Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | -30.50% | ₹2.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.2 L+₹14,447.86 (7.09%)Admitted-Fee/PreQual/Technical/Finance | -25.57% | ₹2.2 L+₹14,447.86 (7.09%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.4 L+₹36,339.44 (17.8%)Admitted-Fee/PreQual/Technical/Finance | -18.10% | ₹2.4 L+₹36,339.44 (17.8%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.6 L+₹57,146.70 (28.1%)Admitted-Fee/PreQual/Technical/Finance | -11.00% | ₹2.6 L+₹57,146.70 (28.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹2.7 L+₹63,007.90 (30.9%)Admitted-Fee/PreQual/Technical/Finance | -9.00% | ₹2.7 L+₹63,007.90 (30.9%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹6,000
Closing Date
6 May 2026, 3:00 pmClosed
Executive Engineer IFC Handwara
Executive Engineer IFC Handwara
Construction of Protection Bund near land of Mohd Jamal Lone ward No. 2 at Baderkal Block Handwara.
2026_IFC_308517_1
04-IFCD/HND/2026-27
Open Tender
Civil Works
Percentage
Executive Engineer IFCD Handwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer IFC Division Handwara
₹6,000
18 May 2026
23 Apr 2026
7 May 2026
23 Apr 2026
6 May 2026
23 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | - | Cum | - | - |
| - | Providing and laying of stone soling | - | Cum | - | - |
| - | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 mix | - | Cum | - | - |
| - | Centring and shuttering incld. Srtutting, propping etc and removal of form work for. Retaining walls, return walls, walls (any thickness) incld, attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc. | - | Sqm | - | - |
| - | Providing and laying in position cement concrete of specified grade incld. Curing but excld. The cost of centring and shuttering. All work upto plinth level with 1:3:6 mix | - | Cum | - | - |
| - | Providing andlaying 12mm thick cement plaster in 1:4 mix | - | Sqm | - | - |
| - | Carriage of materials by M/T incld. Loading, unloading and stacking. | - | - | - | - |
| - | Stone solling by an avg lead of 10km | - | Cum | - | - |
| - | Stone agg. 20mm by an avg lead of 30kms | - | Cum | - | - |
| - | Sand by avg lead of 30kms | - | Cum | - | - |
stage.html
html • 0.02 MB
finance_999714.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_999714.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .