Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹3.8 LAccepted-AOC RAHIMPUR VILLAGE BIJNOR DISTRICT BIJNOR | BIJNOR | UTTAR PRADESH | 246701 | L-1 | Accepted-AOC AOC | |
| 2 | L-2₹4.2 L+₹41,377.75 (10.9%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | Rejected-Technical | - | Rejected-Technical As per Tender notice Terms and conditions Sl. No. 6(viii) |
Tender Value
₹4.5 L
EMD Value
₹9,000
Closing Date
25 Sept 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, BDGC, BSR
EE, BDGC, BSR
Repairs of Ghat on Down stream of V.R.B. on Mainkalda Dy at Km 7.010
2023_UPIDC_836101_31
05/EE/2023-24
Open Tender
Civil Works
Fixed-rate
90 days
Bulandshahr
FEE/EMD/TECH
2 documents required · 2 mandatory
₹177
₹9,000
2 Feb 2024
19 Sept 2023
25 Sept 2023
19 Sept 2023
25 Sept 2023
19 Sept 2023
Amount
Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation
Laying C.C. 1:3:6 in foundation with cement, coarse sand and stone grit 10 to 25 mm. size including all cost of material, labour and T&P etc. complete.
M-150 Brick work in 1:4 cement and coarse sand mortar i/c all cost of material, labour and T&P etc. complete.
Centering & Shuttering C. C. work including rent of shuttering materal,labour and T&P required for proper completon of work for slab, lintels, sun shades, columns & wall etc including cost of all material labur and T&P complete
Laying C.C. in 1:1.5:3 cement, coarse sand and stone grit 10-25 mm. size of material, labour and T&P etc. complete.
P/L cement Struck deep pointing in 1:2 cement sand mortar i/c all cost of material, labour and T&P etc. complete.
P/L 12.50mm thick cement plaster in 1:4 cement mortar all material, labour and T&P.
Finishing outer wall with weather coat by (asian or Berger Brand) of approved make and Quality of surface with two or more xoat to given an even shade thorougly brushing the surface free from mortat dropping and other foreign matters and sad papered sooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work
Cleaning thick bushes & thorny jungle without uprooting with disposal as per direction of engineer in charge
Earth work in embankment by power tranported earth with a lead beyond 200m. and upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders.
AMIT KUMAR GARG
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .