth Year after DLP of Two Years | 1 | Job/ Annum | 1,88,856 ₹1,88,856 | 1,79,135.41 ₹1,79,135.41 Lowest |
Tender Value
₹15.6 L
EMD Value
₹46,846
Closing Date
14 Aug 2025, 5:00 pmClosed
Senior Manager (Engg-Elect.), Agatti Airport
Senior Manager Engg (Elect), AAI, Agatti Airport, Agatti Island - 682553
SITC of 60kVA UPS for Aeronautical Ground Lighting System at Agatti Airport
2025_AAI_241402_1
AAI/AGX/ENGG(E)/CW-01/2025-26
Open Tender
Electrical Works
Works
180 days
O/o SM(Engg. Elect.), AAI, Agatti Airport
Please refer Tender documents.
18 documents required · 18 mandatory
₹1,180
₹46,846
4 Aug 2026
17 Jul 2025
15 Aug 2025
18 Jul 2025
14 Aug 2025
18 Jul 2025
18 Jul 2025 - 24 Jul 2025
Amount
Supply , Installation , Testing and commissioning of 60 KVA capacity online UPS 3 phase input / 3 phase output side with double conversion PWM IGBT technology to drive constant current regulators & suitable for 100% unbalanced load at various load inclluding full load condition as per technical specifications. The UPS shall have built in isolation transformer at input side , automatic static by pass, active input powerfactor correction, phase sequence corrector, pure sine wave output, input - output isolation , compatibility with generator supply , cold start capability , EMI/RFI noise filter , advanced communication port and user friendly LCD display with necessary safety protections , THDi<=5% including transportation , loading unloading etc complete as required.
Supply Installation and testing and commissioning of SMF battery C20 rated for minimum 30 min backup at 60kVA unit pf (Batter bank shall be of 57600 VAH -12V 150 Ah x 32 nos). The job also includes supply and fixing of suitable MS battery rack along with interconnection cables for batteries , suitable capacity power cable interconnections between UPS and Battery Rack etc complete as required. (Note: The battery shall be having 3 yrs OEM Warranty)
Supply, installation, testing, and commissioning of a factory-fabricated 8-way Sub-Main Distribution Board (SMDB) of 250A rating, suitable for 415V, 3-phase, 4-wire system, with short circuit withstand capacity of 36kA for 1 second, IP43 protection, and aluminum busbar system. The panel shall be equipped with 1 No. 160A 3P MCCB as incomer and 8 Nos. 3P MCCBs as outgoing feeders (40A - 03 Nos,63A - 03 Nos, 100A - 02 Nos), enclosed in CRCA steel powder-coated cabinet with Metering Box on Top and bottom cable entry provisions, earth and neutral bars, internal wiring, phase indication lamps, identification labels, and shall be suitable for wall mounting. The SMDB shall conform to IEC 61439-2 / IS 8623 standards and shall be supplied complete with all necessary accessories, cable terminations, earthing connections, transportation, loading and unloading, installation, testing, and commissioning as required.
Earthing with copper earth plate 600 mm x 600 mm x 3 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 meter long etc. with charcoal/ coke and salt as required
All Inclusive Comprehensive maintenance contract of 60kVA UPS, Battery and all electrical equipments installed under this contract including supply and replacement of spares , carrying preventive maintenance once in 03 months as per the manufacturers recommendations and carrying breakdown maintenance etc. complete as required as per the special conditions of the contract on expiry of the Defects Liability Period of 2 Years (1 Job / annum = CMC of 1 UPS for 1 year) Note: The replacement of battery is excluded from scope of CMC after completion of warrenty period of battery
First Year after DLP of Two Years
Second Year after DLP of Two Years
Third Year after DLP of Two Years
Fourth Year after DLP of Two Years
Fifth Year after DLP of Two Years
SUN POWER CONVERSION PVT LTD (BID ID -882412)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .