Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.8 LAccepted-AOC FLAT NO 7 MHAMBRE BLDG DR FRANCISCO LUIS GOMES ROAD VASCO DA GAMA GOA 403 802 | SOUTH GOA | GOA | 403802 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹43.4 L+₹7.6 L (21.4%)Rejected-Finance | L2 | Rejected-Finance HIGHER BIDDER | |
| 3 | L3₹43.5 L+₹7.7 L (21.5%)Rejected-Finance SALGAONKAR HOUSE DRIVERS HILL VASCO DA GAMA GOA 403802 | SOUTH GOA | GOA | 403802 | L3 | Rejected-Finance HIGHER BIDDER | |
| 4 | L4₹44.3 L+₹8.5 L (23.8%)Rejected-Finance FLAT NO 4 VIRGINIA CO OP HOUSING SOCIETY AIR PORT ROAD CHICALIM VASCO DA GAMA GOA 403 711 | SOUTH GOA | GOA | 403711 | L4 | Rejected-Finance HIGHER BIDDER | |
| 5 | L5₹45.6 L+₹9.8 L (27.3%)Rejected-Finance C2 PAIXOMONTIRO APTS BEHIND NSD ALTO DABOLIM VASCO DA GAMA GOA 403 801 | SOUTH GOA | GOA | 403801 | L5 | Rejected-Finance HIGHER BIDDER |
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
7 Jun 2022, 6:00 pmClosed
SHRI BIJENDRA SHARMA IDSE EE
GARRISON ENGINEER (NW) VASCO Opposite KV No.2, School, Shantinagar, Vasco-Da-Gama, Goa-403802
8438/22/E8
2022_MES_513963_2
8438/22/E8
Open Tender
Civil Works
Item Rate
365 days
VASCO
Class D Category a i
9 documents required · 9 mandatory
₹500
Yes
GE NW VASCO
₹90,000
Yes
1 Jul 2022
18 May 2022
9 Jun 2022
18 May 2022
7 Jun 2022
31 May 2022
19 May 2022 - 31 May 2022
Amount
M&L for Removing old paint by removers or burninig off by blow lamps and cleaning with scrapers, any number of coats, any width or girth as specified and as directed by Engineer-in-Charge.
M&L for priming paint, for brick, stone, concrete, asbestos cement or plasterd surface as specified and as directed by Engineer-in-Charge.
M & L preperation of new painted bituminous / concrete, flexible or rigid surfaces over 10 cm width and applying two coats of runway marking paint water based (white/golden yellow) to lines, dashes arrows, letters etc with necessary painting rollers, all as specified and directed. Notes:- (a) Painting will be carried out by using water base road marking painting machine. (b) Conditions for approval and procurement of materials shall be read in conjunction with "special conditions of tender documents elaborated in paras 4,5 & 6 and further subsequent sub paras.
M & L preperation of old painted bituminous / concrete, flexible or rigid surfaces over 10 cm width and applying two coats of runway marking paint water based (white/golden yellow) to lines, dashes arrows, letters etc with necessary painting rollers, all as specified and directed. Note : (a) Painting will be carried out twice in a year (5-6 months interval) or and when required. (b) Runway full center line painting will be regularly carried out by monthly or and as when required basis as relevent sch given below. (c) Painting will be carried out by using water base road marking painting machine. (d) Conditions for approval and procurement of materials shall be read in conjunction with "special conditions of tender documents elaborated in paras 4,5 & 6 and further subsequent sub paras.
All as per item No. 4.00 above, second time painting for the same location above for centre line touch down area only, 14 days gap after first time painting or as and when required basis.
All as per item No. 4.00 above, third time painting for the same location above for full centre line only, 14 days gap after second time painting or as and when required basis.
All as per item No. 4.00 above, fourth time painting for the same location above for centre line touch down area only, 14 days gap after third time painting or as and when required basis.
All as per item No. 4.00 above, fifth time painting for the same location above for full centre line only, 14 days after fourth time painting or as and when required basis.
All as per item No. 4.00 above, sixth time painting for the same location above for centre line touch down area only, 14 days gap after fifthtime painting or as and when required basis.
All as per item No. 4.00 above, seventh time painting for the same location above for centre line only, 14 days gap after sixth time painting or as and when required basis.
All as per item No. 4.00 above, eighth time painting for the same location above for centre line touch down area only, 14 days gap after seventh time painting or as and when required basis.
All as per item No. 4.00 above, nineth time painting for the same location above for full centre line only, 14 days after eighth time painting or as and when required basis.
All as per item No. 4.00 above, tenth time painting for the same location above for centre line touch down area only, 14 days after nineth time painting or as and when required basis.
All as per item No. 4.00 above, eleventh time painting for the same location above for full centre line only, 14 days after tenth time painting or as and when required basis.
All as per item No. 4.00 above, twelveth time painting for the same location above for centre line touch down area only, 14 days after eleventh time painting or as and when required basis.
M & L preperation of old painted bituminous / concrete, flexible or rigid surfaces over 10 cm width and applying one coat of runway marking paint water based (white/golden yellow) to lines, dashes arrows, letters etc with necessary painting rollers, all as specified and directed. (Make - Asian, Shalimar, Berger, Johnson & Nicolson or equivalent) Notes - (a) Painting will be carried out twice in a yr (5-6 months interval) or and when required. (b) Runway full center line painting will be regularly carried out by monthly or and as when required as relevant sch given below. (c) Painting will be carried out by using water base road marking painting machine. (d) Conditions for approval and procurement of materials shall be read in conjunction wit "special conditions of tender documents elaborated in paras 4,5& 6 and further subsequent sub paras.
All as per item No. 16.00 above, first time painting for the same location above for centre line touch down area only, 14 days gap after above work painting or as and when required basis.
All as per item No. 16.00 above, second time painting for the same location above for full centre line only, 14 days gap after first time painting or as and when required basis.
All as per item No. 16.00 above, third time painting for the same location above for centre line touch down area only, 14 days gap after second time painting or as and when required basis.
All as per item No. 16.00 above, fourth time painting for the same location above for full centre line only, 14 days gap after third time painting or as and when required basis.
All as per item No. 16.00 above, fifth time painting for the same location above for centre line touch down area only, 14 days gap after fourth time painting or as and when required basis.
All as per item No. 16.00 above, sixth time painting for the same location above for full centre line only, 14 days gap after fifth time painting or as and when required basis.
All as per item No. 16.00 above, seventh time painting for the same location above for centre line touch down area only, 14 days gap after sixth time painting or as and when required basis.
All as per item No. 16.00 above, eightth time painting for the same location above for full centre line only, 14 days gap after seventh time painting or as and when required basis.
All as per item No. 16.00 above, nineth time painting for the same location above for centre line touch down area only, 14 days gap after eightth time painting or as and when required basis.
All as per item No. 16.00 above, tenth time painting for the same location above for centre line only, 14 days gap after nineth time painting or as and when required basis.
Preparation of old painted concrete flecxible or rigid surface exc 10 cm width and applying one coat of synthetic enamel paint First quality including side black strip 1 inch wide on both sides where required all as specified and as directed
M&L for Demolition of concrete of any description and in any position not otherwise specifically provided for
M&L for Removal of demolished material exc 1.5km but not exeed 5km and depositing where directed.
M&L TMT bars 10mm and over dia cut to length bent to shape required including bending hooking binding with mild steel wire not less than 0.90mm dia.
M&L For precast RCC slab (1:2:4 type B1) using 20mm graded aggregate set CM 1:6 as in cover slab.
SACHIN CONSTRUCTIONS
Tara Construction
M/S jvsr constructions
M/S P S BABU
M/s Abhay Enterprises
M/S DUBAL CONSTRUCTION
M/s. R.S. LAWANDE
Super Construction
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .