| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 CrAccepted-AOC NA | NA | NA | 121004 | L1 | Accepted-AOC Work allotted to M/s Anand Engineering Enterprises | |
| 2 | L2₹10.9 Cr+₹13.4 L (1.24%)Rejected-Finance | L2 | Rejected-Finance Reject | |
| 3 | L3₹11.0 Cr+₹16.1 L (1.49%)Rejected-Finance GIRIDIH JHARKHAND | HAZARIBAGH | JHARKHAND | 825301 | L3 | Rejected-Finance Reject | |
| 4 | L4₹11.1 Cr+₹27.6 L (2.56%)Rejected-Finance H NO 73 OLD A G CO OPERATIVE SOCIETY RANCHI JHARKHAND 834002 | RANCHI | RANCHI | JHARKHAND | 834002 | L4 | Rejected-Finance Reject |
Tender Value
₹11.0 Cr
EMD Value
₹21.9 L
Closing Date
19 Jan 2024, 5:00 pmClosed
Executive Engineer, RWD, Works Division, Giridih
RWD, Works Division, Giridih, 3rd Floor, New Collectorate Building, Paprwatand, Giridih-815301
Special Repair of Road from (i) Khurchutta P.W.D. Road to Nursery More via Chitmadih (L-6.600 Km.), (ii) Dighariyakala REO Road to Belatand REO Road (L-3.000 Km.), (iii) Sonbad Shiv Mandir to Motileda (L-4.700 Km.), (iv) Pesrotand to Barkitand...
2024_RWD_80621_1
14/RI/2023-24/RWD/EE/GIRIDIH
Open Tender
Civil Works
Percentage
270 days
Giridih
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹21.9 L
16 Mar 2024
12 Jan 2024
22 Jan 2024
12 Jan 2024
19 Jan 2024
12 Jan 2024
12 Jan 2024 - 19 Jan 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (i) Khurchutta P.W.D. Road to Nursery More via Chitmadih (L-6.600 Km.)
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201 | 1.92 | Ha | 19,760.3 | ₹37,939.78 |
| - | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres.
By Mechanaical Means using Hydraulic excavator. | 1,131.3 | M2 | 4 | ₹4,525.2 |
| - | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) | 6,994.85 | M3 | 131.3 | ₹9,18,423.81 |
| - | Granular Sub-Base with Coarse Graded Material (Table:- 400- 1)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
With Grading-I Material | 377.33 | M3 | 2,008.55 | ₹7,57,886.17 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 349.02 | M3 | 2,288.96 | ₹7,98,892.82 |
| - | Prime Coat over WMM/WBM (Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.) | 2,326.79 | M2 | 81.38 | ₹1,89,354.17 |
| - | Tack Coat on Granular surfaces treated with primer
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface cleaned with mechanical broom. | 2,326.79 | M2 | 15.95 | ₹37,112.3 |
| - | Tack Coat on Bituminous surfaces
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 34,146.83 | M2 | 12.91 | ₹4,40,835.58 |
| - | Bituminous Macadam Grading-II with VG-30 Grade Packed Bitumen (Providing and laying bituminous macadam with higher capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.) | 911.84 | M3 | 8,212.19 | ₹74,88,203.33 |
| - | Semi-Dense Bituminous Concrete (Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.)
for Grading-II (10 mm nominal size) | 455.92 | M3 | 10,669.91 | ₹48,64,625.37 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_107821.xls
BOQ Document • 0.38 MB
137159579.pdf
Tender Document • 0.61 MB
DOUBLEF2BIDDOCUMENT.pdf
Tender Document • 0.53 MB
137159581.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .