Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.4 LAccepted-AOC | L1 | Accepted-AOC Awardee | |
| 2 | L2₹38.4 L+₹13.0 L (51.4%)Rejected-Finance | L2 | Rejected-Finance Rate High than L1 | |
| 3 | L3₹48.1 L+₹22.7 L (89.6%)Rejected-Finance 21 5 KM MAIN MATHURA ROAD FARIDABAD FARIDABAD HARYANA 121003 | FARIDABAD | HARYANA | 121003 | L3 | Rejected-Finance Rate High than L1 and L2 | |
| 4 | Rejected-Technical 145 A HSIDC HSIDC SECTOR 31 FARIDABAD FARIDABAD HARYANA 121003 | FARIDABAD | HARYANA | 121003 | - | Rejected-Technical Technically Rejected | |
| 5 | Rejected-Technical | - | Rejected-Technical Technically Rjected |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
10 May 2022, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Executive Officer
GT Road Near Vill Sanwala
Automation and Expansion Of Existing Refrigeration Plant
2022_HBC_218049_1
MUK/Tender/RKVY/2022/109
Open Tender
Machineries/ Mechanical Engg Items
Works
90 days
Vita Milk Plant Kurukshetra
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹2 L
17 Jun 2022
25 Apr 2022
11 May 2022
25 Apr 2022
10 May 2022
25 Apr 2022
90 days
High Stage Compressor for Cold Store KIRLOSKAR/Fric or equivalent reputed make.
Cyclone type oil separator model OSW 150‐40 flanged connections with companion flanges and oil drain valve
ABB/ Siemens make 40 HP, 4‐pole, IE2, IP 55, Class F Insulation, Ambient 50°C, IMB3 mount, TEFC Sq. Cage induction motor suitable for electric supply of 3ph x 415V x 50HZ, AC supply with slide rails for compressor.
L&T/ Equiv make star delta starter for the above motors.
ALFA LAVAL / equiv. make semi welded PHE type water cooled ammonia condenser.
Advance / equiv. make cooling tower for circulation of water through PHE condenser.
Lubi / equiv. make centrifugal pumps suitable capacity of water through chiller against 24 M head. The pump will be complete with coupling, coupling guard, motor, base frame and foundation bolts.
Ammonia receiver of size 20” Dia. x 12’ Long constructed with Liquid inlet and outlet valves, safety valve, charging valve, drain valve, Purge valve, pressure gauge and gauge glass with valves.
ALFA LAVAL make Semi Welded PHE type water chiller with accumulator.
Water Chiller Controls Liquid line solenoid Valve Liquid Level Controller Digital Temp. Indicator Chilled Flow switch BPRV
MS ‘C’ class refrigerant pipes, pipe fittings and ammonia valves to interconnect above equipment in the system comprising of suction, discharge, liquid and oil lines as per PID and based on compact plant layout.
G.I ‘B’ class pipes, pipefitting and valves for condenser make up water, cylinder head cooling defrost and drain line piping as per PID and based on assumption that condenser shall be placed at a distance have not more than 10 m from the plant room.
PUF insulation for accumulators/vessel, suction line, liquid lines and wet return lines with fixing material bitumen/ CPRX compound and aluminum cladding of 26G with in battery limit.
Structural Material for pipe installation and plat form Piping support to be fabricated and installed at site with steel channel and steel angle distance between the supports to be Approx. 5 meters, with variance depend on the building condition.
MCC panel will be cubical type switchboard with bus bar, Incoming ACB, indicating lamps, push buttons, switches, fuses, voltmeters, Voltmeter switch, ammeters, ammeters switch and starter for a) compressors motor, b) condenser fan motor & pump, c) Cooling coil fan motor,
16. Power & Control cabling with cable tray for complete refrigeration plant. Up to 3 HP copper unarmored cable Above 3 HP aluminum armored cable
Manual gas purger with safety valve for purging non‐ condensable Gases from the system.
First charge of ammonia gas and lubricant compressor oil.
Lubi / equiv. make monobloc centrifugal pump set of suitable capacity for compressor jacket cooling.
Installation, Testing & Commissioning of the complete refrigeration plant and putting in operation. Our scope is as follows: Job Erection of the equipment as per our layout with proper operation and alignment Connecting various equipment’s with pipelines, fittings, controls and instruments Painting of Equipment & Piping Pressure testing, charging of gas and commissioning of the plant.
5 amp 2 way switch (HSR Code no. 23.8.11.2)
15 amp 1 way switch (HSR Code no. 23.8.11.3)
5 amp Socket (HSR Code no. 23.8.11.4)
15 amp 6 pin Socket (HSR Code no. 23.8.11.5)
Supply and erection of 25mm PVC CONDUIT ISi marked (Medium) recessed in walVceiling etc. including the cost of PVC bends, inspection boxes, iron hooks and cement concrete etc. complete in all respect up to the entire satisfaction of Engineer-in-Charge of work (HSR Code no. 23.7.6.2)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .