| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹14.1 LAccepted-AOC QR NO SPO 26 MPPGCL COLONY PRAKASH NAGAR BIRSINGHPUR PALI DISTT UMARIA M P | l1 | Accepted-AOC being l1 bidder | |
| 2 | l2₹12.7 L+₹81,827.58 (6.86%)Rejected-Finance | l2 | Rejected-Finance HIGHLY QUOTED | |
| 3 | l3₹13.4 L+₹1.5 L (12.4%)Rejected-Finance BAIKUNTHPUR DISTT REWA M P | BAIKUNTHPUR | REWA | MADHYA PRADESH | l3 | Rejected-Finance HIGHLY QUOTED |
Tender Value
₹16.1 L
EMD Value
₹40,300
Closing Date
13 May 2020, 3:30 pmClosed
S.K.SHUKLA
O/o Addl .C.E.(THC) MPPGCL SIRMOUR
Annual operation and maintenance of gates of Beehar Barrage Tail regulator and Cross regulator, gates of link canal of THP 3x105 MW Sirmour.
2020_MPPGC_81900_1
91-84/PNW/CIVIL/3641
Open Tender
Civil Works - Others
Item Rate
365 days
SIRMOUR
AS PER CLAUSE NO. 10 OF NIT
6 documents required · 6 mandatory
₹1,000
Yes
Payable To
₹40,300
Yes
8 Feb 2021
27 Apr 2020
15 May 2020
27 Apr 2020
13 May 2020
27 Apr 2020
During monsoon operation and maintenance of Beehar Barrage gates, Tail Regulator, Cross regulator gates of link Canal Size stated below including operation of stop log gates, gantry crane and generator set all routine checking, lubrication/ replacement of minor parts as required maintenance of street light etc by deploying minimum daily 6 skilled & 6 semi skilled labour including one skilled labour as mechanic cum opertor for DG set specially from this year ( total 6 skilled 6 semi skilled labour ) as directed by Engineer- in- Charge (Period three month)
(A) Beehar Barrage Gates
(i) Spillway gates (Size 3.50 m x 12.00 m)- 14 no.
(ii) Under sluice gates (6.00 x 9.00 m) - 4 no.
(iii) Head Regulator gates (2.00m x 10.00 m)- 6 no.
(B) Link Canal Gates
(i) Tail Regulator Gates (6.40m x 9.00m)- 3 no.
(ii) Cross Regulator Gates (5.00m x 4.30m) - 2 no.
29 no. gate i.e. 1 Job
Post mansoon operation and maintenance of Beehar Barrage gates , Tail regulator & Cross regulator gates of size stated below and, generator set, gantry crane and street lightetc.including routine cheking ; cleaning oiling and lubrication;replacement of minor parts as required by deploying 2 skilled and 3 semi skilled labour daily as per directed by Engg- incharge (period two month)
(A) Beehar Barrage Gates
(i) Spillway gates (Size 3.50 m x 12.00 m)- 14 no.
(ii) Under sluice gates (6.00 x 9.00 m) - 4 no.
(iii) Head Regulator gates (2.00m x 10.00 m)- 6 no.
(B) Link Canal Gates
(i) Tail Regulator Gates (6.40m x 9.00m)- 3 no.
(ii) Cross Regulator Gates (5.00m x 4.30m)- 2 no.
29 no. gates i.e. 1 job
General Operation & maintenance of Beehar Barrage gates Tail Regulator & Cross Regulator of Size stated below & generator set gantry crane & street light etc including routine checking, cleaning, oiling & lubrication, replacement of minor parts as required by deploying daily 1 skilled & 1 semiskilled labour as directed by Engineer -in-charge. (Period Five months)
(A) Beehar Barrage Gates
(i) Spillway gates (Size 3.50 m x 12.00 m)- 14 no.
(ii) Under sluice gates (6.00 x 9.00 m) - 4 no.
(iii) Head Regulator gates (2.00m x 10.00 m)- 6 no.
(B) Link Canal Gates
(i) Tail Regulator Gates (6.40m x 9.00m)- 3 no.
(ii) Cross Regulator Gates (5.00m x 4.30m)- 2 no.
29 no. gates i.e. 1 Job
Pre mansoon maintenance of spillway gates, Under sluice gates, Head regulator gates, Tail regulator & Cross regulator gates of link Canal, generator set, gantry crane etc. including general cleaning of gates, hoists, removal of spiders nets honeycomb etc. general checking and tightening of nut bolts of mechanical and structural parts. Lubrication of bushes bearings, plummer blocks gear, chain links, manual system and other parts with suitable lubricant i.e. EP-1/EP-3, oiling of worm reducers including gauging of oil , filling and oil changing (Servo-320) if required, Compounding of wire ropes by rope compound, Checking of electrical panels and motor etc. including cleaning and replacement of faulty wiring and parts etc. like contactors, relays, HRC fuses, connector, MCB’s switches, lamps, plug, sockets, bulbs and other parts etc. General checkup and maintenance of generator and lighting system of area, operation of stop log gates, i/c cutting/welding by electric or gas as per requirement etc. complete making them ready for smooth & trouble free operation with testing of gates, i/c all T&P, tackles, labour safety arrangement complete by deploying daily minimum 3 skilled & 5 semi skilled labour and as directed by the Engineer-in-charge. (Period-Two month)
(A) Beehar Barrage Gates
(i) Spillway gates (Size 3.50 m x 12.00 m)- 14 no.
(ii) Under sluice gates (6.00x9.00m) 04 No.
(iii) Head Regulator gates (2.00m x 10.00 m)- 6 no.
(B) Link Canal Gates
(i) Tail Regulator Gates (6.40m x 9.00m)- 3 no.
(ii) Cross Regulator Gates (5.00m x 4.30m)- 2 no.
29 no. gate i.e. 1 Job
Part -B
Complete rewinding and repair of electric motor including replacement of bushes , bearing and terminal plates etc. Brake coil including removing from site location , complete rewinding as per original with copper winiding wire , fitting at position , testing etc. complete including cost of all T&P, labour cost of wire etc. complete ( Burnt wire shall be retained by contractor)
(i) 7.5 HP motor slip ring
(ii)7.5 HP motor
(iii) 5 HP motor
(iv) 3 HP motor
(v)Brake coil
Part- C - Supply of material
Servo Gem EP- 1
Servo Gem EP- 3
Survo coat – 120, (Rope compound)
MCB, SPN 10Amp
Multi Strent copper wire 2.50mm2 Make- Bonton, Havells
Fitting/ fixtures of HPSV 70 Watt , make - Philips/ Bajaj
(i) Lamp
(ii) Choke
(iii) Ignitor
(iv) Condensor 10 mfd
Restoline bottle ( 1 Bottle 400 ml)
MCB 6 Amp(for IocaI paneI) 2 Phase
MCB 10 Amp(for IocaI paneI) 2 Phase
MCB 10 AMP singIe phase
MCB 16 AMP 3 phase
MCB 32 AMP 3 phase
Sphericall Roller bearing No. 23226CC/W33 of SKF make
HRC fuse 16 Amp
HRC fuse 32 Amp
HRC fuse 63 Amp
Cutting electrode of size 3.15 mm x 450 mm
LED bulb of 23 watt of Philips or Havels make
Steel wire rope (Usha Martin Make) 36 mm Dia 6/37 ungalvanished ordinary lay fibre core of strength 1770 KN (IS-2266-1977)
TECHNOCRAT ENGINEERING WORKS
C S ENGINEERING WORKS
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .