| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.6 LAdmitted-Finance | ₹24.6 L | L1 | Admitted-Finance |
| 2 | L2₹24.9 LAdmitted-Finance | ₹24.9 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Kannagi Constructions L1 | Sharveshwaran Constructions L2 |
|---|---|---|---|---|---|
| 1.001.Construction of Two Class Room School Building st St Antony Hr Sec School Village H/O Palepalli | |||||
| 2.00 | Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete | 120.01 | Cum | 246.42 ₹29,572.86 | 249.01 ₹29,883.69 |
| 3.00 | Supply and Filling the basement Excavated earth other than sand including cost and Conveyance of all site etc. Complete. | 71.48 | Cum | 42.83 ₹3,061.49 | 43.28 ₹3,093.65 |
| 4.00 | Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers | 23.64 | Cum | 4,916.47 ₹1.2 L | 4,968.12 ₹1.2 L |
| 5.00Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid) | |||||
| 6.00 | Centering For BGL | 71.5 | Sqm | 516.29 ₹36,914.74 | 521.72 ₹37,302.98 |
| 7.00 | For Column | 156.17 | Sqm | 1,032.59 ₹1.6 L | 1,043.43 ₹1.6 L |
| 8.00 | For Lintel & Roof level Beam | 112.49 | Sqm | 1,135.85 ₹1.3 L | 1,147.78 ₹1.3 L |
| 9.00 | Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | 53.62 | Cum | 8,697.62 ₹4.7 L | 8,788.98 ₹4.7 L |
| 10.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS | 4.95 | Mt | 89,847.55 ₹4.4 L | 90,791.32 ₹4.5 L |
Tender Value
₹25 L
EMD Value
₹25,000
Closing Date
18 Dec 2025, 3:00 pmClosed
The Block Development Officer
The Block Development Officer
Keishnagiri dt Bargur Block MPLADS 2025 26 Construction of two class room school building at st antony hr sec school at palepalli panchayat BRG_32
2025_RDTN_632953_1
2092_2025_R7_DT_07_07_2025
Open Tender
Civil Works - Others
180 days
The Block Development Officer
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25,000
13 Feb 2026
16 Dec 2025
18 Dec 2025
16 Dec 2025
18 Dec 2025
16 Dec 2025
1.Construction of Two Class Room School Building st St Antony Hr Sec School Village H/O Palepalli
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete
Supply and Filling the basement Excavated earth other than sand including cost and Conveyance of all site etc. Complete.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Centering For BGL
For Column
For Lintel & Roof level Beam
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. .
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction. .
Brick partition walls using country bricks of size 83/4"x41/4"x23/4" etc., complete.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Providing the following thickness of Granolothic pattern floor finishing with plain cement concrete cc 1:2: 4 using 10 mm to 12 mm size hard broken stone jelly and the top rubbed smooth etc complete complying with standard specification
Supply and Cost of Steel door , Window, Ventilator
Supply and Cost of Steel door , Window, Ventilator
Distembering two coats including priming coat with best approved distember and primer including costand conveyance of all materials to site and all labour charges etc
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supply and fixing of Cuddappa Slab 40mm Thick including cost and Conveyance of all site etc. Complete.
Supply and Fixing PVC Rain Water Down Fall Pipe
Provision for Electrification
Light and Fan Point
Copper Leads SD 88
Wiringwith2x1.5sq.mmPVCinsulatedSCunsheathedFRLScopperconductorof1100VgradeinsuitablePVCrigidpipeconcealedinwallandthecellingwithPVCaccessoriesinflushwithwallwithsuitableflushtypeTWswitchboxtohousethecontrolswitchandregulatorandcoveredwith3mmthickhylernsheetwithcontinuousearthwireconnectionof1.5sq.mmcopperwiremakinggoodoftheconcealedportionwithsuitablecolourforconcealedfanpoint(forrheostatic type fan regulator)
Ceiling Fan
WT Bulk Head Fitting
Supplyandrunof4of4sq.mm.PVCinsulatedSCunsheathedFRLScopperconductorof1100Vgradeon7/20GIbearer wire for service connection mains
Supplyandrunof4of4sq.mm.PVCinsulatedSCunsheathedFRLScopperconductorof1100Vgradein25mmdiaGIpipe (Class 'B') bent at both ends with necessary angle iron up right and end supports for mains
16Amps DP Switch
Computer Plug Point
Wall Sockets
Earthing
Provision of Chappal Rack
Brick work using country bricks of size 83/4"x41/4"x23/4" in cement mortar 1:5 (One cement and five M.Sand) including curing neat finishing, etc., complete complying with standard specifiction.
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of cement paint over one coat of cement primer as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The colour and shade of the cement paint shall be got approved by the Executive Engineer before use of work).
Supply and fixing of Cuddappa Slab 40mm Thick including cost and Conveyance of all site etc. Complete.
Provision for RWH including pipes
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Collection and supply of sand filling into the basement including cost and conveyance to the site and all labour charges.
Brick work in CM 1:5 mix using country bricks ground moulded of size 22 x 11 x 7cm for the following including curing etc., complete complying with standard specifications.
Collection and supply of filling the stones in soakpit including cost and conveyance of materials to the work site and all labour charges
40mm Metal
20mm Metal
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Provisions for supply and fixing of precast RCC cover slab including cost and conveyance of materials and all labour charges
Provision for writing Name board
Provision for Photo Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.67 MB
PB_32.pdf
Tender Documents • 0.59 MB
TB_32.pdf
Tender Documents • 0.65 MB
BOQ_757262.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid